Difference between revisions of "Talk:102.2 Contractor Performance Rating System"
Jump to navigation
Jump to search
(New page: Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they kno...) |
m |
||
(One intermediate revision by one other user not shown) | |||
Line 1: | Line 1: | ||
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. | Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. | ||
Thanks! | Thanks! | ||
+ | Robert St.Gemme SCI Festus Project Office | ||
+ | |||
+ | [[USER:smithk|Keith L. Smith:]] Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form. |
Latest revision as of 10:12, 2 July 2014
Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. Thanks! Robert St.Gemme SCI Festus Project Office
Keith L. Smith: Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form.