Difference between revisions of "103.2 Contract Bond for Sec 103.4"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (added link to new EPG 152)
(updated per RR3958)
 
(2 intermediate revisions by one other user not shown)
Line 1: Line 1:
[[:Category:152 Contactor Bonding Responsibilities|EPG 152 Contactor Bonding Responsibilities]] and [http://www.modot.mo.gov/business/standards_and_specs/Sec0103.pdf Sec. 103.4] provide information regarding the contract bond.
+
</br>
 
+
<div style="text-align: center; margin-top:0; margin-right:auto; margin-bottom:0; margin-left:auto; border:1px solid black; width:50%; background-color:white; padding:5px; border-radius:5px; box-shadow:10px 10px 5px #888888">
For contracts that include a pay item for mobilization, the contractor may submit a request for an upfront reimbursement payment for the cost of the contract bond, as well as the cost of any railroad liability insurance (see [http://www.modot.state.mo.us/business/standards_and_specs/Sec0618.pdf Sec 618]).  The contractor will need to submit this request to the Resident Engineer along with invoices that verify the cost of the bond and/or railroad liability insurance. The RE will then issue a no-cost change order to add a pay item for these costs and to reduce the cost of mobilization by an equal amount. See the [[:Category:101 Standard Forms#Change Orders – Mobilization and Contract Bond|QRG Change Orders - Mobilization and Contract Bond]] for instructions on how to process this change order in SM[[image:bulldozer.jpg|20px]]. If the change order is exclusively issued to pay bond/insurance, then the contractor’s signature on the change order is not required and no higher level approval is required, including federal oversight projects.  Contracts that do not include a pay item for mobilization, such as [[147.3 Job Order Contracting (JOC)|Job Order Contracts]] and [[:Category:402 Bituminous Surface Leveling|Contract Level Course]] projects, are not eligible for this reimbursement since they do not include a pay item for mobilization.
+
</br>
 
+
<b>This article has been removed. You can still view the history of this article by selecting the View history button.</b></br>
 
+
<b>See [https://www.modot.org/missouri-standard-specifications-highway-construction Missouri Standard Specifications for Highway Construction Sec 103.4 Contract Bond Required] for more information.</b>
 
+
</br>
 
+
</br>
 
+
</div>
 
 
[[Category:103 Award and Execution of Contract]]
 

Latest revision as of 11:39, 19 November 2024



This article has been removed. You can still view the history of this article by selecting the View history button.
See Missouri Standard Specifications for Highway Construction Sec 103.4 Contract Bond Required for more information.