Category:102 Bidding Requirements and Conditions: Difference between revisions
m updated links |
m updated formatting |
||
| (19 intermediate revisions by 2 users not shown) | |||
| Line 1: | Line 1: | ||
<div style="float: right; margin: 5px; margin-bottom: 10px; padding: 10px; border: 1px solid black; border-radius:5px; box-shadow:5px 5px 5px #888888"> | |||
<categorytree mode=all>102 Bidding Requirements and Conditions</categorytree> | |||
</div> | |||
One of the essential functions of the Highway and Transportation Commission and MoDOT is to provide a transportation network for the citizens of Missouri and those that travel through the state. | One of the essential functions of the Highway and Transportation Commission and MoDOT is to provide a transportation network for the citizens of Missouri and those that travel through the state. One of the ways this is accomplished is by contracting with outside companies to provide improvements to the state's highway infrastructure. | ||
In 1921 the authority to prepare plans and make estimates, let all contracts, provide uniform highway markings and purchase or lease land was prescribed by the governor through Centennial Road Law. | In 1921 the authority to prepare plans and make estimates, let all contracts, provide uniform highway markings and purchase or lease land was prescribed by the governor through Centennial Road Law. At that time the system included approximately 6,000 miles of secondary roads and 1,500 miles of primary roads. Today MoDOT maintains more than 33,600 miles of roadway along with other modes of transportation. Contract bidding is essential in maintaining this vast system. | ||
{| style="padding: 0.3em; margin-left:1px; border:2px solid #a9a9a9; text-align:left; font-size: 100%; background:#f5f5f5" align="center" | |||
{|style="padding: 0.3em; margin- | |||
|- | |- | ||
|colspan="3" align="center" style="font-size:130%"|'''Doing Business with MoDOT Bidding and Contract Services:''' | |colspan="3" align="center" style="font-size:130%"|'''Doing Business with MoDOT Bidding and Contract Services:''' | ||
| Line 13: | Line 13: | ||
|colspan="3" align="center" style="font-size:130%"|'''Bidding on Highway Construction Projects''' | |colspan="3" align="center" style="font-size:130%"|'''Bidding on Highway Construction Projects''' | ||
|- | |- | ||
|colspan="2"|The Design Division is responsible for advertising, letting and awarding MoDOT’s highway construction and maintenance projects. See [ | |colspan="2"|The Design Division is responsible for advertising, letting and awarding MoDOT’s highway construction and maintenance projects. See [https://www.modot.org/bid-opening-info MoDOT’s Bid Opening Information website].||rowspan="3" align="center"|[[Image:102.1 Bidding Requirements and Conditions.jpg|220px]] | ||
|- | |- | ||
|colspan="2"|'''Prequalification of Bidders.''' To bid as a prime contractor, vendors must either have a Prequalification Contractor Questionnaire (in order to bid on projects of any size) or a Contractor Questionnaire (in order to bid on only projects under $2,000,000) approved and on file with MoDOT, along with the required documentation 7 days prior to the bid opening. [ | |colspan="2"|'''Prequalification of Bidders.''' To bid as a prime contractor, vendors must either have a Prequalification Contractor Questionnaire (in order to bid on projects of any size) or a Contractor Questionnaire (in order to bid on only projects under $2,000,000) approved and on file with MoDOT, along with the required documentation 7 days prior to the bid opening. [https://www.modot.org/becoming-prime-contractor-modot Both forms can be found online]. | ||
|- | |- | ||
|colspan="2"| | |colspan="2"|'''Subcontracting.''' Prime contractors use subcontractors for numerous elements of an individual contract. On each contract, a prime contractor may propose to MoDOT the subcontractor(s) needed for an individual contract. Although MoDOT has no contractual relationship with subcontractors, MoDOT maintains a review and approval process for proposed subcontractor utilization. This process is included in [[:Category:108 Prosecution and Progress|EPG 108 Prosecution and Progress]]. MoDOT also maintains a listing of sub-contractors that are approved for use on Commission contracts as a convenience to the contracting community. To be included on this listing, a contractor is required to [https://www.modot.org/perform-subcontracting-work submit information for review]. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Advertisement of Bid Opening.''' MoDOT publishes a 3-month [https://www.modot.org/bid-opening-info tentative letting schedule (located under "Documents")] on a monthly basis. The official advertisement for the current month is published 5 weeks prior to the bid opening date. A proposal specific advertisement can also be found in local newspapers. Supplemental advertisements may be posted up to 3 weeks prior to the bid opening. In addition, MoDOT may hold a special bid opening as needed. Preliminary Quantities are posted on MoDOT’s website for each letting. | ||
|- | |- | ||
|colspan="2"|MoDOT also publishes advertisements for federally funded local projects that are administered by cities and counties.||rowspan=" | |colspan="2"|MoDOT also publishes advertisements for federally funded local projects that are administered by cities and counties.||rowspan="15" width=280 align="center"| '''Useful MoDOT Websites''' | ||
[http://www.modot.org/business/contractor_resources/bidOpenIndex.shtml Bid Opening Information] | [http://www.modot.org/business/contractor_resources/bidOpenIndex.shtml Bid Opening Information] | ||
[ | [https://www.modot.org/bidding Bidding and Contracting Opportunities] | ||
[ | [https://www.modot.org/welcome-business-development-and-compliance Business Development and Compliance] | ||
[ | [https://www.modot.org/forms-contractor-use Forms for Contractor Use] | ||
[ | [https://www.modot.org/how-become-modot-subcontractor How to Become a MoDOT Subcontractor] | ||
[ | [https://www.modot.org/how-become-modot-vendor-purpose-obtaining-plans How to Become a MoDOT Vendor for the Purpose of Obtaining Plans] | ||
[ | [https://www6.modot.mo.gov/MRCC/Home/PublicSearch Missouri Regional Certification Committee (MRCC) Disadvantaged Business Enterprise] | ||
[ | [https://modotweb.modot.mo.gov/BidLettingPlansRoom/Letting MoDOT's Online Plans Room] | ||
[ | [https://www.modot.org/missouri-standard-specifications-highway-construction Standard Specifications] | ||
'''Other Useful Websites''' | '''Other Useful Websites''' | ||
| Line 51: | Line 45: | ||
[http://www.bidx.com Bid Express] | [http://www.bidx.com Bid Express] | ||
[ | [https://oeo.mo.gov/ MO Office of Equal Opportunity] | ||
[https://revisor.mo.gov/main/OneSection.aspx?section=610 RSMO.610] | [https://revisor.mo.gov/main/OneSection.aspx?section=610 RSMO.610] | ||
|- | |- | ||
|colspan="2"|'''Bidding Documents.''' Plans, specifications and bidding documents can be accessed at [ | |colspan="2"|'''Bidding Documents.''' Plans, specifications and bidding documents can be accessed at [https://modotweb.modot.mo.gov/BidLettingPlansRoom/Letting MoDOT's Plan Room]. | ||
|- | |- | ||
|colspan="2"|A [ | |colspan="2"|A [https://www.modot.org/how-become-modot-vendor-purpose-obtaining-plans web address is available to obtain a vendor number for the sole purpose of accessing plans or receiving e-mail updates]. | ||
|- | |- | ||
|colspan="2"|'''Bid Guaranty.''' Contractors must submit a bid guaranty for 5% of the bid amount in the form of a cashier’s check, certified check or a paper or electronic bid bond. Bidders are also allowed to submit annual paper or electronic bid bonds. Electronic bid bonds are only allowed when submitting electronic bids through Bid Express. | |colspan="2"|'''Bid Guaranty.''' Contractors must submit a bid guaranty for 5% of the bid amount in the form of a cashier’s check, certified check or a paper or electronic bid bond. Bidders are also allowed to submit annual paper or electronic bid bonds. Electronic bid bonds are only allowed when submitting electronic bids through Bid Express. | ||
|- | |- | ||
|colspan="2"| | |colspan="2"|'''Submitting a Bid.''' <u>All bids shall be submitted electronically using the [http://www.bidx.com Bid Express website].</u> | ||
'''Submitting a Bid.''' <u>All bids shall be submitted electronically using the [http://www.bidx.com Bid Express website].</u> | |||
|- | |- | ||
|colspan="2"|A vendor must have an active Bid Express account in order to submit bids via the internet. Vendors must also download the current version of Expedite Bid software and the electronic bid submission (EBS) files from | |colspan="2"|A vendor must have an active Bid Express account in order to submit bids via the internet. Vendors must also download the current version of Expedite Bid software and the electronic bid submission (EBS) files from [http://www.Bidx.com www.Bidx.com]. Vendors must also obtain a digital ID from Bid Expess in order to electronically sign their bids. Obtaining the digital ID may take up to a week. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Bid Results.''' Apparent Bid Results can be found at [https://modotweb.modot.mo.gov/BidLettingPlansRoom/Letting MoDOT Plans Room] on the lettings tab shortly after the bids are opened. | ||
|- | |- | ||
|colspan=" | |colspan="2"|Final corrected Bid Results are posted on MoDOT’s website the day of the letting. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Award of Projects.''' A Bid Award Summary is posted on MoDOT’s website immediately after award by the Missouri Highways and Transportation Commission (MHTC). | ||
|- | |- | ||
|colspan=" | |colspan="2"|If awarded a MoDOT contract, a vendor must be in compliance with the established laws to conduct business in the state of Missouri. You will be notified by an Award/Notice to Proceed letter upon approval by the MHTC and the issuance of contract agreement documents. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Bid Tabulations.''' After award by the MHTC, the individual unit bid prices for each proposal are posted on MoDOT’s website and [http://www.bidx.com the Bid Express website]. Bid tabulations of rejected projects are not posted. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Prevailing Wage Rates.''' The Federal and State Wage Rates for each letting are posted on [https://www.modot.org/bid-opening-info MoDOT’s website (located under "Wage Rate Information")]. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Letting and Awards.''' A [https://www.modot.org/bid-opening-info letting and awards calendar (located under "Documents")] identifying the specific dates for the notice of advertisements, monthly bid openings and commission meetings is available. | ||
|- | |- | ||
|colspan=" | |colspan="2"|'''Additional Resources for Vendors.''' | ||
|- | |- | ||
|width=1| ||colspan="2"|• [https://revisor.mo.gov/main/OneSection.aspx?section=610 “Open Records Law” - RSMo. 610]. Requests for records will be provided in accordance with this statute and departmental procedure. | |width=1| ||colspan="2"|• [https://revisor.mo.gov/main/OneSection.aspx?section=610 “Open Records Law” - RSMo. 610]. Requests for records will be provided in accordance with this statute and departmental procedure. | ||
| Line 88: | Line 81: | ||
| ||colspan="2"|• InSure Vision, (818) 783-3460 - Electronic Bid Bonds | | ||colspan="2"|• InSure Vision, (818) 783-3460 - Electronic Bid Bonds | ||
|- | |- | ||
| ||colspan="2"|• [ | | ||colspan="2"|• [https://www.modot.org/welcome-business-development-and-compliance MoDOT Business Development and Compliance Office] (573) 526-2978 | ||
|- | |- | ||
| ||colspan="2"|• [ | | ||colspan="2"|• [https://www6.modot.mo.gov/MRCC/Home/PublicSearch MRCC DBE Directory] | ||
|- | |- | ||
| ||colspan="2"|• [ | | ||colspan="2"|• [https://www.modot.org/missouri-standard-specifications-highway-construction Missouri Standard Specification for Highway Construction] | ||
|- | |- | ||
| ||colspan="2"|• [ | | ||colspan="2"|• [https://oeo.mo.gov/ Office of Equal Opportunity (OEO)] located in Jefferson City, MO, promotes a diversified workforce within state government and assists women and minorities in developing opportunities to contract with the state. Their number is (573) 751-8130. | ||
|- | |- | ||
| ||colspan="2"|• [ | | ||colspan="2"|• [https://www.modot.org/bidding Other MoDOT Bidding and Contracting Opportunities] | ||
|- | |- | ||
|colspan="3"|'''For bid related questions contact:''' | |colspan="3"|'''For bid related questions contact:''' | ||
|- | |- | ||
| | | | || MoDOT Central Office, Design Division | ||
|- | |- | ||
| | | | || P.O. Box 270, Jefferson City, MO 65102 | ||
|- | |- | ||
| | | | || Phone: (573) 751-2876; Fax: (573) 522-2281 | ||
|- | |- | ||
|colspan="3"|Each project contains a contact number for project-specific questions. | |colspan="3"|Each project contains a contact number for project-specific questions. | ||
|} | |} | ||
[[Category:100_GENERAL]] | |||
Latest revision as of 06:58, 30 April 2025
One of the essential functions of the Highway and Transportation Commission and MoDOT is to provide a transportation network for the citizens of Missouri and those that travel through the state. One of the ways this is accomplished is by contracting with outside companies to provide improvements to the state's highway infrastructure.
In 1921 the authority to prepare plans and make estimates, let all contracts, provide uniform highway markings and purchase or lease land was prescribed by the governor through Centennial Road Law. At that time the system included approximately 6,000 miles of secondary roads and 1,500 miles of primary roads. Today MoDOT maintains more than 33,600 miles of roadway along with other modes of transportation. Contract bidding is essential in maintaining this vast system.
| Doing Business with MoDOT Bidding and Contract Services: | ||
| Bidding on Highway Construction Projects | ||
| The Design Division is responsible for advertising, letting and awarding MoDOT’s highway construction and maintenance projects. See MoDOT’s Bid Opening Information website. | ||
| Prequalification of Bidders. To bid as a prime contractor, vendors must either have a Prequalification Contractor Questionnaire (in order to bid on projects of any size) or a Contractor Questionnaire (in order to bid on only projects under $2,000,000) approved and on file with MoDOT, along with the required documentation 7 days prior to the bid opening. Both forms can be found online. | ||
| Subcontracting. Prime contractors use subcontractors for numerous elements of an individual contract. On each contract, a prime contractor may propose to MoDOT the subcontractor(s) needed for an individual contract. Although MoDOT has no contractual relationship with subcontractors, MoDOT maintains a review and approval process for proposed subcontractor utilization. This process is included in EPG 108 Prosecution and Progress. MoDOT also maintains a listing of sub-contractors that are approved for use on Commission contracts as a convenience to the contracting community. To be included on this listing, a contractor is required to submit information for review. | ||
| Advertisement of Bid Opening. MoDOT publishes a 3-month tentative letting schedule (located under "Documents") on a monthly basis. The official advertisement for the current month is published 5 weeks prior to the bid opening date. A proposal specific advertisement can also be found in local newspapers. Supplemental advertisements may be posted up to 3 weeks prior to the bid opening. In addition, MoDOT may hold a special bid opening as needed. Preliminary Quantities are posted on MoDOT’s website for each letting. | ||
| MoDOT also publishes advertisements for federally funded local projects that are administered by cities and counties. | Useful MoDOT Websites
Bidding and Contracting Opportunities Business Development and Compliance How to Become a MoDOT Subcontractor How to Become a MoDOT Vendor for the Purpose of Obtaining Plans Missouri Regional Certification Committee (MRCC) Disadvantaged Business Enterprise Other Useful Websites | |
| Bidding Documents. Plans, specifications and bidding documents can be accessed at MoDOT's Plan Room. | ||
| A web address is available to obtain a vendor number for the sole purpose of accessing plans or receiving e-mail updates. | ||
| Bid Guaranty. Contractors must submit a bid guaranty for 5% of the bid amount in the form of a cashier’s check, certified check or a paper or electronic bid bond. Bidders are also allowed to submit annual paper or electronic bid bonds. Electronic bid bonds are only allowed when submitting electronic bids through Bid Express. | ||
| Submitting a Bid. All bids shall be submitted electronically using the Bid Express website. | ||
| A vendor must have an active Bid Express account in order to submit bids via the internet. Vendors must also download the current version of Expedite Bid software and the electronic bid submission (EBS) files from www.Bidx.com. Vendors must also obtain a digital ID from Bid Expess in order to electronically sign their bids. Obtaining the digital ID may take up to a week. | ||
| Bid Results. Apparent Bid Results can be found at MoDOT Plans Room on the lettings tab shortly after the bids are opened. | ||
| Final corrected Bid Results are posted on MoDOT’s website the day of the letting. | ||
| Award of Projects. A Bid Award Summary is posted on MoDOT’s website immediately after award by the Missouri Highways and Transportation Commission (MHTC). | ||
| If awarded a MoDOT contract, a vendor must be in compliance with the established laws to conduct business in the state of Missouri. You will be notified by an Award/Notice to Proceed letter upon approval by the MHTC and the issuance of contract agreement documents. | ||
| Bid Tabulations. After award by the MHTC, the individual unit bid prices for each proposal are posted on MoDOT’s website and the Bid Express website. Bid tabulations of rejected projects are not posted. | ||
| Prevailing Wage Rates. The Federal and State Wage Rates for each letting are posted on MoDOT’s website (located under "Wage Rate Information"). | ||
| Letting and Awards. A letting and awards calendar (located under "Documents") identifying the specific dates for the notice of advertisements, monthly bid openings and commission meetings is available. | ||
| Additional Resources for Vendors. | ||
| • “Open Records Law” - RSMo. 610. Requests for records will be provided in accordance with this statute and departmental procedure. | ||
| • Surety 2000, (800) 660-3263 - Electronic Bid Bonds | ||
| • InSure Vision, (818) 783-3460 - Electronic Bid Bonds | ||
| • MoDOT Business Development and Compliance Office (573) 526-2978 | ||
| • MRCC DBE Directory | ||
| • Missouri Standard Specification for Highway Construction | ||
| • Office of Equal Opportunity (OEO) located in Jefferson City, MO, promotes a diversified workforce within state government and assists women and minorities in developing opportunities to contract with the state. Their number is (573) 751-8130. | ||
| • Other MoDOT Bidding and Contracting Opportunities | ||
| For bid related questions contact: | ||
| MoDOT Central Office, Design Division | ||
| P.O. Box 270, Jefferson City, MO 65102 | ||
| Phone: (573) 751-2876; Fax: (573) 522-2281 | ||
| Each project contains a contact number for project-specific questions. | ||
Articles in "102 Bidding Requirements and Conditions"
The following 2 pages are in this category, out of 2 total.