Difference between revisions of "Category talk:128 Conceptual Studies"

From Engineering_Policy_Guide
Jump to navigation Jump to search
(New page: I'd like to point out some minor revisions to the Conceptual, 3R and 4R Conceptual Study Report templates. First - To be consistant with the rest of the EPG and the 3R & 4R reports, re-la...)
 
(3R and 4R Conceptual Reports)
Line 5: Line 5:
 
Fourth- I'd suggest  "Resurfacing" be added to the beginning of the "Restoration, Rahabilitation or Reconstruction..." 4R title.
 
Fourth- I'd suggest  "Resurfacing" be added to the beginning of the "Restoration, Rahabilitation or Reconstruction..." 4R title.
 
Thanks!
 
Thanks!
 +
 +
== 3R and 4R Conceptual Reports ==
 +
 +
We will consider your comments and revise the forms as necessary.  Thanks for the input.

Revision as of 14:04, 29 September 2008

I'd like to point out some minor revisions to the Conceptual, 3R and 4R Conceptual Study Report templates. First - To be consistant with the rest of the EPG and the 3R & 4R reports, re-lable under "Design Traffic" Design Speed as Opertional (Posted ) Speed. Second - Both the 3R & 4R reports, under "Project Information", need to have the items labeled as A thru L rather than A thu G followed by E through I. Third - I'd suggest "Resurfacing, Restoration and Rehabilitation be added to the 3R title. Fourth- I'd suggest "Resurfacing" be added to the beginning of the "Restoration, Rahabilitation or Reconstruction..." 4R title. Thanks!

3R and 4R Conceptual Reports

We will consider your comments and revise the forms as necessary. Thanks for the input.