Difference between revisions of "106.14 Proprietary Items"
Jump to navigation
Jump to search
m (Per CM, for greater clarity,old EPG 106.14 (9228 hits - no appreciable history) was moved to EPG 106.11. New EPG 106.14 is aligned with Sec 106) |
m (updated link) |
||
Line 1: | Line 1: | ||
− | [http://www.modot. | + | [http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.14] describes actions to be taken when a [[131.2 Proprietary Items and Public Interest Findings|proprietary item]] becomes unavailable during the term of a contract. |
[[category: 106 Control of Material|106.14]] | [[category: 106 Control of Material|106.14]] |
Latest revision as of 11:51, 8 June 2016
Sec 106.14 describes actions to be taken when a proprietary item becomes unavailable during the term of a contract.