Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m
m (EPG 616.23, QRG, EPG FAST)
Line 39: Line 39:
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-October, the numbers of hits are:'''
 
|colspan="2"|'''Perhaps you've wondered how many hits the most popular EPG articles have.  As of mid-October, the numbers of hits are:'''
 
|-
 
|-
|'''20.''' [[136.12 Figures and Glossary|EPG 136.12]], 50024||'''10.''' [[:Category:903 Highway Signing|EPG 903]], 81153
+
|'''20.''' [[136.12 Figures and Glossary|EPG 136.12]], 50369||'''10.''' [[:Category:903 Highway Signing|EPG 903]], 81506
 
|-
 
|-
|'''19.''' [[:Category:1000 MATERIALS|EPG 1000]], 58196||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 96791
+
|'''19.''' [[:Category:1000 MATERIALS|EPG 1000]], 58279||'''9.''' [[:Category:616 Temporary Traffic Control|EPG 616]], 96909
 
|-
 
|-
|'''18.''' [[903.5 Regulatory Signs|EPG 903.5]], 63424||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 109369
+
|'''18.''' [[903.5 Regulatory Signs|EPG 903.5]], 63499||'''8.''' [[:Category:200 GEOMETRICS|EPG 200]], 109493
 
|-
 
|-
|'''17.''' [[751.13 Expansion Devices|EPG 751.13]], 63818||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 110928
+
|'''17.''' [[751.13 Expansion Devices|EPG 751.13]], 63870||'''7.''' [[616.23 Traffic Control for Field Operations|EPG 616.23]], 111220
 
|-
 
|-
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 67106 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 132748
+
|'''16.''' [[751.5 Standard Details|EPG 751.5]], 67243 ||'''6.''' [[:Category:600 INCIDENTAL CONSTRUCTION|EPG 600]], 132897
 
|-
 
|-
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 68645 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 158577
+
|'''15.''' [[903.6 Warning Signs|EPG 903.6]], 68726 ||'''5.''' [[:Category:100 GENERAL|EPG 100]], 158739
 
|-
 
|-
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 70517||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 165172
+
|'''14.''' [[620.2 Pavement and Curb Markings (MUTCD Chapter 3B)|EPG 620.2]], 70815||'''4.''' [[:Category:700 STRUCTURES AND HYDRAULICS|EPG 700]], 165364
 
|-
 
|-
|'''13.''' [[:Category:101 Standard Forms|EPG 101]], 74811 ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 173412
+
|'''13.''' [[:Category:101 Standard Forms|EPG 101]], 74918 ||'''3.''' [[:Category:751 LRFD Bridge Design Guidelines|EPG 751]], 173771
 
|-
 
|-
|'''12.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 75362   ||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 183922
+
|'''12.''' [[:Category:400 FLEXIBLE PAVEMENT|EPG 400]], 75448   ||'''2.''' [[:Category:900 TRAFFIC CONTROL|EPG 900]], 184254
 
|-
 
|-
|'''11.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 76161 ||'''1.''' EPG Main Page, 847484
+
|'''11.''' [[751.40 Widening and Repair (Non-LRFD)|EPG 751.40]], 76497 ||'''1.''' EPG Main Page, 850653
 
|}
 
|}
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 +
'''[[media:616.8.10a 2012.pdf|TA-10a, Flagger Assistance Devices (AFAD) with Red and Amber Signal System]]'''
 +
 +
10/18/12: TA-10a was updated to correctly show that the maximum distance between AFADs is 1/2 mile.
 +
 +
'''[[media:Job Order Contracts Oct 2012.docx|Job Order Contracts]]'''
 +
 +
10/18/12: This QRG has had a major revision.
 +
 +
'''Acceptance Sampling and Testing Procedures'''
 +
 +
10/18/12: The Federal Aid Sampling and Testing (FAST) table was split.  The "Stabilized Permeable Base" information was moved to [http://epg.modot.org/index.php?title=Category:302_Stabilized_Permeable_Base#302.2.1.1_Production_Testing EPG 302.2.1.1] and the "Modified Subgrade" information was moved to [http://epg.modot.org/index.php?title=Category:205_Modified_Subgrade#205.2.2.3.7_Production_Testing EPG 205.2.2.3.7]. This revision is a result of switching from project-based to system-based Independent Assurance and of going to a QC/QA sampling and testing approach on MoDOT roads. FAST guidance in [http://epg.modot.org/index.php?title=Category:123_Federal-Aid_Highway_Program#123.3.3_Local_Public_Agency_.28LPA.29_Federal-Aid_Acceptance_Sampling_and_Testing EPG 123.3.3] was also revised.
 +
 
'''[http://epg.modot.mo.gov/index.php?title=Category:134_Engineering_Professional_Services#134.3.4_Audit_Pre-Negotiation_Review EPG 134.3.4 Audit Pre-Negotiation Review]'''
 
'''[http://epg.modot.mo.gov/index.php?title=Category:134_Engineering_Professional_Services#134.3.4_Audit_Pre-Negotiation_Review EPG 134.3.4 Audit Pre-Negotiation Review]'''
  
Line 148: Line 160:
  
 
9/12/12: The [[media:409 Contract Seal Coat Guidelines Sept 2012.doc|Contract Seal Coat Guidelines]], [[media:409 JSP Sept 2012.doc|Job Special Provisions]] and the [[media:409 CSC Templates Sept 2012.pdf|Contract Seal Coat Plan Templates]] have been updated.
 
9/12/12: The [[media:409 Contract Seal Coat Guidelines Sept 2012.doc|Contract Seal Coat Guidelines]], [[media:409 JSP Sept 2012.doc|Job Special Provisions]] and the [[media:409 CSC Templates Sept 2012.pdf|Contract Seal Coat Plan Templates]] have been updated.
 
'''[http://ghepg01/forms/CO/Bridge%20Clearance%20Report%20(C-239A).dotx Bridge Clearance Report Form (C-239A)]'''
 
 
9/10/12: This form has been updated in both [http://epg.modot.org/index.php?title=Category:101_Standard_Forms#Construction_and_Materials EPG 101 Standard Forms] and [[:Category:760 General Construction Inspection for Structures|EPG 760 General Construction Inspection for Structures]].
 
 
'''Erosion & Sediment Control Plans'''
 
 
9/7/12: [[127.25 Maintenance Environmental Policies#127.25.4.1 Storm Water Regulations|EPG 127.25.4.1 Storm Water Regulations]] has been revised to comply with the land disturbance permit.  A note must be added to erosion and sediment control plans identifying all the primary receiving waters within a project's limits and/or within one mile of the jobsite.
 
 
'''Major Highways Map'''
 
 
9/7/12: Transportation Planning has updated this important document in [[822.6 Definitions#Major Roads|EPG 822.6 Definitions for Roadside Vegetation Management]] and numerous other articles.  This map specifies roadways for many critical procedures.
 

Revision as of 11:57, 18 October 2012

EPG.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
R.L. Persons Construction pours the deck on an I-55 outer road's bridge on the northern side of Scott City. The project is expected to be complete before 2012.
Construction continues on the new Amelia Earhart Memorial Bridge on U.S. 59 where it crosses the Missouri River connecting Winthrop, MO with Atchison, KS.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

The Tour de Ted cycle their way from the Colorado Springs, CO area to St. Louis. Edward D. "Ted" Jones and his wife, Pat, have donated over $2 million to establish the Katy Trail and also contributed money to construct this pedestrian bridge over the Missouri River at Jefferson City. This bike tour is a fundraiser to fight cancer.
Firetrucks hoist the American flag to honor the life of Clifton Scott during funeral services, Sept. 29. Hundreds of emergency responders joined in the Kansas City procession that took Scott to his final resting place.
Perhaps you've wondered how many hits the most popular EPG articles have. As of mid-October, the numbers of hits are:
20. EPG 136.12, 50369 10. EPG 903, 81506
19. EPG 1000, 58279 9. EPG 616, 96909
18. EPG 903.5, 63499 8. EPG 200, 109493
17. EPG 751.13, 63870 7. EPG 616.23, 111220
16. EPG 751.5, 67243 6. EPG 600, 132897
15. EPG 903.6, 68726 5. EPG 100, 158739
14. EPG 620.2, 70815 4. EPG 700, 165364
13. EPG 101, 74918 3. EPG 751, 173771
12. EPG 400, 75448 2. EPG 900, 184254
11. EPG 751.40, 76497 1. EPG Main Page, 850653

TA-10a, Flagger Assistance Devices (AFAD) with Red and Amber Signal System

10/18/12: TA-10a was updated to correctly show that the maximum distance between AFADs is 1/2 mile.

Job Order Contracts

10/18/12: This QRG has had a major revision.

Acceptance Sampling and Testing Procedures

10/18/12: The Federal Aid Sampling and Testing (FAST) table was split. The "Stabilized Permeable Base" information was moved to EPG 302.2.1.1 and the "Modified Subgrade" information was moved to EPG 205.2.2.3.7. This revision is a result of switching from project-based to system-based Independent Assurance and of going to a QC/QA sampling and testing approach on MoDOT roads. FAST guidance in EPG 123.3.3 was also revised.

EPG 134.3.4 Audit Pre-Negotiation Review

10/16/12: A helpful clarification was added to copy Pre-Audit information to Design and/or Bridge Liaisons.

Moving Superstructure Slab Bars

10/15/12: In EPG 751.10.1.7 and EPG 751.10.2.2 added details and in EPG 751.50 E3 added notes indicating slab bars that may be moved for construction purposes and showing bar clearance to top mat of slab steel info not given before. Revisions will make tying barrier bars simpler.

Consultant Performance Appraisals

10/12/12: In EPG 134.5.4 Consultant Performance Appraisals and EPG 136.4.3.3 Consultant Performance Appraisals, guidance was clarified for both MoDOT and LPA personnel on how to document consultant evaluations.

EPG 1039.2.4.2 Sampling of Epoxy Polymer Concrete

10/12/12: Guidance for the sampling frequency has been revised to bring it in line with current practices.

Engineering Professional Services - Rating/Scoring the Consultants

10/11/12: In EPG 134.2.2.5 Selection of Consultant, Rating/Scoring the Consultants, the guidance about listing the consultants was clarified.

Project-Specific Information for the SWPPP

10/11/12: Project offices will be responsible for completing Form 806.8.2, Project-Specific SWPPP Information for all jobs with one or more acres of total land disturbance.

Steel Plates in the Roadway

10/10/12: Guidance on the use and installation of steel plates on high-speed roadways is now available at EPG 616.6.46, EPG 616.23.3 Typical Applications and EPG 770.7.2 Concrete Deck Maintenance.

Turned-Down Guardrail Ends

10/10/12: Turned-down guardrail ends have been determined to be rarely appropriate and the practice is now prohibited. Guidance has been removed from EPG 616.1.3.6 Bridge Ends.

Anchor Bolt Wells

10/10/12: Guidance in EPG 712.1.3 Bearing (During Construction), EPG 751.11.3.5 Anchor Bolts and EPG 751.50 G1.15 notes and note H3.1 now allow the use of permanently placed galvanized corrugated steel pipe as forms for anchor bolt wells. If this method not used and drilling is required, the reinforcement is not to be cut.

"How to Develop a Winning Project Application"

10/5/12: This useful PowerPoint tutorial for LPAs is now available in EPG 136.3 Federal Aid Basics.

EPG 131.2 Proprietary Items and Public Interest Findings

10/4/12: The process of submitting requests for approval of proprietary items has been streamlined. Submit requests to codeproprietary@modot.mo.gov for consideration. While this applies to both STIP and LPA projects, LPA projects must be submitted through the appropriate MoDOT staff (not directly from the LPA). Upon approval, an e-mail with a link to the approved request's digital image will be issued.

Standard Detailing Notes for Overcoating Existing Steel

10/4/12: Two notes pertaining to limits of paint overlap requirements were added.

EPG 907.6 Fatal Crash Reviews

10/3/12: This new article provides guidance for the reviews that districts are required to perform on every fatal crash that has occurred on our state system.

Edgeline Pavement Markings

10/1/12: The guidance in EPG 620.2.6 was updated to clarify where to begin and end edgeline stripes at at-grade crossings. Fig. 620.2.7 was also updated.

Environmental Requirements for Culverts

9/28/12: New and replacement culverts with inside widths or diameters greater than 4 ft. must have the culvert's invert embedded at least 1 ft. below the natural stream bottom and convey the geomorphic bankfull discharge with an average velocity within the culvert similar to upstream and downstream velocities. EPG 750.7.3.3 Environmental Requirements for Culverts is the primary source for this new requirement's details, but EPG 127.4.1.1, EPG 127.4.4 Maintenance Activities and EPG 750.2 Culverts were also among the articles affected. This revision is based on a new USCOE stricture.

Compensation for Changes in Access to Noncontiguous Properties

9/27/12: Guidance in EPG 236.5.28.3 Compensation for Changes in Access was updated to show that now MoDOT will now always perform an appraisal when there is a shift in access to a noncontiguous property.

Pavement Marking

9/26/12: Both the Pavement Marking Guidelines table and EPG 620.1.4 Materials were revised because several non-standard JSPs (including epoxy and high build pavement markings) were combined into JSPs.

LPA Policy Changes

9/25/12: Information formerly available at EPG 136.12.3.5 is now presented at EPG 136.13 LPA Policy Changes.

NU Girder Design

9/18/12: In EPG 751.22.2.3, guidance was clarified that for all NU girders the 3/8" diameter strands used for reinforcement support and the top, WWR are required and shall be used for A1 reinforcement design. In EPG 751.50, Note H2c2.10 was revised to define the required bond breaker at the edges of NU top flanges to be two layers of 30-lb roofing felt girders.

Safety Edge Guidance Clarification

9/17/12: On minor routes, a Safety EdgeSM will be constructed at the edge of each shoulder that is 4 ft. wide or narrower.

Safety Videos

9/17/12: Mowing Safety and Asphalt Operations are available for viewing at EPG 132 Safety and other articles. These videos were produced by MoDOT supervisors for MoDOT supervisors. The Mowing Safety video should assist the supervisors and crew leaders in their Morning Muster Safety talks.

Seal Coat Guidance

9/12/12: The Contract Seal Coat Guidelines, Job Special Provisions and the Contract Seal Coat Plan Templates have been updated.