Talk:102.2 Contractor Performance, Referrals, and Endorsements: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
Smithk (talk | contribs)
mNo edit summary
 
(No difference)

Latest revision as of 12:19, 2 November 2026

Please replace the Contractor Performance Rating System form that is from 2010 with a 2014 vesion. We usually give a copy of this to contractors at the Pre-Construction meeting so they know what and how we are going to rate them. Thanks! Robert St.Gemme SCI Festus Project Office

Keith L. Smith: Thanks for your attention to this! After CM Division provided the file, EPG 102.2 was updated with this form.