Difference between revisions of "748.6 High Water Surface Elevation"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per Bridge, updated links & verbiage (Design High Water changed to Design Flood Elevation or Normal High Water and High Water changed to Base Flood Elevation). Figure updated w/ new verbiage)
m
Line 8: Line 8:
  
 
The base flood elevation is defined the same as the design flood elevation except that the discharge is based on Base (100-year) Flood frequency.  
 
The base flood elevation is defined the same as the design flood elevation except that the discharge is based on Base (100-year) Flood frequency.  
 
  
 
==748.6.3 Freeboard High Water==
 
==748.6.3 Freeboard High Water==

Revision as of 10:30, 5 December 2014

748.6.1 Design Flood Elevation

The design flood elevation is the high water surface elevation at the location of the backwater with MoDOT bridges, culverts and roadway fills in place. The frequency (for example, 25-year, 50-year) and discharge of the design flood is based on the roadway design criteria.

748.6.1.jpg

748.6.2 Base Flood Elevation

The base flood elevation is defined the same as the design flood elevation except that the discharge is based on Base (100-year) Flood frequency.

748.6.3 Freeboard High Water

The high water surface elevation for freeboard is the design water surface elevation for the freeboard design frequency discharge at the lower limit of the bridge superstructure (with structure in place). Consideration should be given to using the approach high water surface elevation, which is the water surface elevation just upstream of the bridge, as the freeboard high water elevation when the minimum freeboard is at the upstream edge/girder of the bridge. The freeboard high water surface elevation should not be lower than the normal water surface elevation.

The location of the freeboard high water surface elevation should be noted in the hydraulics report.

748.6.4 Accuracy

See EPG 751.5.2.1, Hydraulic Data.