User:Hoskir/Revision Request 4276: Difference between revisions

From Engineering Policy Guide
Jump to navigation Jump to search
No edit summary
No edit summary
Line 1: Line 1:
<hr style="border:none; height:2px; background-color:red;" />'''copy 133.3.1 and 133.3.2'''<hr style="border:none; height:2px; background-color:red;" />
<br>
==133.3.1 Personnel from other Functional Units==
==133.3.1 Personnel from other Functional Units==
{| style="margin-left:15px; margin-top: 5px; border:1px solid #a9a9a9; background:#f5f5f5" width="450px" align="right"  
{| style="margin-left:15px; margin-top: 5px; border:1px solid #a9a9a9; background:#f5f5f5" width="450px" align="right"  

Revision as of 11:15, 30 September 2026


copy 133.3.1 and 133.3.2




133.3.1 Personnel from other Functional Units

Related Information
● Incident Response Plan and Emergency Response Management
● Snow Fight Training Expectations

Districts may use any safety sensitive personnel designated by the district engineer in emergency situations and as indicated by the particular emergency. A commercial drivers license (CDL) is required for snow and ice control work.

Reason for policy: To ensure MoDOT has sufficient trained personnel to work on snow and ice removal.
Effective Date: 6/1/99
Revision Dates: 6/17/03

133.3.2 Snow and Ice Operations Training

Supervisors must ensure employees have received all required training before snow operations.

To be considered fully trained and allowed to operate a snowplow, employees must complete all identified portions of training as listed in the Snow Fight Training Expectations.

Effective Date: 6/1/99
Revision Dates: 8/25/26