Difference between revisions of "616.17 Pavement Edge Treatment"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (previously 616.9)
 
m (article construction)
Line 1: Line 1:
 
 
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
 
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
 
|-
 
|-
 
|'''Additional Information'''
 
|'''Additional Information'''
 
|-
 
|-
|[[Additional Information 616.9 Pavement Edge Treatment|Maintenance]]
+
|[[:Category:Shoulder Maintenance#Shoulder Edge Ruts and Settlement Maintenance|Shoulder Edge Ruts and Settlement Maintenance]]
 
|}
 
|}
 
Criteria for pavement edge treatment are shown on [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf Standard Plan 619.10] and are described in [http://www.modot.state.mo.us/business/standards_and_specs/Sec0619.pdf Sec 619] of the Standard Specifications.  Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done.  Edge treatment is listed on the "2B" sheets by location.  Coordination with Construction and Materials is recommended.
 
Criteria for pavement edge treatment are shown on [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf Standard Plan 619.10] and are described in [http://www.modot.state.mo.us/business/standards_and_specs/Sec0619.pdf Sec 619] of the Standard Specifications.  Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done.  Edge treatment is listed on the "2B" sheets by location.  Coordination with Construction and Materials is recommended.

Revision as of 06:37, 9 July 2008

Additional Information
Shoulder Edge Ruts and Settlement Maintenance

Criteria for pavement edge treatment are shown on Standard Plan 619.10 and are described in Sec 619 of the Standard Specifications. Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done. Edge treatment is listed on the "2B" sheets by location. Coordination with Construction and Materials is recommended.