Difference between revisions of "Category:707 Conduit System on Structure"
m (Article construction - Added information from former maintenance manual.) |
|||
Line 2: | Line 2: | ||
For those used by the state, the material will be placed in accordance with [http://modot.mo.gov/business/standards_and_specs/Sec1060.pdf Sec 1060] and [http://modot.mo.gov/business/standards_and_specs/Sec1062.pdf Sec 1062]. Inspection guidance is found in [[:Category:1060 Electrical Conduit|Electrical Conduit]] and [[:Category:1062 Pull and Junction Boxes|Pull and Junction Boxes]]. Conduit systems for use by others should be installed in accordance with the applicable permit or agreement and appropriate cost records should be maintained and submitted in accordance with the agreements. | For those used by the state, the material will be placed in accordance with [http://modot.mo.gov/business/standards_and_specs/Sec1060.pdf Sec 1060] and [http://modot.mo.gov/business/standards_and_specs/Sec1062.pdf Sec 1062]. Inspection guidance is found in [[:Category:1060 Electrical Conduit|Electrical Conduit]] and [[:Category:1062 Pull and Junction Boxes|Pull and Junction Boxes]]. Conduit systems for use by others should be installed in accordance with the applicable permit or agreement and appropriate cost records should be maintained and submitted in accordance with the agreements. | ||
+ | |||
+ | The district shall report any lack of maintenance of these utilities to the [http://wwwi/design/default.htm Design Division] Utility Liaison Engineer or other individual designated to ensure proper maintenance of the utilities. |
Revision as of 08:44, 29 September 2008
There are a variety of conduit systems used on structures. They may be cast into the concrete or suspended from the structure. Some conduits are used by the state for lighting or signals. Others are for use by political subdivisions or utility companies.
For those used by the state, the material will be placed in accordance with Sec 1060 and Sec 1062. Inspection guidance is found in Electrical Conduit and Pull and Junction Boxes. Conduit systems for use by others should be installed in accordance with the applicable permit or agreement and appropriate cost records should be maintained and submitted in accordance with the agreements.
The district shall report any lack of maintenance of these utilities to the Design Division Utility Liaison Engineer or other individual designated to ensure proper maintenance of the utilities.