102.1 Construction Inspection Guidance for Sec 102: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
m Per CM, info from EPG 102.2 moved to this article. |
||
Line 1: | Line 1: | ||
Bidding requirements and conditions for contractors are addressed in [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec 102] of the Missouri Standard Specifications for Highway Construction. | Bidding requirements and conditions for contractors are addressed in [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec 102] of the Missouri Standard Specifications for Highway Construction. | ||
The Commission accepts bids for projects under conditions established by [http://www.modot.mo.gov/business/standards_and_specs/Sec0102.pdf Sec. 102] of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures. | |||
[[Category:102 Bidding Requirements and Conditions]] | [[Category:102 Bidding Requirements and Conditions]] |
Revision as of 08:03, 28 June 2010
Bidding requirements and conditions for contractors are addressed in Sec 102 of the Missouri Standard Specifications for Highway Construction.
The Commission accepts bids for projects under conditions established by Sec. 102 of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.