Difference between revisions of "616.17 Pavement Edge Treatment"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (article construction)
m (Per Traffic, Pavement Edge Treatment info was moved to EPG 619 to coordinate with pay items. No change was made to the guidance.)
 
Line 1: Line 1:
[[image:616.17 pavement edge.jpg|left|250px]]
+
{|style="padding: 0.3em; margin-left:15px; border:2px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="240px" align="center"  
{|style="padding: 0.3em; margin-left:15px; border:1px solid #a9a9a9; text-align:center; font-size: 95%; background:#f5f5f5" width="160px" align="right"  
 
 
|-
 
|-
|'''Additional Information'''
+
|'''This article has moved'''
 
|-
 
|-
|[[:Category:Shoulder Maintenance#Shoulder Edge Ruts and Settlement Maintenance|Shoulder Edge Ruts and Settlement Maintenance]]
+
|EPG 616.17 Pavement Edge Treatment has moved to [[:Category:619 Pavement Edge Treatment|EPG 619 Pavement Edge Treatment]].  The content was not changed, only article's location.
 
|}
 
|}
Criteria for pavement edge treatment are shown on [http://www.modot.mo.gov/business/standards_and_specs/documents/61910.pdf Standard Plan 619.10] and are described in [http://www.modot.state.mo.us/business/standards_and_specs/Sec0619.pdf Sec 619] of the Standard Specifications.  Quantities of pavement edge treatment are estimated at 100% of the potential edge treatment for the project based on the type of work being done.  Edge treatment is listed on the "2B" sheets by location.  Coordination with Construction and Materials is recommended.
 
 
  
  

Latest revision as of 08:14, 17 June 2011

This article has moved
EPG 616.17 Pavement Edge Treatment has moved to EPG 619 Pavement Edge Treatment. The content was not changed, only article's location.