Difference between revisions of "Main Page"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (EPG 236.18)
Line 1: Line 1:
[[Image:EPG.jpg|1080px|center]]
+
[[Image:Engineering Policy Guide.jpg|center]]
  
  
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 110%; background:#E3D6AA" width="1054px" align="center"  
+
{|style="padding: 0.3em; margin-left:0px; border:3px solid #a9a9a9; text-align:center; font-size: 110%; background:#cccc89" width="814px" align="center"  
 
|-
 
|-
 
|rowspan="3" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' '''<BIG><font color = "white"><i>[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white">
 
|rowspan="3" align="right" |'''<font color = "white"><font size = 4.7><i>HELPFUL EPG VIDEOS: </i></font color="white"></font size = 5>|| ||align="left"|''' '''<BIG><font color = "white"><i>[[media:Logging into the EPG.wmv|•Logging into the EPG]]</i></font color="white">
Line 17: Line 17:
 
|-
 
|-
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
 
|valign="top" style="border: 1px solid #A9A9A9; color: #000; background-color: #F8F8FF"|
[[image:Main Page July 18, 2011.jpg|380px|center|thumb|<center>'''Jeff Lewis, Maintenance Supervisor in the NW District, works in the heat installing [http://www.youtube.com/user/modotvideo#p/u/4/gHjlKEqJQ8M Big Bags] (large sand bags with 15' long x 3' x 3' compartments) along Rte. 65 in Carroll County to hold back Missouri River flooding.'''</center>]]
+
[[image:903.12.2.jpg|300px|center|thumb|<center>'''Joplin faced a EF5 tornado on May 22nd. If you would like to make a donation to District 7 employees, please send checks to:
 +
 
 +
'''D7 Highway Credit Union, 3929 E. 7th Street, Suite A, Joplin, MO  64801.
 +
 
 +
'''Make checks payable to the D7 Highway Credit Union and reference D7 Employee Fund in the memo.'''</center>]]
  
 
{| style="margin: 1em auto 1em auto"
 
{| style="margin: 1em auto 1em auto"
 
|-
 
|-
|[[image:Main Page 2 Aug 4, 2011.jpg|380px|center|thumb|<center>'''KC District is testing a debris removal device so new that it is one of four in existence and the only one used in the United States. Custom-built to fit MoDOT's larger truck, it scoops up trash while the vehicle travels with traffic at a comfortable 45-50 mph.'''</center>]]
+
|[[image:Main Page Aug 30, 2011.jpg|420px|center]]||[[image:Main Page a Aug 30, 2011.jpg|150px||center]]
 +
|-
 +
|colspan="2"|'''Work on the Ameilia Earhart Memorial Bridge continues even while the Missouri River remains well above flood stage. In the photo on the left, Atchison, KS is in the background.
 
|}
 
|}
  
Line 29: Line 35:
  
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
 
MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG.  Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read.  A small [[:Help:Contents|'''HELP ARTICLE''']] is included to assist with helpful hints on how to use the EPG as well as other points of interest.  
[[image:Main Page 3 Jul 27, 2011.jpg|380px|center|thumb|<center>'''Alton Thomas, St. Louis District Maintenance Crew Leader, changes the I-270 variable speed limit signs to be advisory speeds.'''</center>]]
+
[[image:Main Page 3 June 8, 2011.jpg|300px|center|thumb|<center>'''Lebanon Intermediate Maintenance Worker Brent Jones is part of a crew repairing roadway edges on I-44 east of Lebanon.'''</center>]]
  
[[image:903.12.2.jpg|380px|center|thumb|<center>'''Joplin faced a EF5 tornado on May 22nd. If you would like to make a donation to District 7 employees, please send checks to: D7 Highway Credit Union, 3929 E. 7th Street, Suite A, Joplin, MO 64801. Make checks payable to the D7 Highway Credit Union and reference D7 Employee Fund in the memo.'''</center>]]
+
[[image:Main Page 4 June 2011.jpg|300px|center|thumb|<center>'''Rich Bearden, D5 Electrician, rewires a traffic head for a flashing yellow arrow on Route F in Fulton.'''</center>]]
 
{| style="margin: 1em auto 1em auto" style="border: 2px solid #696969; color: #000; background-color: #A9A9A9"
 
{| style="margin: 1em auto 1em auto" style="border: 2px solid #696969; color: #000; background-color: #A9A9A9"
 
|-
 
|-
Line 40: Line 46:
  
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
 
|valign="top" cellspacing="0" cellpadding="5" style="border: 1px solid #FFA500; background:#ffdead"|
'''[[236.18 Local Public Agency Land Acquisition|EPG 236.18 Local Public Agency Land Acquisition]]'''
+
'''Junkyard Forms'''
  
8/30/11: Right of Way has generally clarified and updated this article's guidance and its forms.
+
6/17/11: [[236.17 Junkyards|EPG 236.17 Junkyards]] has been updated with several renamed and revised forms.
  
'''[[:Category:409 Seal Coat#Seal coats/chip seals|Contract Seal Coat]]'''
+
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
  
8/29/11: Links to Contract Seal Coat guidelines, JSP and templates have been added.
+
6/17/11: Many of the Right of Way forms have been updated and several new ones have been added.
  
'''[[:Category:172 Maintenance Facility Performance Expectations Environmental Compliance#172.12 SPCC and Portable Tank Storage|EPG 172.12 SPCC and Portable Tank Storage]] and [[127.25 Maintenance Environmental Policies#127.25.7.2 When a Product Becomes a Waste|EPG 127.25.7.2 When a Product Becomes a Waste]]'''
+
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Courses]]'''
  
8/17/11:  New guidance is available for Spill Prevention Control and Countermeasure Plan (SPCC), portable tank storage and hazardous waste.
+
6/7/11:  Most of the sheets in the Traffic Control CLC Templates were updated to be in line with current guidance. CLC Guidelines and JSP were also updated.
  
'''[[136.6 Consultant Contracts|EPG 136.6 Consultant Contracts]]'''
+
'''[[:Category:619 Pavement Edge Treatment|Pavement Edge Treatment]]'''
  
8/17/11: Fig. 136.6.1, Fig. 136.6.2 and Fig. 136.6.7 were updated and the new Engineering Services Sample Invoice spreadsheet was added.
+
6/17/11: Pavement Edge Treatment info was moved from EPG 616.17 to this new article to coordinate with pay items.  
  
'''[[127.28 Linking Planning and the National Environmental Policy Act (NEPA)|EPG 127.28 Linking Planning and the NEPA]]'''
+
'''System I Protective Coating'''
  
8/11/11:  This new article explains how MoDOT and the MPOs link planning and NEPA to fulfill the planning requirements for SAFETEA-LU.
+
6/13/11:  Guidance has been added to [[751.14 Steel Superstructure#751.14.5.8 Protective Coating Requirements|EPG 751.14.5.8]] and [[751.50 Standard Detailing Notes#A4. Protective Coatings|EPG 751.50]] to accommodate this new system.
  
'''Design's Submittal of the PS&E'''
+
'''EPG 751 Revisions'''
  
8/11/11: Guidance for how Design submits the PS&E using the new BTP Plus software has been updated, primarily in [[237.9 Submission of Plans and Supporting Documents#237.9.6.2 PS&E Submittal Package|EPG 237.9.6.2]], [[237.9 Submission of Plans and Supporting Documents#237.9.6.3.3 Specifications and Estimate Folder|EPG 237.9.6.3.3]] and [[237.9 Submission of Plans and Supporting Documents#237.9.6.4 Electronic JSP Review and Submittal Process, Roadway|EPG 237.9.6.4]].
+
6/13/11: The limits were corrected for "No Wearing Surface" cantilevers in [[751.10 General Superstructure#No Wearing Surface:|EPG 751.10.3.2]] (to less than 3'-8"); in [[751.22 P/S Concrete I Girders#PART SECTION SHOWING|EPG 751.22.3.13]] the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure; in [[751.37 Drilled Shafts#751.37.6.1 Reinforcement Design|EPG 751.6.1]] guidance for minimum spacing was added; a suggested range in [[751.37 Drilled Shafts#751.37.6.2 Longitudinal Reinforcement|EPG 751.37.6.2]] was removed;  and in [[751.37 Drilled Shafts#751.37.6.7 Shear Resistance|EPG 751.37.6.7]] the V<sub>s</sub> equation was corrected.
  
'''[[751.14 Steel Superstructure#751.14.3.4 Wide Flange Splice Tables|EPG 751.14.3.4 Wide Flange Splice Tables]]'''
+
'''[[136.10 Construction Authorization and Letting#136.10.14 Request for Concurrence|EPG 136.10.14 Request for Concurrence]]
 
7/22/11: The total number of bolts have been updated in the 27", 30", 33", 36" and 40" Wide Flange Splice tables.
 
  
'''Contract and Line Item Adjustments QRGs'''
+
6/10/11: Expanded guidance has been provided for an LPA's request for concurrence.
  
7/8/11: Two new Quick Reference Guides, [[:Category:109 Measurement and Payment#109.14 Price Adjustment for Fuel (for Sec 109.14)|Contract Adjustments and Line Item Adjustments]], to assist in the SM payment estimate process is available. They are also listed with the other QRGs in [[:Category:101 Standard Forms#Quick Reference Guides (QRGs)|EPG 101 Standard Forms]].
+
'''[[907.3 Travel Safe Zones#Recommendations|EPG 907.3 Travel Safe Zones]]
  
'''Bidding on Highway Construction Projects'''
+
6/7/11: Traffic Safety Quality Circle recommends a minimum length of 1 mile for the Travel Safe Zones.
  
7/7/11: General guidelines for bidding on construction projects, as well as many useful links, are now included in [[:Category:102 Bidding Requirements and Conditions#Doing Business with MoDOT Bidding|EPG 102 Bidding Requirements and Conditions]].
+
'''[[:Category:110 State and Federal Wage Rates and Other Requirements#Resource Manual for Equal Opportunity Contract Compliance|Resource Manual for Equal Opportunity Contract Compliance]]'''
  
'''[[236.6 Appraisal and Appraisal Review#Highest and Best Use Analysis After Acquisition|Highest and Best Use Analysis After Acquisition]]'''
+
6/1/11: External Civil Rights has updated this resource containing detailed information concerning E.E.O. matters.
  
7/6/11: Guidance has been expanded about elements to be considered by the appraiser when determining the highest and best use of property.
+
'''[[141.4 Transportation Improvement Program Amendments|EPG 141.4 Transportation Improvement Program Amendments]]'''
  
'''Sight Distance for Entrances'''
+
5/12/11: Transportation Planning has provided new guidance for TIP amendments.
  
6/23/11: [[941.19 Sight Distance for Entrances|EPG 941.19 Sight Distance for Entrances]] has been re-written to present a single set of intersection sight distance values that both apply to  designed plans and are permitted in the field.
+
'''[[:Category:235 Preliminary Plans#235.2.3 Project Agreements|EPG 235.2.3 Project Agreements]]'''
  
'''[[616.30 Work Zone Capacity, Queue and Travel Delay|EPG 616.30 Work Zone Capacity, Queue and Travel Delay]]'''
+
5/5/11:  The number of copies of the project agreement has been reduced to four. Additional guidance has also been provided about the agreement's distribution.
  
6/23/11: Traffic has expanded and moved to this new article info pertaining to work zone software and strategies to predict and alleviate queues and delay.
+
'''Engineering Professional Services'''
  
'''[[616.13 Crossovers, Temporary Connections and Detours|EPG 616.13 Crossovers, Temporary Connections and Detours]]'''
+
5/4/11:  Several forms were updated in [[:Category:134 Engineering Professional Services#134.3 Engineering Professional Services Guidelines|EPG 134.3 Engineering Professional Services Guidelines]].
  
6/22/11:  Designers are given the option to eliminate detours of closed routes having less than 400 AADT.  New guidance is also provide for using public info and advance turn signs to ameliorate the impact of closing the road in [[616.2 Work Zone Signing and Applications#616.2.5 Detour and Alternate Route Signing|EPG 616.2.5 Detour and Alternate Route Signing]].
+
'''[[821.19 Problem Weeds#Table 821.19 Recommended Products and Rates|EPG 821.19 Problem Weeds]]'''
  
'''[[616.2 Work Zone Signing and Applications#616.2.9 Flags and Advance Warning Rail System|EPG 616.2.9 Flags and Advance Warning Rail System]]'''
+
5/3/11: The recommended products and rates for some problem weeds have been updated.
  
6/22/11: Flags are required on all active signs in the first advance warning areas for daytime operations only. Nighttime use of flags is not prohibited.
+
'''[[751.8 LRFD Concrete Box Culverts|EPG 751.8 LRFD Concrete Box Culverts]]'''
  
'''[[616.23 Traffic Control for Field Operations#Direction indicator barricades|Direction Indicator Barricades]] (DIBs) Guidance'''
+
5/3/11:  FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs.  This new article replaces EPG 751.8 LFD Culverts, that presented ''LFD Bridge Design Manual'' info.
  
6/22/11:  DIBs should be used for long-term and may be used in short-term stationary projects.
+
'''[[751.39 Seal Course|EPG 751.39 Seal Course]]'''
  
'''[[233.3 Roundabouts|Review of Roundabout Designs]]'''
+
4/29/11: Bridge has updated the design method.  
  
6/22/11:  Traffic and Design divisions will now review preliminary layouts of all roundabouts.
+
'''[http://epg.modot.org/index.php?title=751.10_General_Superstructure#751.10.15_Deck_Concrete_Finishing EPG 751.10.15 Deck Concrete Finishing]'''
  
'''[[:Category:1019 Cement#1019.5.4 Cement Processing Additions|EPG 1019.5.4 Cement Processing Additions]]'''
+
4/29/11: New guidance is now available allowing the use of vibratory screeds for finishing bridge decks.
  
6/22/11:  AASHTO M 327 and M 85 now specified due to AASHTO and ASTM synchronizing their specs.
+
'''[[751.1 Preliminary Design#751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)|EPG 751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)]]
  
'''[[131.1 Design Exception Process#If the design exception request|EPG 131.1 Design Exception Process]]'''
+
4/29/11: A new bridge design schedule has been added.
  
6/22/11:  Design exceptions are now to be analyzed for safety where the AASHTO ''Highway Safety Manual'' allows.
+
'''[[616.21 Work Zone Technician Training|Work Zone Technician Training]]'''
  
'''[[:Category:822 Roadside Vegetation Management|EPG 822 Roadside Vegetation Management]]'''
+
4/28/11: EPG 616.21 has been updated with the link to the latest WZ training info.
  
6/22/11:  Guidance in EPG 822 has been generally re-written to reflect Practical Operations.
+
'''Access Justification Report (AJR) Guidance'''
  
'''Junkyard Forms'''
+
4/22/11: To comply with FHWA practices, AJR info has been updated in [[127.14 National Environmental Policy Act (NEPA) Classification and Documents#127.14.3.6 Projects Involving New or Revised Interstate Access|EPG 127.14.3.6]], [[:Category:234 Interchanges|EPG 234]], [[234.6 Diverging Diamond Interchanges#234.6.5.1 Access Justification Report (AJR)|EPG 234.6.5.1]] and [[:Category:240 Maintenance and Emergency Crossovers|EPG 240]].  Also, [[234.1 Access to Interstate Highways|EPG 234.1 Access to Interstate Highways]] was generally re-written and re-titled.
  
6/17/11: [[236.17 Junkyards|EPG 236.17 Junkyards]] has been updated with several renamed and revised forms.
+
'''[[616.23 Traffic Control for Field Operations|TA-2 and TA-3 Updated]]'''
  
'''[[236.16 Outdoor Advertising|EPG 236.16 Outdoor Advertising]]'''
+
4/21/11:  Sight distance guidance was clarified in TA-2 and TA-3 of the TCFO.
  
6/17/11: Many of the Right of Way forms have been updated and several new ones have been added.
+
'''[[:Category:403 Asphaltic Concrete Pavement|EPG 403 Asphaltic Concrete Pavement]]'''
  
'''[[:Category:402 Bituminous Surface Leveling|Contract Leveling Courses]]'''
+
4/19/11: Two figures, QA/QC Questions and Answers and Asphalt Cement Price Index Example Calculations, were updated.
  
6/7/11:  Most of the sheets in the Traffic Control CLC Templates were updated to be in line with current guidance. CLC Guidelines and JSP were also updated.
+
'''[[903.7 Conventional Road Guide Signs#903.7.64 Stream Name Signs (I-3)|EPG 903.7.64 Stream Name Signs (I-3)]]'''
  
'''[[:Category:619 Pavement Edge Treatment|Pavement Edge Treatment]]'''
+
4/18/11: Clarification of stream name signing policy.
  
6/17/11: Pavement Edge Treatment info was moved from EPG 616.17 to this new article to coordinate with pay items.  
+
'''[[:Category:144 Practical Operations|EPG 144 Practical Operations]]'''
 +
 +
4/14/11: Expanded guidance is available for [[:Category:144 Practical Operations#144.1 Winter Operations Changes|winter operations]], [[:Category:144 Practical Operations#144.4 Mowing Operations Changes|mowing]] and [[:Category:144 Practical Operations#144.5 Pavement Maintenance|pavement maintenance]].
  
'''System I Protective Coating'''
+
'''[http://epg.modot.org/index.php?title=Category:135_The_Section_106_Process#Section_106_Process_for_LPAs_Flowchart Section 106 Process for LPAs Flowchart]'''
  
6/13/11:  Guidance has been added to [[751.14 Steel Superstructure#751.14.5.8 Protective Coating Requirements|EPG 751.14.5.8]] and [[751.50 Standard Detailing Notes#A4. Protective Coatings|EPG 751.50]] to accommodate this new system.
+
4/11/11:  This flowchart in EPG 135 was updated to correctly show interaction with the State Historical Preservation Office (SHPO).
  
'''EPG 751 Revisions'''
+
'''Culvert Pipes'''
  
6/13/11: The limits were corrected for "No Wearing Surface" cantilevers in [[751.10 General Superstructure#No Wearing Surface:|EPG 751.10.3.2]] (to less than 3'-8"); in [[751.22 P/S Concrete I Girders#PART SECTION SHOWING|EPG 751.22.3.13]] the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure; in [[751.37 Drilled Shafts#751.37.6.1 Reinforcement Design|EPG 751.6.1]] guidance for minimum spacing was added; a suggested range in [[751.37 Drilled Shafts#751.37.6.2 Longitudinal Reinforcement|EPG 751.37.6.2]] was removed; and in [[751.37 Drilled Shafts#751.37.6.7 Shear Resistance|EPG 751.37.6.7]] the V<sub>s</sub> equation was corrected.
+
4/11/11: [[750.7 Non-Hydraulic Considerations#750.7.2 Types|EPG 750.7.2]] was revised to show that all crossroad culvert pipes are now specified by group rather than individual type. Acceptable groups are based on the traffic volume of the facility.

Revision as of 13:58, 30 August 2011

Engineering Policy Guide.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG
•Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
WELCOME
RECENT POLICY CHANGES IN THE EPG
Joplin faced a EF5 tornado on May 22nd. If you would like to make a donation to District 7 employees, please send checks to: D7 Highway Credit Union, 3929 E. 7th Street, Suite A, Joplin, MO 64801. Make checks payable to the D7 Highway Credit Union and reference D7 Employee Fund in the memo.
Main Page Aug 30, 2011.jpg
150px center
Work on the Ameilia Earhart Memorial Bridge continues even while the Missouri River remains well above flood stage. In the photo on the left, Atchison, KS is in the background.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Millions of hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Lebanon Intermediate Maintenance Worker Brent Jones is part of a crew repairing roadway edges on I-44 east of Lebanon.
Rich Bearden, D5 Electrician, rewires a traffic head for a flashing yellow arrow on Route F in Fulton.
FASTforward
Connect to the most recent and innovative business, policy and engineering solutions at MoDOT!

Junkyard Forms

6/17/11: EPG 236.17 Junkyards has been updated with several renamed and revised forms.

EPG 236.16 Outdoor Advertising

6/17/11: Many of the Right of Way forms have been updated and several new ones have been added.

Contract Leveling Courses

6/7/11: Most of the sheets in the Traffic Control CLC Templates were updated to be in line with current guidance. CLC Guidelines and JSP were also updated.

Pavement Edge Treatment

6/17/11: Pavement Edge Treatment info was moved from EPG 616.17 to this new article to coordinate with pay items.

System I Protective Coating

6/13/11: Guidance has been added to EPG 751.14.5.8 and EPG 751.50 to accommodate this new system.

EPG 751 Revisions

6/13/11: The limits were corrected for "No Wearing Surface" cantilevers in EPG 751.10.3.2 (to less than 3'-8"); in EPG 751.22.3.13 the size of the diaphragm was clarified in the "Part Section Showing Interm't Diaphragms" figure; in EPG 751.6.1 guidance for minimum spacing was added; a suggested range in EPG 751.37.6.2 was removed; and in EPG 751.37.6.7 the Vs equation was corrected.

EPG 136.10.14 Request for Concurrence

6/10/11: Expanded guidance has been provided for an LPA's request for concurrence.

EPG 907.3 Travel Safe Zones

6/7/11: Traffic Safety Quality Circle recommends a minimum length of 1 mile for the Travel Safe Zones.

Resource Manual for Equal Opportunity Contract Compliance

6/1/11: External Civil Rights has updated this resource containing detailed information concerning E.E.O. matters.

EPG 141.4 Transportation Improvement Program Amendments

5/12/11: Transportation Planning has provided new guidance for TIP amendments.

EPG 235.2.3 Project Agreements

5/5/11: The number of copies of the project agreement has been reduced to four. Additional guidance has also been provided about the agreement's distribution.

Engineering Professional Services

5/4/11: Several forms were updated in EPG 134.3 Engineering Professional Services Guidelines.

EPG 821.19 Problem Weeds

5/3/11: The recommended products and rates for some problem weeds have been updated.

EPG 751.8 LRFD Concrete Box Culverts

5/3/11: FHWA mandates that all bridges and foundations be designed in accordance with LRFD Bridge Design specs. This new article replaces EPG 751.8 LFD Culverts, that presented LFD Bridge Design Manual info.

EPG 751.39 Seal Course

4/29/11: Bridge has updated the design method.

EPG 751.10.15 Deck Concrete Finishing

4/29/11: New guidance is now available allowing the use of vibratory screeds for finishing bridge decks.

EPG 751.1.1.5 Routine New Bridge Design Schedule (Nonseismic)

4/29/11: A new bridge design schedule has been added.

Work Zone Technician Training

4/28/11: EPG 616.21 has been updated with the link to the latest WZ training info.

Access Justification Report (AJR) Guidance

4/22/11: To comply with FHWA practices, AJR info has been updated in EPG 127.14.3.6, EPG 234, EPG 234.6.5.1 and EPG 240. Also, EPG 234.1 Access to Interstate Highways was generally re-written and re-titled.

TA-2 and TA-3 Updated

4/21/11: Sight distance guidance was clarified in TA-2 and TA-3 of the TCFO.

EPG 403 Asphaltic Concrete Pavement

4/19/11: Two figures, QA/QC Questions and Answers and Asphalt Cement Price Index Example Calculations, were updated.

EPG 903.7.64 Stream Name Signs (I-3)

4/18/11: Clarification of stream name signing policy.

EPG 144 Practical Operations

4/14/11: Expanded guidance is available for winter operations, mowing and pavement maintenance.

Section 106 Process for LPAs Flowchart

4/11/11: This flowchart in EPG 135 was updated to correctly show interaction with the State Historical Preservation Office (SHPO).

Culvert Pipes

4/11/11: EPG 750.7.2 was revised to show that all crossroad culvert pipes are now specified by group rather than individual type. Acceptable groups are based on the traffic volume of the facility.