771.21 Rainy Day Bridge Activities: Difference between revisions
Jump to navigation
Jump to search
m 771.20 Rainy Day Bridge Activities moved to 771.21 Rainy Day Bridge Activities: re-numbered, per BR and MT |
mNo edit summary |
||
Line 6: | Line 6: | ||
*Flush bridge decks | *Flush bridge decks | ||
[[Category:771 Bridge Preventative Maintenance Guidelines|771. | [[Category:771 Bridge Preventative Maintenance Guidelines|771.21]] |
Revision as of 12:12, 10 June 2015
- Check bridge surface for ponding
- Check bridges and box culverts for drift and erosion
- Check drain basins at bridges
- Clean abutment caps
- Cut and treat brush and vines under bridges
- Flush bridge decks