Difference between revisions of "106.14 Proprietary Items"

From Engineering_Policy_Guide
Jump to navigation Jump to search
m (Per CM, for greater clarity,old EPG 106.14 (9228 hits - no appreciable history) was moved to EPG 106.11. New EPG 106.14 is aligned with Sec 106)
 
m (updated link)
 
Line 1: Line 1:
[http://www.modot.mo.gov/business/standards_and_specs/Sec0106.pdf Sec 106.14] describes actions to be taken when a [[131.2 Proprietary Items and Public Interest Findings|proprietary item]] becomes unavailable during the term of a contract.
+
[http://www.modot.org/business/standards_and_specs/SpecbookEPG.pdf#page=4 Sec 106.14] describes actions to be taken when a [[131.2 Proprietary Items and Public Interest Findings|proprietary item]] becomes unavailable during the term of a contract.
  
 
[[category: 106 Control of Material|106.14]]
 
[[category: 106 Control of Material|106.14]]

Latest revision as of 11:51, 8 June 2016

Sec 106.14 describes actions to be taken when a proprietary item becomes unavailable during the term of a contract.