102.1 Construction Inspection Guidance for Sec 102: Difference between revisions
Jump to navigation
Jump to search
m updated links |
m updated formatting and links |
||
| Line 1: | Line 1: | ||
[[image:102.1.jpg|right|250px]] | [[image:102.1.jpg|right|250px]] | ||
Bidding requirements and conditions for contractors are addressed in [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 102] of the Missouri Standard Specifications for Highway Construction. | |||
The Commission accepts bids for projects under conditions established by [https://www.modot.org/missouri-standard-specifications-highway-construction Sec. 102] of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures. | |||
[[Category:102 Bidding Requirements and Conditions]] | [[Category:102 Bidding Requirements and Conditions]] | ||
Revision as of 09:00, 13 January 2025

Bidding requirements and conditions for contractors are addressed in Sec 102 of the Missouri Standard Specifications for Highway Construction.
The Commission accepts bids for projects under conditions established by Sec. 102 of the Missouri Standard Specifications for Highway Construction. Sec. 102.5 establishes the contractor's personal responsibility for knowledge of job conditions and familiarity with plans and specifications. The resident engineer should be aware of the contents of these sections even though not directly involved in bidding procedures.