106.14 Proprietary Items: Difference between revisions
Jump to navigation
Jump to search
m updated link |
m updated formatting |
||
| Line 1: | Line 1: | ||
[ | [https://www.modot.org/missouri-standard-specifications-highway-construction Sec 106.14] describes actions to be taken when a [[131.2 Proprietary Items and Public Interest Findings|proprietary item]] becomes unavailable during the term of a contract. | ||
[[category: 106 Control of Material|106.14]] | [[category: 106 Control of Material|106.14]] | ||
Latest revision as of 12:21, 15 April 2025
Sec 106.14 describes actions to be taken when a proprietary item becomes unavailable during the term of a contract.