User contributions
Jump to navigation
Jump to search
- 10:46, 1 June 2018 diff hist -409 m Main Page EPG 751.50
- 10:43, 1 June 2018 diff hist +28 m 751.50 Standard Detailing Notes Per BR, updated Note B3.2
- 12:20, 31 May 2018 diff hist +7 m Main Page
- 12:06, 31 May 2018 diff hist -534 m Category:109 Measurement and Payment →109.7.1 Payment Estimates: Per CM, the Electronics Documentation Choice Request Form is now obsolete since all projects have the eConstruction JSP, which disallows the use of paper submittals.
- 09:43, 31 May 2018 diff hist -145 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, removed redundant #10 (was same as #9b) and renumbered following points
- 12:11, 30 May 2018 diff hist 0 m Category:109 Measurement and Payment →109.13 Prompt Payment to Subcontractors and Suppliers (for Sec 109.13): Per CM and ECR, pay period corrected to 15 days per Sec 109.13 and State Statue 34.057
- 10:47, 30 May 2018 diff hist 0 m 903.14 Memorial Signs →903.15.2 Memorial Highway and Bridge Program (M18-1, M18-2) (MUTCD Section 2M.10): Per TS, updated contact number
- 10:22, 30 May 2018 diff hist 0 N File:616.26 2018.jpg current
- 10:21, 30 May 2018 diff hist 0 m 616.26 Work Zone User Training current
- 10:17, 30 May 2018 diff hist +287 m 616.26 Work Zone User Training Per TS, updated links to training manuals
- 12:56, 25 May 2018 diff hist +14 m 413.1 Micro-Surfacing
- 12:31, 24 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 11:21, 24 May 2018 diff hist -66 m Main Page EPG 751.10.3.1
- 10:32, 24 May 2018 diff hist +4 m Category:625 Slab Stabilization Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:409 Seal Coat Per DE, minor updates to "Guidance for Asphalt Cement Price Index Adjustments"
- 10:31, 24 May 2018 diff hist +4 m Category:402 Bituminous Surface Leveling Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:30, 24 May 2018 diff hist +4 m Category:401 Bituminous Base and Pavement Per DE, minor updates to Guidance for Asphalt Cement Price Index Adjustments
- 10:29, 24 May 2018 diff hist 0 N File:403 Guidance for Asphalt Cement Price Index Adjustments May 2018.docx
- 10:29, 24 May 2018 diff hist +4 m Category:403 Asphaltic Concrete Pavement
- 10:16, 24 May 2018 diff hist +409 m 751.50 Standard Detailing Notes →H7. Slab Drains (Notes for Bridge Standard Drawings)
- 10:09, 24 May 2018 diff hist -237 617.2 Construction Inspection Guidelines for Sec 617 Per CM and EPS, eliminated the specified 4 ft distance required between traffic barrier and stored material. Associated with request #842 (5/17/18)
- 09:55, 24 May 2018 diff hist +522 m 751.10 General Superstructure →751.10.3.1 Type, Alignment and Spacing: Per BR, stated the allowed slab drain color coatings
- 15:04, 23 May 2018 diff hist +15 m Main Page
- 15:03, 23 May 2018 diff hist 0 N File:Main Page May 23, 2018.jpg current
- 15:02, 23 May 2018 diff hist -182 m Main Page
- 14:53, 22 May 2018 diff hist +1 m Main Page
- 11:14, 22 May 2018 diff hist +247 m Main Page EPG 106.12.1.1
- 11:12, 22 May 2018 diff hist -93 m 106.12 Pre-Acceptance Lists (PAL) →3) PAL Material Arrival Confirmation: Per CM, clarified Pre-Acceptance Identification Tag guidance to allow for identifying PAL material shipped to MoDOT projects.
- 10:45, 21 May 2018 diff hist 0 N File:121 Planning Framework 2018.docx current
- 10:45, 21 May 2018 diff hist +5 m Category:121 Project Planning, Prioritization and STIP Commitments Per TP, minor clarifications to "The Planning Framework for Transportation Decision Making"
- 13:50, 18 May 2018 diff hist 0 m Main Page
- 13:27, 18 May 2018 diff hist 0 N File:Main Page May 18, 2018.jpg current
- 13:26, 18 May 2018 diff hist +329 m Main Page
- 09:56, 18 May 2018 diff hist -10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, delayed correcting the sign number GO22-1 for Wet Paint Signs until later this year.
- 09:52, 18 May 2018 diff hist 0 N File:616.8.35a DECM 2018.pdf current
- 09:52, 18 May 2018 diff hist 0 N File:616.8.17a DECM 2018.pdf current
- 09:51, 18 May 2018 diff hist +10 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications for Design and Construction and Materials: Per TS, corrected discrepancies between the TAs and standard plans regarding the sign number GO22-1 for Wet Paint Signs.
- 15:44, 17 May 2018 diff hist +1 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM, updated contact name
- 15:23, 17 May 2018 diff hist +1 m Main Page
- 14:55, 17 May 2018 diff hist +35 m Main Page
- 14:54, 17 May 2018 diff hist +51 m 617.2 Construction Inspection Guidelines for Sec 617
- 14:51, 17 May 2018 diff hist +303 m Main Page EPG 616.19.2.5, EPG 617.2, EPG 806.7
- 14:47, 17 May 2018 diff hist 0 N File:806 Zone 3.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 2.jpg current
- 14:46, 17 May 2018 diff hist 0 N File:806 Zone 1.jpg current
- 14:45, 17 May 2018 diff hist 0 N File:806 design guidance map.jpg current
- 14:43, 17 May 2018 diff hist +2,557 Category:806 Pollution, Erosion and Sediment Control →Temporary Erosion Control Blankets (Sec. 806.90): Per Env'l, the types of erosion control blankets were increased and guidance now includes a matrix for choosing blanket types
- 14:39, 17 May 2018 diff hist +3 750.6 Erosion Control and Energy Dissipation →750.6.3.4 Erosion Control Blankets and Turf Reinforcement Mats: Per Env'l, the types of erosion control blankets were increased
- 14:23, 17 May 2018 diff hist -730 617.2 Construction Inspection Guidelines for Sec 617 Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.
- 14:19, 17 May 2018 diff hist +11 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.5 Temporary Traffic Barriers: Per EPS, clarified guidance for anchoring 2-loop and 3-loop concrete barriers on asphalt, composite and concrete pavements in work zones.