User contributions
Jump to navigation
Jump to search
- 14:02, 20 May 2024 diff hist -8 m Category:732 Flared End Sections →732.1 Installation: changed MES to FES current
- 13:55, 20 May 2024 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.2.2 Roadways with ADT ≤ 3500: corrected PVC diameter limit current
- 13:55, 20 May 2024 diff hist -125 m 750.7 Non-Hydraulic Considerations →750.7.2.4 Outer Roadway Drainage Structures: removed information that's covered in 750.7.6
- 12:49, 14 May 2024 diff hist +38 m Category:805 Seeding →805.1.2 Seed Mixes: add link current
- 16:19, 29 April 2024 diff hist 0 m 751.6 General Quantities →751.6.2.17 Excavation: erratum current
- 07:30, 22 March 2024 diff hist +7 m Job Special Provisions
- 16:57, 6 March 2024 diff hist 0 m 616.23 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: terminology
- 16:55, 6 March 2024 diff hist 0 m 616.6 Temporary Traffic Control Zone Devices (MUTCD 6F) →616.6.47 NO CENTER LINE Sign (WO8-12) (MUTCD 6F.47): terminology
- 16:53, 6 March 2024 diff hist 0 m 413.3 Ultrathin Bonded Asphalt Wearing Surface →413.3.4 Membrane Application Rate: terminology current