User contributions for EPGsysop
Jump to navigation
Jump to search
20 March 2017
- 11:5811:58, 20 March 2017 diff hist −250 m Main Page EPG 616.1
- 11:4211:42, 20 March 2017 diff hist +55 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: inserted link
- 10:1310:13, 20 March 2017 diff hist +495 m 606.1 Guardrail →606.1.3.2 End Terminals, Crash Cushions and Anchors: Per EPG, clarified grading limits and associated std plans
17 March 2017
- 13:5013:50, 17 March 2017 diff hist +118 m 751.50 Standard Detailing Notes Per BR, std details further revised to accommodate galvanized piling
- 13:3913:39, 17 March 2017 diff hist +2,609 m 751.50 Standard Detailing Notes →G5. 20" and 24" CIP Piles: Per BR, renamed "CIP Concrete Piles (Notes for Bridge Standard Drawings" and expanded to accommodate galvanized piling
- 11:5711:57, 17 March 2017 diff hist −9 m Other Aspects of Pavement Design →Shoulder Surface: Per EPG, guidance involving "should" and interstates was futher clarified
- 09:1209:12, 17 March 2017 diff hist 0 m Category:101 Standard Forms →Bridge
- 09:1009:10, 17 March 2017 diff hist 0 N File:101 No Rise Certificate 2017.pdf No edit summary
- 09:1009:10, 17 March 2017 diff hist 0 N File:101 Floodplain Development Permit Application 2017.pdf No edit summary current
- 09:0909:09, 17 March 2017 diff hist −4 m Category:101 Standard Forms →Bridge: Per BR, updated “Floodplain Development Permit/Application” and “No-Rise Certificate” by correcting title for SEMA contact and adding digital signatures and seal blocks
- 08:5108:51, 17 March 2017 diff hist +75 m Main Page EPG 616.14.10
- 08:4208:42, 17 March 2017 diff hist +10 m Category:Safe and Sound updated link
- 08:4108:41, 17 March 2017 diff hist +10 m Category:105 Control of Work updated link
- 08:4008:40, 17 March 2017 diff hist 0 N File:616.14.10 TMP.pdf No edit summary current
- 08:3908:39, 17 March 2017 diff hist +1,591 m 616.14 Work Zone Safety and Mobility Policy Per DE Liaison, clarified existing expectations for WZ Transportation Management Plan
- 07:2607:26, 17 March 2017 diff hist −21 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, updated links to four posters
- 06:2406:24, 17 March 2017 diff hist −62 m Main Page EPG 751.50
- 06:1906:19, 17 March 2017 diff hist +389 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per BR, it is not required for AASHTO’s design live load for ornamental pedestrian fencing to be applied simultaneously
16 March 2017
- 12:3212:32, 16 March 2017 diff hist −253 m Main Page EPG 236.16.9
- 12:1812:18, 16 March 2017 diff hist −487 m 236.16 Outdoor Advertising →236.16.9 Maintenance and Repair of Outdoor Advertising: Per RW, revised process for sending ODA courtesy letter
- 10:1910:19, 16 March 2017 diff hist 0 N File:751.1.2.19 Guidance 2016 June.xlsx No edit summary
- 10:1110:11, 16 March 2017 diff hist +4 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 10:0710:07, 16 March 2017 diff hist −47 m 751.1 Preliminary Design →751.1.2.19.3 Required Documents: Per BR, updated Foundation Report due date
- 09:3009:30, 16 March 2017 diff hist +22 m Other Aspects of Pavement Design →Shoulder Surface: Per DE, minor clarification for Type A3 shoulder use
- 08:1808:18, 16 March 2017 diff hist 0 N File:616.14 WZ Questions 2017.docx No edit summary current
- 08:1708:17, 16 March 2017 diff hist 0 m 616.14 Work Zone Safety and Mobility Policy Minor updates to Work Zone Questions for the Core Team
- 07:3807:38, 16 March 2017 diff hist +307 m Main Page EPG 903.18
- 07:1607:16, 16 March 2017 diff hist 0 N File:903 18 4.pdf No edit summary current
- 07:1507:15, 16 March 2017 diff hist 0 N File:903 18 2.pdf No edit summary current
- 07:1507:15, 16 March 2017 diff hist +795 m 903.17 Delineation and Object Markers Per TS, clarified Object Marker usage policy including figures showing standard installation details.
- 06:2306:23, 16 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 06:2106:21, 16 March 2017 diff hist 0 N File:751.50 Layer 2.jpg No edit summary current
- 06:2106:21, 16 March 2017 diff hist +29 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 06:2006:20, 16 March 2017 diff hist 0 N File:751.50 Layer 1.jpg No edit summary current
- 06:1906:19, 16 March 2017 diff hist +28 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 06:1306:13, 16 March 2017 diff hist +105 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
15 March 2017
- 14:2214:22, 15 March 2017 diff hist +119 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:1414:14, 15 March 2017 diff hist 0 N File:751.50 ksf.jpg No edit summary current
- 14:1414:14, 15 March 2017 diff hist 0 N File:751.50 ftlb.jpg No edit summary current
- 14:1414:14, 15 March 2017 diff hist +61 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:1014:10, 15 March 2017 diff hist 0 N File:751.50 kip.jpg No edit summary current
- 14:1014:10, 15 March 2017 diff hist −150 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:0214:02, 15 March 2017 diff hist 0 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 14:0014:00, 15 March 2017 diff hist 0 N File:751.50 ft.jpg No edit summary current
- 14:0014:00, 15 March 2017 diff hist −89 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 13:5813:58, 15 March 2017 diff hist +5 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 13:5713:57, 15 March 2017 diff hist 0 N File:751.50 ea.jpg No edit summary current
- 13:5713:57, 15 March 2017 diff hist −454 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 13:0413:04, 15 March 2017 diff hist +1,417 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 12:3912:39, 15 March 2017 diff hist +83 m 751.1 Preliminary Design →751.1.2.31 Finishing Up Design Layout