From Engineering_Policy_Guide
Revision as of 11:19, 3 December 2014 by Smithk (talk | contribs) (EPG 147.3, EPG 170)
Jump to navigation Jump to search
EPG 2013b.jpg


HELPFUL EPG VIDEOS: •Logging into the EPG •Finding Info in the EPG
•Article History & How to Receive EMails When Articles are Revised
___________
Want help on how to update your EPG guidance?  It is available at EPG Approval Process.
___________
The Electronic MoDOT Spec Book for Mobile Devices is now available. You may also sign up for E-Update notices. To receive notices regarding Engineering Policy Revisions, select "Engineering Policy" then mark the appropriate subjects of interest.


WELCOME
RECENT POLICY CHANGES IN THE EPG
MoDOT tested bridges at the 11th Annual Bridge Building Competition. The competition challenges SE Missouri high school juniors and seniors to design and construct the most efficient model bridge using thread, glue and 15 pieces of balsa wood. Among the many awards were those for three students who built the lightest bridges that carried the greatest loads:
1st - Tessa Mangels, Oak Ridge High School
2nd - Gabe Shrout, Oak Ridge High School
3rd - Andrew DeRousse, Ste. Genevieve High School
MoDOT and local officials ceremonially break ground for the Rte. 100 (Manchester Rd.) Great Streets Project. The $15.5 million contract, awarded to L Krupp Construction, will resurface Rte. 100 as well as provide median access changes, sidewalk improvements and enhancements such as wayfinding signage, illuminated street name signs and landscaping.
MoDOT and the city of Kansas City hosted a ceremonial ribbon cutting to celebrate the nearly complete Rte. 210 widening project. Ideker Inc., the project contractor, widened two-lane Rte. 210 to four lanes between Ameristar Dr. and Rte. 291 and built 10-ft. paved shoulders and several new turn lanes at an accelerated pace, having it ready for motorists in less than one year. Although the road is open to traffic, work will continue on the $10 million project through December.

MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry.

These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals.

MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.

Maintenance crews complete some concrete patching at the corner of Pirate Pride Dr. and U.S. 61 in Hannibal.
Perhaps you've wondered how many hits the most popular EPG articles have. As of early December, the numbers of hits are:
20. EPG 400, 103082 10. EPG 616, 152766
19. EPG 903.6, 108191 9. EPG 600, 186390
18. EPG 751.5, 109343 8. EPG 101, 189331
17. EPG 134, 112173 7. EPG 616.23, 190718
16. EPG 751.40, 112932 6. EPG 136.12, 197290
15. EPG 136.4, 112969 5. EPG 100, 230729
14. EPG 136.9, 118937 4. EPG 700, 238237
13. EPG 620.2, 120757 3. EPG 900, 257470
12. EPG 903, 135022 2. EPG 751, 297287
11. EPG 200, 147429 1. EPG Main Page, 1782191

EPG 170 Maintenance Activity Planning Guidelines

12/3/14: Updated the Work Scheduling Guide and Index of Printable Planning Guides. References to scrub seal and linseed oil treatments were removed. R328 Bridge Jt. Maintc. and R329 Bridge Cleaning & Flushing codes were added.

Job Order Contracting (JOC)

12/3/14: All of the JOC JSPs have been updated. Among the revisions, prices have been updated and some guard cable options have been added.

EPG 751.5 Structural Detailing Guidelines

12/1/14: EPG 751.5 has been generally rewritten and retitled "Structural Detailing Guidelines".

EPG 751.10.1.10 Slab Offsets for Curved Bridges

12/1/14: Guidance was updated and "Profile Grade & Vertical Curve Data" was retitled as "Slab Offsets for Curved Bridges".

EPG 751.1 Preliminary Design

12/1/14: This article was updated to current practice. Moved "Vertical and Horizontal Clearance" from EPG 748.7 to EPG 751.1.2.5 and renumbered subsequent articles.

Inspection of Bituminous Mixing Plants

11/25/14: In EPG 460.3.11 Reclaimed Asphalt Pavement (RAP), guidance was updated to replace outdated test method AASHTO TP58 with AASHTO T 327.

New QRG

11/20/14: A new QRG, Land Disturbance Project Information, has been added to EPG 101 Standard Forms.

Change Order Codes

11/18/14: The definition of "Routine Adjustment" was revised in the Change Order Codes.

Standard Detailing Note for Epoxy Coated Reinforcing Steel

11/18/14: A note pertaining to C1.15 was deleted and Note C1.16 was deleted because the requirement for adding epoxy coated test bars to the bar bill for bridges has been rescinded.

Contract Leveling Course

11/18/14: The Contract Leveling Course (CLC) Guidelines and JSPs have been updated in EPG 402 Bituminous Surface Leveling. Primarily, the Modifications to Surface Level Mix Mixtures Containing RAP and RAS JSP and the Safety Plan JSP are no longer required.

Outdoor Advertising Permitting

11/14/14: Guidance was added in EPG 236.16.15.2 Indemnification to reflect that applicants for a vegetation permit must now inspect the property.

Bidding Documents

11/7/14: In EPG 102 Bidding Requirements and Conditions, references to Indox were removed.

District Final Plans Checklist, Form D-12

11/7/14: In EPG 237.9.1 Final Design Plans Submittal, the Form D-12 was updated. Also, the Letter of Transmittal is no longer used.

Outdoor Advertising Personnel

11/6/14: EPG 236.16.2 Organization & Personnel has been updated to show the new boundaries of the six areas of Missouri served by the Outdoor Advertising Area Specialists.

Field Welder Qualification

10/31/14: EPG 712 Structural Steel Construction, especially EPG 712.1.4 Welding, EPG 712.1.5 High Strength Bolts and EPG 712.2.3.2 PAL Manufacturer Facilities Sampling, were updated to reflect current field welder qualification practices. Much of EPG 903.24.1 Procedure was deleted to removed archaic welder qualification info. Also, the Welder Qualification Form in EPG 101 was removed as it is no longer required.

Pavement Marking Acceptance Table

10/22/14: This table, used to determine the quality and remaining life of new and existing pavement markings, has been updated and clarified.

"Additional Information" Box Provides Quick References for Guardrail, Guard Cable and More

10/22/14: The box at the top of EPG 606 Guardrail and Guard Cable has been expanded to include pdf files presenting useful info about roadside hardware.

EPG 903.6.11 Chevron Alignment Signs

10/17/14: By Dec. 31, 2019, Chevron Alignment signs are to be installed on curves with AADTs greater than 1000 that also have an advisory speed that is 15 mph or more below the road’s posted speed.

EPG 134.2.4 Consultant Solicitation and Selection Process – Standard Solicitation Method for On-Call/Hourly Rate Contracts Cost Plus Fixed Fee Contracts

10/16/14: Verbiage about Hourly Rates was removed since they no longer apply to On-Call contracts.

EPG 110.3 Prevailing Wages and Records

10/16/14: Guidance was added about subcontractors signing the prevailing wage affidavit.

EPG 139 Design - Build

10/15/14: Additional guidance for existing practices is now available for this article, especially a Procurement Document Writing Guide.

EPG 110.3 Prevailing Wages and Records

10/15/14: Since the MO Dept. of Labor certified payroll form is no longer used by MoDOT, a sentence referencing it was removed.

EPG 751.50 Standard Detailing Notes H3c. Type N PTFE

10/1/14: Two new notes, H3.24 and H3.31, are now available for use on plan sheets.

EPG 139.8.2.6 Design-Build Proposal Selection and Project Award

9/24/14: Guidance about the Commission's project design approval for Design-Build projects was clarified.

EPG 170 Maintenance Activity Planning Guidelines

9/23/14: The Maintenance Activity Planning Guidelines have been revised to accommodate changes in MoDOT operations and to provide consistency among districts.