Talk:127.9 Floodplain Management
Jump to navigation
Jump to search
Could you explain the meaning of the second to last sentence in 127.9.2? Should the first reference to "regulatory floodway" be changed to "100-year floodplain"?
If there is to be an encroachment into the regulatory floodway, MoDOT must issue a "No-Rise" Certification as required by SEMA to obtain a floodplain development permit that is needed for any encroachment into the 100-year floodplain, regardless of whether it also takes place within the regulatory floodway.