Main Page
HELPFUL EPG VIDEOS: | •Logging into the EPG | |
•Finding Info in the EPG | ||
•Article History & How to Receive EMails When Articles are Revised | ||
___________ | ||
Want help on how to update your EPG guidance? It is available at EPG Approval Process. | ||
___________ | ||
The Electronic MoDOT Spec Book for Mobile Devices is now available |
RECENT POLICY CHANGES IN THE EPG | |||||||||||||||||||||||||||||||||
MoDOT has made great strides to build a good transportation system and increase taxpayers' trust in its ability to deliver what was promised. Innovative concepts, such as Practical Design and design-build, were used to deliver those commitments and have made MoDOT a leader in the transportation industry. These forward-thinking, innovative concepts are reflected in the ENGINEERING POLICY GUIDE (EPG). This document provides a single reference for all engineering and engineering-related guidance by combining the former Right of Way, Design, Bridge, Construction, Traffic and Maintenance manuals. MediaWiki, the engine behind the Wikipedia on the World Wide Web, is the software delivering the EPG. Over 20 million hits on the EPG endorse this format to be easy to navigate and pleasing to read. A small HELP ARTICLE is included to assist with helpful hints on how to use the EPG as well as other points of interest.
|
EPG 104.13.2 Value Engineering Proposals, Concept Proposal 7/1/14: Guidance has been expanded to clarify for the resident engineers and any contractors of the minimum expectations for VECP and PDVECP submittal information. Contractor's Affidavit Regarding Settlement of Claims (C-242) 7/1/14: New guidance has been provided, reflecting existing C-242 practice, that answers what the RE should do when contacted by suppliers or subcontractors claiming they have not been paid by the prime contractor. New Request for Environmental Services (RES) Form 6/30/14: The new RES Form and the associated instructions for the RES Form are now available. 6/26/14: This article has been expanded to clarify existing policy. EPG 110.3 Prevailing Wages and Records, Owner-Operator 6/25/14: Guidance was clarified about what is required before an RE can approve this owner-operator arrangement. EPG 703.2.8 Concrete Placement 6/23/14: Guidance about pouring backwalls and the associated construction joints conforming with the roadway crown was clarified. 6/23/14: Additional guidance about laying sprinkler hoses and sprayers before the concrete on bridge decks has properly set has been provided. EPG 751.50 Standard Detailing Notes, H. Superstructure Notes 6/20/14: In H10. Barrier Curbs and H11. Miscellaneous, the rustication requirements were removed and outdated or incorrect guidance on permissible alternate barrier curb reinforcing shapes were revised. EPG 748.7.3 Preparation of Bridge Survey Report 6/17/14: The requirement for districts to calculate drainage area for bridge surveys was removed in EPG 748.7.3.1 Procedure. Also EPG 748.7.3.9.4 GEO File (Stream Crossings) was added. 6/17/14: The wage rate interview requirements were clarified to meet federal constraints. The primary change combines all the frequency rates into one rate (except for JOCs, which are being added). Bridge Survey Information 6/17/14: EPG 238.3.37.10 Centerline and Offset Profiles, EPG 238.3.37.11 Streambed Profiles, EPG 238.3.37.12 Valley Sections, EPG 238.3.37.13 Typical Channel Sections and EPG 238.3.37.14 Existing Bridges were updated to match survey needs for geo files. EPG 751.50 Standard Detailing Notes 6/16/14: Additional guidance has been provided for both A1.2 and H1.3 standard detailing notes. Updated QRG 6/16/14: Subcontracts has been updated in EPG 101 Standard Forms. New article, EPG 150 Quality Management 6/13/14: EPG 105.23 Quality Management was updated and moved to EPG 150 Quality Management. This new article establishes file organization for Quality Management projects and increases efficiencies for users searching for files. New EPG 137.7 Close Out Procedure for Quality Management supports the new EPG 150 guidance. EPG 748 Hydraulics and Drainage 6/11/14: Various changes to EPG 748 articles include: EPG Category:750 Hydraulic Analysis 6/11/14: Various changes to EPG 750 articles include: EPG 350 Design for Bases and Aggregate Surfaces 6/11/14: Guidance about daylighting pavement drainage material in was clarified in this article. 6/11/14: This subarticle was reorganized to make info easier to access. Guardrail attachment guidance was also updated. Updated QRG 6/10/14: Digital Signature for Adobe Pro 10 (Contractors) has been updated in EPG 101 Standard Forms. EPG 131.2 Proprietary Items and Public Interest Findings 6/9/14: This article has been revised to better reflect the documentational requirements of CFR 635.411. Full Wage Rate Order 6/9/14: In EPG 110.1 Wage Rates, additional guidance is now available for acceptable locations of the full wage order. Also, a description of a spreadsheet of wages in lieu of the full wage order has been provided. EPG 751.1.3.6 Asphalt Wearing Surface 6/6/14: New guidance is available for the current bridge asphalt overlay seal coat policy. Concrete Plant Inspection 6/5/14: In EPG 106.4 Plant Inspections and EPG 501.1.5 Measurement of Material, guidance was revised to clarify the QC/QA roles for concrete plant inspections. This is part of the broader quality management (QM) initiative that MoDOT has been implementing over the past two years. Design Exception Information Form 6/4/14: This form has been updated to reflect the 13 criteria recently added to EPG 131.1 Design Exception Process. EPG 236.16 Outdoor Advertising 5/30/14: This article has been generally re-written and updated to reflect legislative changes. Readers should be sure to thoroughly familiarize themselves with the article. |