106.14 Proprietary Items

From Engineering_Policy_Guide
Revision as of 14:26, 1 July 2010 by Smithk (talk | contribs) (Per CM, for greater clarity,old EPG 106.14 (9228 hits - no appreciable history) was moved to EPG 106.11. New EPG 106.14 is aligned with Sec 106)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Sec 106.14 describes actions to be taken when a proprietary item becomes unavailable during the term of a contract.