User contributions for Smithk
Jump to navigation
Jump to search
9 July 2010
- 06:5206:52, 9 July 2010 diff hist 0 m Category:804 Topsoil →804.1 Construction Inspection Guidance for Sec 804: "ensure" correction
- 06:5106:51, 9 July 2010 diff hist 0 m Category:1057 Material for Joints →1057.2.4 Sampling: "ensure" correction
- 06:5006:50, 9 July 2010 diff hist 0 m Category:1060 Electrical Conduit →1060.2.1.1 Rigid Steel Conduit, Zinc Coated: "ensure" correction
- 06:4906:49, 9 July 2010 diff hist 0 m 617.3 Material Inspection for Sec 617 →617.3.2 Procedure: "ensure" correction
- 06:2706:27, 9 July 2010 diff hist +2 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Compacting in Cut (Sec 203.5.8): corrected a link to Sec 203
8 July 2010
- 07:3607:36, 8 July 2010 diff hist +240 m 751.22 Prestressed Concrete I Girders Addition of video
- 07:3307:33, 8 July 2010 diff hist 0 N File:751.22 Concrete Girder July 2010.wmv No edit summary current
- 07:2807:28, 8 July 2010 diff hist +81 m 234.4 Single Point Urban Interchanges (SPUIs) Addition of SPUI video
- 07:2707:27, 8 July 2010 diff hist 0 N File:234.4 SPUI June 2010.wmv No edit summary current
7 July 2010
- 14:4114:41, 7 July 2010 diff hist +41 m Main Page EPG 237.8.1 Calendar days
- 14:4014:40, 7 July 2010 diff hist +1 m 237.8 Contract Time →237.8.1 Working Days vs. Completion Dates: updated title
- 14:3514:35, 7 July 2010 diff hist −25 m 237.8 Contract Time →237.8.1 Working Days vs. Completion Dates: Per EPG Approval Process, contract time is now should be governed by calendar days on most projects.
- 13:4913:49, 7 July 2010 diff hist 0 N File:1029.4.6 July 2010.gif No edit summary current
- 13:4913:49, 7 July 2010 diff hist 0 N File:1029.4.5 July 2010.gif No edit summary current
- 13:4813:48, 7 July 2010 diff hist 0 N File:1029.4.4 July 2010.gif No edit summary current
- 13:4813:48, 7 July 2010 diff hist 0 N File:1029.4.3 July 2010.gif No edit summary current
- 13:4713:47, 7 July 2010 diff hist 0 N File:1029.4.2 July 2010.jpg No edit summary current
- 13:4713:47, 7 July 2010 diff hist 0 N File:1029.4.1 July 2010.jpg No edit summary current
- 13:4613:46, 7 July 2010 diff hist +804 m Category:1029 Fabricating Prestressed Concrete Members for Bridges Clarification, per CM, of guidance for directional assignment of tolerances
- 12:0812:08, 7 July 2010 diff hist 0 N File:617.2 2 Loop.jpg No edit summary current
- 12:0712:07, 7 July 2010 diff hist +1 m 617.2 Construction Inspection Guidelines for Sec 617 minor correction
- 11:4311:43, 7 July 2010 diff hist 0 N File:617.2 Improper.jpg No edit summary current
- 11:4311:43, 7 July 2010 diff hist 0 N File:617.2 Proper.jpg No edit summary current
- 11:4311:43, 7 July 2010 diff hist 0 N File:617.2 Loop.jpg No edit summary current
- 11:4211:42, 7 July 2010 diff hist 0 N File:617.2 3 Loop Improper.jpg No edit summary current
- 11:4211:42, 7 July 2010 diff hist 0 N File:617.2 3 Loop Proper 2.jpg No edit summary current
- 11:4111:41, 7 July 2010 diff hist 0 N File:617.2 3 Loop Proper 1.jpg No edit summary current
- 11:4111:41, 7 July 2010 diff hist +1,397 m 617.2 Construction Inspection Guidelines for Sec 617 Per Traffic and CM, additional guidance on the connection between various barrier types
- 10:3410:34, 7 July 2010 diff hist +138 m Main Page EPG 110.2 federal poster
- 09:2509:25, 7 July 2010 diff hist 0 N File:135.4 Jobsite bulletin board checklist July 2010.pdf No edit summary
- 09:2409:24, 7 July 2010 diff hist +237 m Category:110 State and Federal Wage Rates and Other Requirements →Required Notices and Posters: Per ECR, new Federal poster (Employee Rights) added. Checklist of jobsite posters also updated.
- 09:2109:21, 7 July 2010 diff hist 0 N File:110.2 Employee Rights National Labor Relations Spanish.pdf No edit summary
- 09:2109:21, 7 July 2010 diff hist 0 N File:110.2 Employee Rights National Labor Relations.pdf No edit summary
- 09:2109:21, 7 July 2010 diff hist +218 m Category:101 Standard Forms →Posters, Federal Aid: Per ECR, new Federal poster (Employee Rights) added
- 08:0608:06, 7 July 2010 diff hist 0 N File:236.11.2 Mediation Proposal (Form 11.2.7) July 2010.doc No edit summary current
- 08:0508:05, 7 July 2010 diff hist +20 m 236.11 Mediation Per RW, updated Form 11.2.7
- 07:3807:38, 7 July 2010 diff hist +1,681 m Category:109 Measurement and Payment →109.7 Partial Payments (for Sec 109.7): Per CM, EPG 105.9.16.4.3 info consolidated into EPG 109.7
- 07:2107:21, 7 July 2010 diff hist −4 m Category:203 Roadway and Drainage Excavation, Embankment and Compaction →Borrow (Sec 203.3): minor clarification
- 07:1607:16, 7 July 2010 diff hist −10 m 616.23 Construction Inspection Guidelines for Sec 616 →Construction Requirements (for Sec 616.4): updated link
- 07:1307:13, 7 July 2010 diff hist −10,861 m Category:105 Control of Work →105.9.16.4.3 Payment Estimates: Per CM, EPG 105.9.16.4.3 info consolidated into EPG 109.7
- 06:2506:25, 7 July 2010 diff hist −1 m Engineering Professional Services Guidelines →Sample Information for Solicitation: corrected spelling
6 July 2010
- 13:2913:29, 6 July 2010 diff hist −133 m Main Page EPG 110.3 Prevailing Wages and Records
- 13:2513:25, 6 July 2010 diff hist +4,103 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Clarification, per CM and ECR, to meet Dept of Labor requirements
- 11:3311:33, 6 July 2010 diff hist +309 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, clarification to the "change in scope" procedure for change orders and removed a redundant requirement for non-major change orders
- 06:5706:57, 6 July 2010 diff hist +30 m 949.2 Speed Limit Guidelines →949.2.2.5 Adjacent Development: added link to TMS
- 06:5306:53, 6 July 2010 diff hist +60 m 121.5 Asset Management added TMS links
- 06:5106:51, 6 July 2010 diff hist +30 m Category:128 Conceptual Studies →128.3.2 Traffic Data: added TMS link
2 July 2010
- 11:3311:33, 2 July 2010 diff hist −54,786 m Category:137 Construction Inspection Guidance for Records to be Maintained Per CM, old EPG 137 primarily moved to EPG 105.9 (and also EPG 109). New EPG 137 is former EPG 137.10. (9/21/09 CM entered old EPG 137.10 to provide additional guidance for archive process.)
- 11:1211:12, 2 July 2010 diff hist +2 m Category:402 Bituminous Surface Leveling No edit summary
- 11:1111:11, 2 July 2010 diff hist −1 m Category:402 Bituminous Surface Leveling aesthetic revision