User contributions for Smithk
Jump to navigation
Jump to search
14 September 2010
- 06:4606:46, 14 September 2010 diff hist −10 m Help Article →Division Contacts: removed contact
- 06:4406:44, 14 September 2010 diff hist 0 m 106.21 Summary of Materials Inspected →106.21.2 Distribution
- 06:3606:36, 14 September 2010 diff hist +10 m Help Article →Division Contacts: updated contact
13 September 2010
- 11:1311:13, 13 September 2010 diff hist 0 N File:902.8.3.jpg No edit summary current
- 10:2110:21, 13 September 2010 diff hist 0 File:616.2 WZ Signing 2010.jpg uploaded a new version of "Image:616.2 WZ Signing 2010.jpg" current
- 10:2010:20, 13 September 2010 diff hist 0 File:616.2 WZ Signing 2010.jpg uploaded a new version of "Image:616.2 WZ Signing 2010.jpg"
- 10:1910:19, 13 September 2010 diff hist 0 File:616.2 WZ Signing 2010.jpg uploaded a new version of "Image:616.2 WZ Signing 2010.jpg"
- 10:1810:18, 13 September 2010 diff hist 0 File:616.2 WZ Signing 2010.jpg uploaded a new version of "Image:616.2 WZ Signing 2010.jpg"
- 10:1610:16, 13 September 2010 diff hist 0 N File:616.2 WZ Signing 2010.jpg No edit summary
- 09:0709:07, 13 September 2010 diff hist −1 m 616.27 Traffic Control for Field Operations →Taper Spacing Chart: updated link
- 09:0609:06, 13 September 2010 diff hist −1 m 616.27 Traffic Control for Field Operations →616.23.2.2.2 Temporary Traffic Control Zone: updated link
- 08:3008:30, 13 September 2010 diff hist +66 m Category:749 Hydrologic Analysis →749.6.1.4 Limitations of Equations: minor clarification
- 08:0308:03, 13 September 2010 diff hist −3 m Category:700 STRUCTURES AND HYDRAULICS minor clarification
- 08:0108:01, 13 September 2010 diff hist +273 m Category:700 STRUCTURES AND HYDRAULICS minor clarification
- 07:5707:57, 13 September 2010 diff hist +273 Category:600 INCIDENTAL CONSTRUCTION No edit summary
- 07:5507:55, 13 September 2010 diff hist +274 m Category:200 GEOMETRICS minor clarification
- 07:5407:54, 13 September 2010 diff hist +274 m Category:100 GENERAL minor clarification
- 07:5207:52, 13 September 2010 diff hist +273 m Category:400 FLEXIBLE PAVEMENT minor clarification
- 07:5007:50, 13 September 2010 diff hist −99 m Help Article minor change
10 September 2010
- 11:0711:07, 10 September 2010 diff hist −161 m 903.4 Guide Signs—Conventional Roads (MUTCD Chapter 2D) →903.7.47 Airport Sign (I-5a series) (MUTCD Section 2D.43a)
- 11:0611:06, 10 September 2010 diff hist +162 903.4 Guide Signs—Conventional Roads (MUTCD Chapter 2D) →903.7.47 Airport Sign (I-5a series) (MUTCD Section 2D.43a)
8 September 2010
- 14:4614:46, 8 September 2010 diff hist 0 N File:127.19.wmv No edit summary current
- 14:4614:46, 8 September 2010 diff hist +232 m 127.19 Section 404 Clean Water Act for Bridge Demolitions added video
- 14:0614:06, 8 September 2010 diff hist +3 m Main Page minor correction
- 14:0514:05, 8 September 2010 diff hist 0 N File:Main Page Sep 8, 2010.jpg No edit summary current
- 14:0514:05, 8 September 2010 diff hist −97 m Main Page new photo
- 12:3612:36, 8 September 2010 diff hist +66 m Category:132 Safety added link
- 10:5510:55, 8 September 2010 diff hist +226 m Main Page EPG 135 update
- 10:4710:47, 8 September 2010 diff hist 0 N File:135.2.pdf No edit summary
- 10:4610:46, 8 September 2010 diff hist 0 N File:135 Section 106 Procedures.pdf No edit summary
- 10:4610:46, 8 September 2010 diff hist 0 N File:135 historic bridge.jpg No edit summary current
- 10:4510:45, 8 September 2010 diff hist 0 N File:135.2 Section 106 review.jpg No edit summary current
- 10:4410:44, 8 September 2010 diff hist 0 N File:135 historic.jpg No edit summary current
- 10:4310:43, 8 September 2010 diff hist +11,432 m Category:135 The Section 106 Process Per Environmental, this article updated to include Sec 106 guidance for MoDOT employees
- 10:1510:15, 8 September 2010 diff hist −9 m Category:101 Standard Forms update links
- 09:4609:46, 8 September 2010 diff hist +9 m Category:101 Standard Forms →Design Forms: trial update
- 07:2907:29, 8 September 2010 diff hist 0 m 104.7 Scoping Estimates updated link
- 07:2907:29, 8 September 2010 diff hist 0 m Category:104 Scope updated link
- 07:1907:19, 8 September 2010 diff hist +1 m 643.4 Railroads →643.4.1 Introduction and Railroad Project Overview
- 07:1807:18, 8 September 2010 diff hist +4 m 643.4 Railroads →643.4.1 Introduction and Railroad Project Overview: minor clarification
- 07:1507:15, 8 September 2010 diff hist −19 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated link
- 07:1307:13, 8 September 2010 diff hist 0 m 121.3 The Statewide Transportation Improvement Program (STIP) updated links
- 07:0807:08, 8 September 2010 diff hist +4 m LPA:136.8 Local Public Agency Land Acquisition →236.18.2.2 Pre-Acquisition Requirements With Federal Funds Participation in Any Part of The Project (Right of Way or Construction): minor clarification
7 September 2010
- 14:0514:05, 7 September 2010 diff hist +320 m 136.5 Agreements Per LPA Coordinator, clarification for CCO contract source
- 13:3813:38, 7 September 2010 diff hist +12 m Category:101 Standard Forms →Bridge: Per Bridge, clarification of two form titles
- 12:1212:12, 7 September 2010 diff hist +1,244 m 136.2 Bridge Soft Match Credit Program Per LPA Coordinator, FHWA and MoDOT's senior management: Final inspection to be performed by a team leader certified inspector. Also, clarification of noncontroversial.
- 11:3211:32, 7 September 2010 diff hist +76 m Category:753 Bridge Inspection Rating minor clarification
- 10:2110:21, 7 September 2010 diff hist 0 N File:751.13.5.3 Int Bent.gif No edit summary
- 10:2110:21, 7 September 2010 diff hist 0 N File:751.13.5.3 End Bent.gif No edit summary
- 10:2110:21, 7 September 2010 diff hist 0 N File:751.13.5.2 Int Bent.gif No edit summary