- 10:0210:02, 20 October 2010 diff hist +300 m Category:108 Prosecution and Progress →108.16.2 Key Dates: Per CM, allotting 4 weeks to clear final payments to subcontractors so the PM can submit final documentation.
19 October 2010
- 06:2806:28, 19 October 2010 diff hist +133 m Category:110 State and Federal Wage Rates and Other Requirements →110.3.3 Semi-Annual Labor Report: Per CM and ECR, submittal info added for Semi-Annual Labor Report.
15 October 2010
- 10:2810:28, 15 October 2010 diff hist +123 m 236.16 Outdoor Advertising updated link to Notice of Withdrawal
- 10:2510:25, 15 October 2010 diff hist +154 m Category:101 Standard Forms →Right of Way: added link to Application for License to Maintain a Junkyard
- 09:1209:12, 15 October 2010 diff hist +545 N 106.9 Buy America Requirement Per LPA Coordinator & CM, article renamed "Buy America" (not "American"). 7/1/10,per CM, for greater clarity,old EPG 106.9 (3051 hits) was moved to EPG 106.20. New EPG 106.9 is aligned with Sec 106.
- 09:0209:02, 15 October 2010 diff hist 0 N File:754 Appendix 1 the consultants Oct 10.doc No edit summary current
- 09:0209:02, 15 October 2010 diff hist 0 m Category:754 Bridge Engineering Assistance Program (BEAP) per Bridge, the list of current BEAP consulants was updated
14 October 2010
- 08:5808:58, 14 October 2010 diff hist +4 m Category:133 Snow and Ice Control →Intent: minor clarification
- 08:0208:02, 14 October 2010 diff hist +210 m Talk:Main Page No edit summary
- 08:0008:00, 14 October 2010 diff hist +27 m 102.2 Contractor Performance, Referrals, and Endorsements Updated Contractor Performance Report Questionnaire
- 07:3307:33, 14 October 2010 diff hist 0 m Category:123 Federal-Aid Highway Program →123.3.1.3.5 Material from an Unrealted Source: spelling correction - thanks Jeff!
- 06:5906:59, 14 October 2010 diff hist +107 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: Note change in EPG 136.6
- 06:5706:57, 14 October 2010 diff hist 0 N File:136.6.2 Consultant Selection Criteria (Fig. 6-2) Oct 2010.doc No edit summary current
- 06:5606:56, 14 October 2010 diff hist +18 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA Coordinator, updated Fig 136.6.2 Consultant Selection Criteria
13 October 2010
- 08:0008:00, 13 October 2010 diff hist −2 m Main Page No edit summary
- 07:5907:59, 13 October 2010 diff hist 0 N File:Main Page Oct 13, 2010.jpg No edit summary current
- 07:5907:59, 13 October 2010 diff hist +186 m Main Page new photo
12 October 2010
- 06:4506:45, 12 October 2010 diff hist −1 m Main Page Cheveron Initiative info
- 06:3806:38, 12 October 2010 diff hist +672 m 903.3 Warning Signs and Object Markers (MUTCD Chapter 2C) Per Traffic, chevrons to be placed on all curves having a 15 mph difference between the posted speed limit and the advisory speed for the curve.
7 October 2010
- 14:3014:30, 7 October 2010 diff hist +320 m Main Page EPG 910.3
- 14:2814:28, 7 October 2010 diff hist +2 m 910.3 Dynamic Message Signs (DMS) →910.3.2.6 Installation of DMS: minor clarification
- 14:2114:21, 7 October 2010 diff hist +9,124 m 910.3 Dynamic Message Signs (DMS) Per Traffic, numerous minor updates and clarifications
- 13:4313:43, 7 October 2010 diff hist +32 m 748.7 Bridge Reports and Layouts →748.7.4.4 Grades: minor clarification
- 13:3913:39, 7 October 2010 diff hist −107 m Main Page new EPG 131.1.3
- 13:3513:35, 7 October 2010 diff hist +246 748.7 Bridge Reports and Layouts →748.7.4.4 Grades: Per Bridge and Design, added EPG 131.1.3 link to new minimum horizontal and vertical clearance for grade separation structures guidance
- 13:3113:31, 7 October 2010 diff hist 0 m 131.1 Design Exception Process →131.4.3 Deficient Vertical Clearances on Interstates: minor correction
- 13:2413:24, 7 October 2010 diff hist 0 N File:131.1.3 SDDCTEA Form.pdf No edit summary
- 13:2413:24, 7 October 2010 diff hist +2,821 131.1 Design Exception Process Per Bridge and Design, guidance added about deficient vertical clearance on interstates
- 11:5011:50, 7 October 2010 diff hist 0 m 103.1 Bid Opening and Award Process updated link
- 11:4811:48, 7 October 2010 diff hist 0 m Category:Safe and Sound →Schedule: updated link
- 11:4611:46, 7 October 2010 diff hist 0 m 237.9 Submission of Plans and Supporting Documents →237.9.6.1 Schedule for Submittal: updated link
- 11:2111:21, 7 October 2010 diff hist +1 m Main Page No edit summary
- 10:1410:14, 7 October 2010 diff hist 0 N File:Main Page 2 Oct 7, 2010.jpg No edit summary current
- 10:1410:14, 7 October 2010 diff hist +72 m Main Page updated photo
6 October 2010
- 12:5412:54, 6 October 2010 diff hist +35 m Category:134 Engineering Professional Services →134.2 The Professional Services Committee (PSC) and Qualifications Based Selection (QBS): added link
- 09:5009:50, 6 October 2010 diff hist +4 m Main Page minor correction
- 09:4709:47, 6 October 2010 diff hist +798 m Main Page Revisions to EPG 106, 136, 616, 643 and 1026 noted
- 09:4009:40, 6 October 2010 diff hist +51 m 616.27 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: added link
- 09:0809:08, 6 October 2010 diff hist +2,454 643.3 Reserved for Future Use →643.3.16 General Guidelines for Bridge Attachments: Per LPA Coordinator, new guidance to clarify a utilities responsibilities to determine the exact location of facilities on MoDOT r/w
- 08:3108:31, 6 October 2010 diff hist −125 616.27 Traffic Control for Field Operations →616.23.2.5.7 Pavement Markings: Per Traffic, updated guidance for temporary pavement markings
- 08:0708:07, 6 October 2010 diff hist 0 File:106.3.2.83.7 elevation.jpg uploaded a new version of "Image:106.3.2.83.7 elevation.jpg" current
- 08:0708:07, 6 October 2010 diff hist 0 m 106.3.2.83 TM-83, Field Estimation of Water Permeability of Compacted Asphalt Paving Mixtures →106.3.2.83.7 Report: figure adjustment
- 08:0408:04, 6 October 2010 diff hist 0 N File:106.3.2.83.7 elevation.jpg No edit summary
- 07:5807:58, 6 October 2010 diff hist 0 N File:106.3.2.83.7 plan.jpg No edit summary current
- 07:5707:57, 6 October 2010 diff hist 0 N File:106.3.2.83.7 elevation.pdf No edit summary
- 07:5707:57, 6 October 2010 diff hist +6,950 N 106.3.2.83 TM-83, Field Estimation of Water Permeability of Compacted Asphalt Paving Mixtures New article, per CM
- 07:1507:15, 6 October 2010 diff hist +48 Category:1026 Reinforced Concrete Culvert Pipe →Manufacturer Approval: Per CM Physical Lab, acceptance of precast drainage units (precast concrete box culverts) exapnded to include NPCA
5 October 2010
- 10:5410:54, 5 October 2010 diff hist +731 m LPA:136.12 Figures, Glossary and Other Useful Links →136.14.5 Recent Changes to LPA Policy: various changes noted
- 10:5310:53, 5 October 2010 diff hist +1,228 LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.9.5 Retainage: Per LPA Coordinator, retainage guidance added
- 10:4810:48, 5 October 2010 diff hist +248 LPA:136.4 Consultant Selection and Consultant Contract Management →136.6.2 Solicitation and Selection Procedures: Per LPA Coordinator, revision will ensure compliance with the Brooks Act, etc. Failure to comply with procedure may result in loss of funding