User contributions for Smithk
Jump to navigation
Jump to search
5 March 2012
- 09:4909:49, 5 March 2012 diff hist −2 m Main Page No edit summary
- 09:1309:13, 5 March 2012 diff hist 0 m 750.4 Storm Sewers →750.4.4 Hydraulic Design and Analysis of Storm Drain Conduits
- 08:5208:52, 5 March 2012 diff hist +5 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence
- 08:3808:38, 5 March 2012 diff hist 0 N File:135.2 quick.pdf No edit summary
- 08:3808:38, 5 March 2012 diff hist −4 m Category:135 The Section 106 Process Per Design, added a Quick Guide for EPG 135.2
29 February 2012
- 11:1711:17, 29 February 2012 diff hist 0 m Main Page No edit summary
28 February 2012
- 13:2313:23, 28 February 2012 diff hist 0 N File:Table 751.38.3.2.jpg No edit summary current
- 13:2313:23, 28 February 2012 diff hist +2,156 m 751.38 Spread Footings Per Bridge, numerous minor edits
- 13:1913:19, 28 February 2012 diff hist 0 N File:Table Commentary 751.38.3.1.jpg No edit summary current
- 13:1713:17, 28 February 2012 diff hist 0 N File:751.37.3.3.2 Feb 2012.jpg No edit summary current
- 13:1713:17, 28 February 2012 diff hist 0 N File:751.37.3.3.1 Feb 2012.jpg No edit summary current
- 13:1613:16, 28 February 2012 diff hist 0 N File:Table 751.37.3.2.jpg No edit summary current
- 13:1513:15, 28 February 2012 diff hist +3,518 m 751.37 Drilled Shafts Per Bridge, numerous minor edits
27 February 2012
- 14:0214:02, 27 February 2012 diff hist +358 m Main Page EPG 751
- 13:5613:56, 27 February 2012 diff hist +43 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: added link
- 13:4813:48, 27 February 2012 diff hist 0 N File:751.1.2.6 box culverts.pdf No edit summary
- 13:4513:45, 27 February 2012 diff hist +400 m 751.50 Standard Detailing Notes →A2. Concrete Box Culverts and Other Type Structures: Per Bridge, guidance clarified to require fill to be rolled up and over culverts; so, regular used culvert notes were added
- 13:4013:40, 27 February 2012 diff hist +934 m 751.8 Concrete Box Culverts →751.8.1.4 Other Dimensions: Per Bridge, clarification of guidance for locating headwalls; requiring fill to be rolled up and over culverts; handling long wings due to large skews.
- 13:3113:31, 27 February 2012 diff hist +564 m 751.1 Preliminary Design →751.1.2 Bridges/Boxes: Per Bridge, clarification of guidance for locating headwalls; requiring fill to be rolled up and over culverts; handling long wings due to large skews.
- 12:3012:30, 27 February 2012 diff hist 0 N File:236.18.3A Feb 2012.doc No edit summary current
- 12:3012:30, 27 February 2012 diff hist 0 N File:Form 236.18.2 Feb 2012.doc No edit summary current
- 12:3012:30, 27 February 2012 diff hist +45 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Forms 236.18.2 and 236.18.3A
- 11:5511:55, 27 February 2012 diff hist +92 m Main Page E 751.12.4
- 11:4911:49, 27 February 2012 diff hist 0 N File:751.12.4 typical section near splice gap (112 in).jpg No edit summary current
- 11:4811:48, 27 February 2012 diff hist 0 N File:751.12.4 details at expansion device gap.jpg No edit summary current
- 11:4811:48, 27 February 2012 diff hist 0 m 751.12 Barriers, Railings, Curbs and Fences No edit summary
- 11:4711:47, 27 February 2012 diff hist 0 N File:751.12.4 curved top.jpg No edit summary current
- 11:4611:46, 27 February 2012 diff hist 0 N File:751.12.4 section aa.jpg No edit summary current
- 11:4611:46, 27 February 2012 diff hist 0 N File:751.12.4 typical section near splice gap.jpg No edit summary current
- 11:4511:45, 27 February 2012 diff hist 0 N File:751.12.4 details of expansion device gap.jpg No edit summary current
- 11:4411:44, 27 February 2012 diff hist 0 N File:751.12.4 plan of floor plate.jpg No edit summary current
- 11:4411:44, 27 February 2012 diff hist 0 N File:751.12.4 rail post connection.jpg No edit summary current
- 11:4411:44, 27 February 2012 diff hist 0 N File:751.12.4 handrail bracket.jpg No edit summary current
- 11:4311:43, 27 February 2012 diff hist 0 N File:751.12.4 superstructure near end panel.jpg No edit summary current
- 11:4311:43, 27 February 2012 diff hist 0 N File:751.12.4 superstructure near steps.jpg No edit summary current
- 11:4211:42, 27 February 2012 diff hist −50 m 751.12 Barriers, Railings, Curbs and Fences →751.12.4 Chain Link Fence: Per Bridge, updated fencing details
- 11:0011:00, 27 February 2012 diff hist +103 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per Bridge, updated fencing details
- 10:0910:09, 27 February 2012 diff hist +61 m Main Page EPG 104.13.2
- 09:5209:52, 27 February 2012 diff hist −1 m 104.13 Construction Inspection Guidance for Sec 104 →Specification Provision
- 09:5109:51, 27 February 2012 diff hist 0 N File:Fig. 104.13.jpg No edit summary current
- 09:3809:38, 27 February 2012 diff hist 0 N File:Fig. 104.13.ppt No edit summary current
- 09:3609:36, 27 February 2012 diff hist +756 m 104.13 Construction Inspection Guidance for Sec 104 →104.13.2 Value Engineering Proposals (Sec 104.6): Per Innovations Engineer, updated the guidance to reflect current practice
24 February 2012
- 14:2514:25, 24 February 2012 diff hist 0 Main Page No edit summary
- 14:2314:23, 24 February 2012 diff hist 0 m Main Page No edit summary
23 February 2012
- 14:2814:28, 23 February 2012 diff hist −18 m 233.3 Roundabouts No edit summary
- 12:1412:14, 23 February 2012 diff hist −91 m Main Page EPG 233.3
- 12:0412:04, 23 February 2012 diff hist −34,811 m 233.3 Roundabouts Per Traffic and Design, removal of most of article while new guidance is being prepared.
- 09:4809:48, 23 February 2012 diff hist +217 m Category:900 TRAFFIC CONTROL Per Traffic, added link
- 08:5708:57, 23 February 2012 diff hist 0 N File:136 google lpa.jpg No edit summary current
- 08:5708:57, 23 February 2012 diff hist +88 m LPA:136 Local Public Agency (LPA) Policy Google LPA added