User contributions for Smithk
Jump to navigation
Jump to search
18 October 2013
- 11:1411:14, 18 October 2013 diff hist 0 N File:806 ESC.docx No edit summary
- 11:1411:14, 18 October 2013 diff hist 0 N File:806 Online ESC.docx No edit summary
- 11:1311:13, 18 October 2013 diff hist +596 m Category:806 Pollution, Erosion and Sediment Control Per Environmental, new forms added
17 October 2013
- 15:2215:22, 17 October 2013 diff hist +4,181 m 750.7 Non-Hydraulic Considerations moved guidance for greater clarity
- 15:2115:21, 17 October 2013 diff hist +18 m 750.2 Culverts updated link
- 13:5513:55, 17 October 2013 diff hist 0 m LPA:136.8 Local Public Agency Land Acquisition →136.8.10.1 General
- 12:5812:58, 17 October 2013 diff hist −43 m LPA:136.8 Local Public Agency Land Acquisition →136.8.10.1 General: removed archaic link
- 12:4212:42, 17 October 2013 diff hist 0 N File:941.2 coordination 2013.jpg No edit summary current
- 12:0912:09, 17 October 2013 diff hist 0 N File:Main Page Oct 17, 2013.jpg No edit summary current
- 12:0912:09, 17 October 2013 diff hist −616 m Main Page new photo
- 11:1211:12, 17 October 2013 diff hist +16 m 751.1 Preliminary Design →751.1.2.16 Preliminary Cost Estimate: Per Bridge, updated Bridge section name
- 11:0911:09, 17 October 2013 diff hist +22 m 751.6 General Quantities Per Bridge, updated Bridge section name
16 October 2013
- 10:2810:28, 16 October 2013 diff hist +1 m Main Page No edit summary
- 10:2710:27, 16 October 2013 diff hist 0 N File:Main Page 2 Oct 16, 2013 2.jpg No edit summary current
- 10:2610:26, 16 October 2013 diff hist 0 N File:Main Page 2 Oct 16, 2013.jpg No edit summary current
- 10:2610:26, 16 October 2013 diff hist 0 N File:Main Page Oct 16, 2013.jpg No edit summary current
- 10:2610:26, 16 October 2013 diff hist +462 m Main Page new photos
15 October 2013
- 12:4512:45, 15 October 2013 diff hist 0 m Main Page No edit summary
- 12:3212:32, 15 October 2013 diff hist −2 m 751.50 Standard Detailing Notes →H3a. Type C & D: Per Bridge, minor correction
- 10:2110:21, 15 October 2013 diff hist 0 N File:751.22.3.8 camber 2013.jpg No edit summary current
- 10:2010:20, 15 October 2013 diff hist +5 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per Bridge, updated figure with a minor clarification
- 07:1107:11, 15 October 2013 diff hist 0 m 751.50 Standard Detailing Notes →H3a. Type C & D: Per Bridge, minor corrections
- 07:0707:07, 15 October 2013 diff hist +35 m LPA:136.13 LPA Policy Changes Clarification, per LPA, of most recent change
11 October 2013
- 15:2115:21, 11 October 2013 diff hist +215 m LPA:136.13 LPA Policy Changes EPG 136.3
- 15:1915:19, 11 October 2013 diff hist −1 m LPA:136.3 Federal Aid Basics Per LPA, moved EPG 136.15.1 Progress Invoice to EPG 136.3.7.3, per a federal request. There was no change in policy.
- 15:1515:15, 11 October 2013 diff hist −2 m LPA:136.4 Consultant Selection and Consultant Contract Management updated link
- 14:3014:30, 11 October 2013 diff hist +1 m Main Page No edit summary
- 13:4113:41, 11 October 2013 diff hist 0 N File:Main Page 2 Oct 11, 2013.jpg No edit summary current
- 13:4113:41, 11 October 2013 diff hist 0 N File:Main Page Oct 11 2013.jpg No edit summary current
- 13:4013:40, 11 October 2013 diff hist −652 m Main Page EPG 616.18, EPG 751.22.3.8, EPG 101
- 12:5712:57, 11 October 2013 diff hist +383 m 237.1 Plan Details added link
- 12:5512:55, 11 October 2013 diff hist +383 m 903.10 Specific Service Signs (MUTCD Chapter 2J) →903.11.3 Logos and Logo Sign Panels (MUTCD Section 2J.03): added link
- 12:4112:41, 11 October 2013 diff hist +4,825 m 616.23 Construction Inspection Guidelines for Sec 616 Per CM and Traffic, guidance in line with existing practice added on how to perform temporary or permanent relocation of Logo signs.
- 12:2112:21, 11 October 2013 diff hist −62 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps
- 12:1812:18, 11 October 2013 diff hist 0 N File:751.22.3.8 haunch.jpg No edit summary current
- 12:1712:17, 11 October 2013 diff hist 0 N File:751.22.3.8 camber.jpg No edit summary current
- 12:1712:17, 11 October 2013 diff hist +114 m 751.22 Prestressed Concrete I Girders →751.22.3.8 Camber, Haunching and Girder Steps: Per Bridge, at the request of AGC, limits for prestressed girder haunching will be reported to the nearest 1/8”. We currently use 1/16”.
- 11:1711:17, 11 October 2013 diff hist 0 N File:Equipment Verification Samples.docx No edit summary
- 11:1711:17, 11 October 2013 diff hist +131 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, new QRG, Equipment Verification Samples
- 10:1910:19, 11 October 2013 diff hist +49 m Category:910 Intelligent Transportation Systems →910.2 How ITS Works: added photo
- 10:1610:16, 11 October 2013 diff hist 0 N File:910.2 motorist assist.jpg No edit summary current
10 October 2013
- 13:3013:30, 10 October 2013 diff hist +88 m Main Page No edit summary
- 13:2613:26, 10 October 2013 diff hist −9 m Main Page No edit summary
- 12:0312:03, 10 October 2013 diff hist +116 m Category:1001 General Requirements for Material →1001.8 Sample Identification: Per CM, updated link and archaic references
- 11:2211:22, 10 October 2013 diff hist −13 m Category:900 TRAFFIC CONTROL →900.2.2 Report: Per CM, updated link
- 11:2111:21, 10 October 2013 diff hist −3 m Category:502 Portland Cement Concrete Base and Pavement →502.2.5 Report (Records): Per Cm, updated link
- 11:2011:20, 10 October 2013 diff hist +2 m Category:403 Asphaltic Concrete Pavement →403.3.2 Sample Record: Per CM, updated links
- 11:2011:20, 10 October 2013 diff hist −3 m Category:702 Load-Bearing Piles →702.2.2 Sample Record: Per Cm, updated link
- 11:1911:19, 10 October 2013 diff hist −10 m 1070.3 Laboratory Testing Guidelines for Sec 1070 →1070.3.3 Sample Record: Per Cm, updated link
- 11:1811:18, 10 October 2013 diff hist −3 m Category:610 Masonry Construction Laboratory Testing Guidelines →Sample Record: Per CM, updated link