User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 12:12, 4 November 2013 diff hist +8 m LPA:136.11 Local Public Agency Construction Per LPA, updated figure to include "land disturbance permit" as part of the pre-construction conference topics.
- 11:47, 4 November 2013 diff hist +14 m Category:129 Public Involvement updated info
- 10:56, 4 November 2013 diff hist 0 N File:Main Page Nov 4, 2013.jpg current
- 10:55, 4 November 2013 diff hist -48 m Main Page EPG 910.3
- 09:44, 4 November 2013 diff hist +5,183 m 910.3 Dynamic Message Signs (DMS) →910.3.2.13 Weather Messages: Per Traffic, additional guidance for Dynamic Message signs to reflect current practice
- 08:52, 4 November 2013 diff hist +29 m 751.22 Prestressed Concrete I Girders →751.22.3.9 Open Intermediate Bent Diaphragms
- 08:45, 4 November 2013 diff hist 0 N File:751.22.3.14 NU.jpg current
- 08:44, 4 November 2013 diff hist 0 N File:751.22.3.14 Part Elev.jpg current
- 08:44, 4 November 2013 diff hist -16 m 751.22 Prestressed Concrete I Girders →751.22.3.12 Non-integral Intermediate Bent Diaphragms
- 08:42, 4 November 2013 diff hist +1 m 751.22 Prestressed Concrete I Girders →751.22.3.12 Non-integral Intermediate Bent Diaphragms
- 08:40, 4 November 2013 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.12 Non-integral Intermediate Bent Diaphragms
- 08:39, 4 November 2013 diff hist 0 N File:751.3.12 Dimensions Part Sec AA.jpg current
- 08:38, 4 November 2013 diff hist 0 N File:751.22.3.12 Dimensions Part Plan.jpg current
- 08:38, 4 November 2013 diff hist 0 N File:751.22.3.12 Dimensions Part Elev.jpg current
- 08:31, 4 November 2013 diff hist -15 m 751.22 Prestressed Concrete I Girders →751.22.3.11 Non-integral End Bent Diaphragms
- 08:26, 4 November 2013 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3.11 Non-integral End Bent Diaphragms
- 08:25, 4 November 2013 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.11 Non-integral End Bent Diaphragms
- 08:23, 4 November 2013 diff hist 0 N File:751.22.3.11 Non Int with Expansion Part Sec AA.jpg current
- 08:21, 4 November 2013 diff hist 0 N File:751.22.3.11 Non Int with Expansion Part Plan.jpg current
- 08:20, 4 November 2013 diff hist 0 N File:751.22.3.11 Coil Tie Rod Part Elev.jpg current
- 08:13, 4 November 2013 diff hist 0 m 751.22 Prestressed Concrete I Girders →751.22.3.11 Non-integral End Bent Diaphragms
- 08:11, 4 November 2013 diff hist 0 N File:751.22.3.11 Non Int Dimensions Part Sec AA.jpg current
- 08:06, 4 November 2013 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.11 Non-integral End Bent Diaphragms
- 08:04, 4 November 2013 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.9 Open Intermediate Bent Diaphragms
- 15:16, 1 November 2013 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.11 Non-integral End Bent Diaphragms
- 15:14, 1 November 2013 diff hist 0 N File:751.22.3.11 Non Int Dimensions Part Plan.jpg current
- 15:13, 1 November 2013 diff hist 0 N File:751.22.3.11 Non Int Dimensions Part Elev.jpg current
- 14:58, 1 November 2013 diff hist 0 File:751.22.3.9 Open Int Dimensions Part Plan.jpg uploaded a new version of "Image:751.22.3.9 Open Int Dimensions Part Plan.jpg" current
- 14:47, 1 November 2013 diff hist 0 N File:751.22.3.9 Coil Tie NU.jpg current
- 14:46, 1 November 2013 diff hist 0 N File:751.22.3.9 Coil Tie Rod Part Elev.jpg current
- 14:45, 1 November 2013 diff hist 0 File:751.22.3.9 Open Int Dimensions Part Plan.jpg uploaded a new version of "Image:751.22.3.9 Open Int Dimensions Part Plan.jpg"
- 14:39, 1 November 2013 diff hist 0 N File:751.22.3.9 Open Int Dimensions Part Sec AA.jpg current
- 14:39, 1 November 2013 diff hist +6 m 751.22 Prestressed Concrete I Girders →751.22.3.9 Open Intermediate Bent Diaphragms
- 14:36, 1 November 2013 diff hist 0 N File:751.22.3.9 Open Int Dimensions Part Plan.jpg
- 14:33, 1 November 2013 diff hist 0 File:751.22.3.9 Open Int Dimensions Part Elev.jpg uploaded a new version of "Image:751.22.3.9 Open Int Dimensions Part Elev.jpg" current
- 14:32, 1 November 2013 diff hist 0 File:751.22.3.9 Open Int Dimensions Part Elev.jpg uploaded a new version of "Image:751.22.3.9 Open Int Dimensions Part Elev.jpg"
- 14:30, 1 November 2013 diff hist 0 N File:751.22.3.9 Open Int Dimensions Part Elev.jpg
- 14:24, 1 November 2013 diff hist +761 m 751.22 Prestressed Concrete I Girders →751.22.3 Details: Per Bridge, minor revisions to many figures; expansion of NU dimensions
- 07:14, 1 November 2013 diff hist -352 m Category:625 Slab Stabilization →625.1.1 Project Scoping and Design: Per CM, guidance revised to reflect new TM-64
- 08:46, 31 October 2013 diff hist 0 N File:Main Page Oct 31, 2013.jpg current
- 08:45, 31 October 2013 diff hist -7 m Main Page EPG 616.23, EPG 303
- 08:09, 31 October 2013 diff hist 0 N File:612.xlsx current
- 08:08, 31 October 2013 diff hist 0 m Category:612 Impact Attenuators →612.1 Protective Vehicles (MUTCD "Shadow Vehicle")
- 08:08, 31 October 2013 diff hist +4,209 Category:612 Impact Attenuators →612.1 Protective Vehicles (MUTCD "Shadow Vehicle"): added table of pros and cons
- 07:24, 31 October 2013 diff hist +43 m Category:612 Impact Attenuators →612.1.5 MoDOT Protective Vehicle/TMA Operator’s Training: added link
- 07:17, 31 October 2013 diff hist +19 Other Aspects of Pavement Design →Plans and Estimates for Projects with Optional Pavements: Per CM, 12" rock base option brings guidance into compliance with current practice on particle dimensions, material placement, etc.
- 07:12, 31 October 2013 diff hist +2 Category:605 Underdrainage →605.1.3 Location and Use of Underdrains: Per CM, 12" rock base option provided to bring guidance into compliance with current practice on particle dimensions, material placement, etc
- 07:11, 31 October 2013 diff hist +1 Category:350 Design for Bases and Aggregate Surfaces →350.2 Rock Base: Per CM, 12" rock base option provided to bring guidance into compliance with current practice on particle dimensions, material placement, etc
- 07:10, 31 October 2013 diff hist +84 Category:303 Rock Base →303.1 Construction Inspection for Sec 303: Per CM, 12" rock base option provided to bring guidance into compliance with current practice on particle dimensions, material placement, etc
- 07:06, 31 October 2013 diff hist +7 Category:109 Measurement and Payment →109.14 Price Adjustment for Fuel (for Sec 109.14): Per CM, 12" rock base option provided to bring guidance into compliance with current practice