User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 16:10, 9 December 2013 diff hist +101 m Main Page
- 13:52, 9 December 2013 diff hist +12 m Category:127 MoDOT and the Environment Per Environm'l, minor clarifications
- 10:07, 9 December 2013 diff hist 0 N File:806 Land Disturbance Inspection.pdf
- 10:07, 9 December 2013 diff hist +119 m Category:806 Pollution, Erosion and Sediment Control Per Environm'l, added Land Disturbance Inspection form as a pdf
- 09:09, 9 December 2013 diff hist 0 N File:Main Page 2 Dec 9, 2013.jpg current
- 09:09, 9 December 2013 diff hist 0 N File:Main Page Dec 9, 2013.jpg current
- 09:09, 9 December 2013 diff hist -278 m Main Page new photos
- 14:37, 6 December 2013 diff hist 0 N File:Main Page 2 Dec 6, 2013.jpg current
- 14:37, 6 December 2013 diff hist -251 m Main Page newphoto
- 11:57, 6 December 2013 diff hist 0 N File:Main Page Dec 6, 2013.jpg current
- 11:56, 6 December 2013 diff hist -2 m Main Page new photo
- 08:26, 6 December 2013 diff hist +86 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) updated link
- 15:57, 5 December 2013 diff hist -321 m Main Page EPG 101
- 15:53, 5 December 2013 diff hist +1 m Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): Per CM, updated Milestones QRG
- 15:53, 5 December 2013 diff hist +1 m Category:108 Prosecution and Progress →108.8 Liquidated Damages for Failure or Delay in Completing Work on Time: Per CM, updated Milestones QRG
- 15:53, 5 December 2013 diff hist 0 N File:Milestones.docx
- 15:52, 5 December 2013 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Milestones QRG
- 15:47, 5 December 2013 diff hist 0 N File:147 asphalt pavement repair Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 bridge Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 concrete pavement repair Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 fence Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 guard cable Dec 5, 2013.doc current
- 15:46, 5 December 2013 diff hist 0 N File:147 guardrail Dec 5, 2013.doc current
- 15:45, 5 December 2013 diff hist +34 m 147.3 Job Order Contracting (JOC) Per Bidding & Contracts, minor corrections in JSPs
- 13:34, 5 December 2013 diff hist 0 N File:Main Page 2 Dec 5, 2013.jpg current
- 13:34, 5 December 2013 diff hist 0 N File:Main Page Dec 5, 2013.jpg current
- 13:34, 5 December 2013 diff hist +53 m Main Page new photos
- 09:25, 5 December 2013 diff hist -189 m Main Page EPG 133.4.6
- 09:23, 5 December 2013 diff hist +1 m 133.4 Snow and Ice Control Operations →133.4.6 Statewide Winter Road Condition Report: Per Maintenance, clarification of road condition terminology
- 09:13, 5 December 2013 diff hist +140 m 751.1 Preliminary Design →751.1.2.21 Types of Piling: Per Bridge, added link and clarification
- 09:12, 5 December 2013 diff hist -30 751.0 State Map
- 09:11, 5 December 2013 diff hist 0 m 751.0 State Map →751.0.1 State Outline Map – County Code and District Numbers
- 14:08, 4 December 2013 diff hist 0 N File:Main Page 2 Dec 4, 2013.jpg current
- 14:08, 4 December 2013 diff hist 0 N File:Main Page Dec 4, 2013.jpg current
- 14:07, 4 December 2013 diff hist -274 m Main Page
- 14:15, 3 December 2013 diff hist -54 m Main Page EPG 147.3
- 14:10, 3 December 2013 diff hist 0 N File:147 guard cable Dec 2013.doc current
- 14:10, 3 December 2013 diff hist 0 N File:147 guardrail Dec 2013.doc current
- 14:09, 3 December 2013 diff hist +191 m 147.3 Job Order Contracting (JOC) Per Design, brought back updated Guardrail and Guard Cable JSPs.
- 11:25, 3 December 2013 diff hist +34 m Main Page EPG 643.2
- 11:04, 3 December 2013 diff hist -1,500 m 643.2 Local Utility Adjustments - Public and Private Per Design, pre-audits are no longer conducted for consultant or utility contracts. Also, other minor clarifications.
- 10:28, 3 December 2013 diff hist +2 m 616.25 MoDOT Work Zone Guidelines →District Work Zone Coordinators
- 15:38, 2 December 2013 diff hist -67 m Main Page EPG 701
- 15:35, 2 December 2013 diff hist +135 m Category:701 Drilled Shafts Per Bridge, clarified useage of limestone and other rock. Compressive strengths were identified.
- 15:21, 2 December 2013 diff hist +3 m 751.50 Standard Detailing Notes →E2. Foundation Data Table
- 15:20, 2 December 2013 diff hist 0 N File:750 E2.1.jpg current
- 15:19, 2 December 2013 diff hist -2,258 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge, switched from a table to a picture of a Microstation drawing so that format in EPG matches that of the CEL file.
- 15:16, 2 December 2013 diff hist +124 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge,E2.1: Correcting format to match office practice, adding abbreviations of driving verification methods and updating terminology from "shale" to "weak rock".
- 11:00, 2 December 2013 diff hist +1 m Category:941 Permits and Access Requests →941.2.2 Evluation Guidelines and Considerations
- 10:13, 2 December 2013 diff hist 0 m 616.8 Typical Applications (MUTCD 6H) →Listing of Typical Applications