User contributions for Smithk
Jump to navigation
Jump to search
10 December 2013
- 10:2210:22, 10 December 2013 diff hist −83 m 751.4 Reinforced Concrete Design Properties →751.4.1 Reinforced Concrete: Per Bridge, corrected the usage of Class B and Class B-1 concrete for intermediate bents.
- 09:5609:56, 10 December 2013 diff hist +377 m 616.20 Work Zone Safety and Mobility Policy updated links
- 09:4909:49, 10 December 2013 diff hist 0 N File:616.14.3 2013.jpg No edit summary current
- 09:4909:49, 10 December 2013 diff hist +5 m 616.20 Work Zone Safety and Mobility Policy →616.14.2 Fundamental Principles: new photo
- 08:5908:59, 10 December 2013 diff hist 0 N File:806 Land Disturbance Inspection 2013.pdf No edit summary
- 08:5908:59, 10 December 2013 diff hist +5 m Category:806 Pollution, Erosion and Sediment Control Per Environmental, updated pdf of the Land Disturbance Inspection Record form
9 December 2013
- 16:1016:10, 9 December 2013 diff hist +101 m Main Page No edit summary
- 13:5213:52, 9 December 2013 diff hist +12 m Category:127 MoDOT and the Environment Per Environm'l, minor clarifications
- 10:0710:07, 9 December 2013 diff hist 0 N File:806 Land Disturbance Inspection.pdf No edit summary
- 10:0710:07, 9 December 2013 diff hist +119 m Category:806 Pollution, Erosion and Sediment Control Per Environm'l, added Land Disturbance Inspection form as a pdf
- 09:0909:09, 9 December 2013 diff hist 0 N File:Main Page 2 Dec 9, 2013.jpg No edit summary current
- 09:0909:09, 9 December 2013 diff hist 0 N File:Main Page Dec 9, 2013.jpg No edit summary current
- 09:0909:09, 9 December 2013 diff hist −278 m Main Page new photos
6 December 2013
- 14:3714:37, 6 December 2013 diff hist 0 N File:Main Page 2 Dec 6, 2013.jpg No edit summary current
- 14:3714:37, 6 December 2013 diff hist −251 m Main Page newphoto
- 11:5711:57, 6 December 2013 diff hist 0 N File:Main Page Dec 6, 2013.jpg No edit summary current
- 11:5611:56, 6 December 2013 diff hist −2 m Main Page new photo
- 08:2608:26, 6 December 2013 diff hist +86 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) updated link
5 December 2013
- 15:5715:57, 5 December 2013 diff hist −321 m Main Page EPG 101
- 15:5315:53, 5 December 2013 diff hist +1 m Category:109 Measurement and Payment →109.1 Measurement of Quantities (for Sec 109.1): Per CM, updated Milestones QRG
- 15:5315:53, 5 December 2013 diff hist +1 m Category:108 Prosecution and Progress →108.8 Liquidated Damages for Failure or Delay in Completing Work on Time: Per CM, updated Milestones QRG
- 15:5315:53, 5 December 2013 diff hist 0 N File:Milestones.docx No edit summary
- 15:5215:52, 5 December 2013 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Milestones QRG
- 15:4715:47, 5 December 2013 diff hist 0 N File:147 asphalt pavement repair Dec 5, 2013.doc No edit summary current
- 15:4615:46, 5 December 2013 diff hist 0 N File:147 bridge Dec 5, 2013.doc No edit summary current
- 15:4615:46, 5 December 2013 diff hist 0 N File:147 concrete pavement repair Dec 5, 2013.doc No edit summary current
- 15:4615:46, 5 December 2013 diff hist 0 N File:147 fence Dec 5, 2013.doc No edit summary current
- 15:4615:46, 5 December 2013 diff hist 0 N File:147 guard cable Dec 5, 2013.doc No edit summary current
- 15:4615:46, 5 December 2013 diff hist 0 N File:147 guardrail Dec 5, 2013.doc No edit summary current
- 15:4515:45, 5 December 2013 diff hist +34 m 147.3 Job Order Contracting (JOC) Per Bidding & Contracts, minor corrections in JSPs
- 13:3413:34, 5 December 2013 diff hist 0 N File:Main Page 2 Dec 5, 2013.jpg No edit summary current
- 13:3413:34, 5 December 2013 diff hist 0 N File:Main Page Dec 5, 2013.jpg No edit summary current
- 13:3413:34, 5 December 2013 diff hist +53 m Main Page new photos
- 09:2509:25, 5 December 2013 diff hist −189 m Main Page EPG 133.4.6
- 09:2309:23, 5 December 2013 diff hist +1 m 133.4 Snow and Ice Control Operations →133.4.6 Statewide Winter Road Condition Report: Per Maintenance, clarification of road condition terminology
- 09:1309:13, 5 December 2013 diff hist +140 m 751.1 Preliminary Design →751.1.2.21 Types of Piling: Per Bridge, added link and clarification
- 09:1209:12, 5 December 2013 diff hist −30 751.0 State Map No edit summary
- 09:1109:11, 5 December 2013 diff hist 0 m 751.0 State Map →751.0.1 State Outline Map – County Code and District Numbers
4 December 2013
- 14:0814:08, 4 December 2013 diff hist 0 N File:Main Page 2 Dec 4, 2013.jpg No edit summary current
- 14:0814:08, 4 December 2013 diff hist 0 N File:Main Page Dec 4, 2013.jpg No edit summary current
- 14:0714:07, 4 December 2013 diff hist −274 m Main Page No edit summary
3 December 2013
- 14:1514:15, 3 December 2013 diff hist −54 m Main Page EPG 147.3
- 14:1014:10, 3 December 2013 diff hist 0 N File:147 guard cable Dec 2013.doc No edit summary current
- 14:1014:10, 3 December 2013 diff hist 0 N File:147 guardrail Dec 2013.doc No edit summary current
- 14:0914:09, 3 December 2013 diff hist +191 m 147.3 Job Order Contracting (JOC) Per Design, brought back updated Guardrail and Guard Cable JSPs.
- 11:2511:25, 3 December 2013 diff hist +34 m Main Page EPG 643.2
- 11:0411:04, 3 December 2013 diff hist −1,500 m 643.2 Utilities in Program Delivery Per Design, pre-audits are no longer conducted for consultant or utility contracts. Also, other minor clarifications.
- 10:2810:28, 3 December 2013 diff hist +2 m 616.29 MoDOT Work Zone Guidelines →District Work Zone Coordinators
2 December 2013
- 15:3815:38, 2 December 2013 diff hist −67 m Main Page EPG 701
- 15:3515:35, 2 December 2013 diff hist +135 m Category:701 Drilled Shafts Per Bridge, clarified useage of limestone and other rock. Compressive strengths were identified.