User contributions for Smithk
Jump to navigation
Jump to search
27 February 2014
- 13:5713:57, 27 February 2014 diff hist +84 m Main Page Two QRGs
- 13:5213:52, 27 February 2014 diff hist −8 m Category:109 Measurement and Payment Per CM, updated “Change Orders–Mobiliz'n & Contract Bond” for contracts w/ multiple projects;clarified “Change Orders” for adding contingency items from JSP/spec changes
- 13:5013:50, 27 February 2014 diff hist 0 N File:Change Orders – Mobilization and Contract Bond 2014.docx No edit summary
- 13:5013:50, 27 February 2014 diff hist 0 N File:Change Orders 2014.docx No edit summary
- 13:4913:49, 27 February 2014 diff hist −4 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated “Change Orders–Mobiliz'n & Contract Bond” for contracts w/ multiple projects;clarified “Change Orders” for adding contingency items
- 12:0212:02, 27 February 2014 diff hist +6 m Main Page No edit summary
- 12:0112:01, 27 February 2014 diff hist 0 N File:Main Page Feb 27a, 2014.jpg No edit summary current
- 12:0112:01, 27 February 2014 diff hist +110 m Main Page new photo
- 10:5210:52, 27 February 2014 diff hist 0 N File:Main Page Feb 27, 2014.jpg No edit summary current
- 10:5110:51, 27 February 2014 diff hist +637 m Main Page EPG 616.27
- 10:3010:30, 27 February 2014 diff hist +74 m Category:616 Temporary Traffic Control (MUTCD Part 6) added link
- 10:2810:28, 27 February 2014 diff hist 0 N File:616.27 aerial.jpg No edit summary current
- 10:2710:27, 27 February 2014 diff hist 0 N File:616.27.1.4 3.jpg No edit summary current
- 10:2710:27, 27 February 2014 diff hist 0 N File:616.27.1.4 2.jpg No edit summary current
- 10:2710:27, 27 February 2014 diff hist 0 N File:616.27.1.4 1.jpg No edit summary current
- 10:2710:27, 27 February 2014 diff hist 0 N File:616.27.1.3 3 how.jpg No edit summary current
- 10:2610:26, 27 February 2014 diff hist 0 N File:616.27.1.3 3.jpg No edit summary current
- 10:2610:26, 27 February 2014 diff hist 0 N File:616.27.1.3 2 how.jpg No edit summary current
- 10:2610:26, 27 February 2014 diff hist 0 N File:616.27.1.3 2.jpg No edit summary current
- 10:2610:26, 27 February 2014 diff hist 0 N File:616.27.1.3 1 how.jpg No edit summary current
- 10:2510:25, 27 February 2014 diff hist 0 N File:616.27.1.3 1.jpg No edit summary current
- 10:2310:23, 27 February 2014 diff hist 0 N File:616.27.1 conspicuity.jpg No edit summary current
- 10:2310:23, 27 February 2014 diff hist 0 N File:616.27.1 5.jpg No edit summary current
- 10:2210:22, 27 February 2014 diff hist 0 N File:616.27.1 4.jpg No edit summary current
- 10:2210:22, 27 February 2014 diff hist 0 N File:616.27.1 3.jpg No edit summary current
- 10:2210:22, 27 February 2014 diff hist 0 N File:616.27.1 2.jpg No edit summary current
- 10:2110:21, 27 February 2014 diff hist 0 N File:616.27.1 1.jpg No edit summary current
- 10:2110:21, 27 February 2014 diff hist 0 N File:616.27 Fleet Lighting Guidelines.pdf No edit summary current
- 10:2010:20, 27 February 2014 diff hist +18,087 Nm 616.31 MoDOT Fleet Lighting Per General Services and Traffic, current Fleet Lighting guidelines (previously available on the intranet) are now available in this new article.
26 February 2014
- 09:5909:59, 26 February 2014 diff hist +10 m Category:903 Highway Signing (MUTCD Part 2) Per Traffic, updated Signpost Selection Guide with minor clarifications
- 09:5709:57, 26 February 2014 diff hist 0 N File:903.2a Signpost Selection Guide 2014.xls No edit summary current
- 09:5709:57, 26 February 2014 diff hist +50 m 903.3 Ground-Mounted Sign Supports Per Traffic, updated Signpost Selection Guide with minor clarifications
- 09:1309:13, 26 February 2014 diff hist −123 m Main Page EPG 751.6
- 08:4608:46, 26 February 2014 diff hist +209 m 751.6 General Quantities →751.6.1 Index of Quantities: Per Bridge, new guidance to clarify accuracy and rounding of estimated quantities.
25 February 2014
- 15:3515:35, 25 February 2014 diff hist −52 m Main Page EPG 134.4
- 15:2015:20, 25 February 2014 diff hist −66 m Category:134 Engineering Professional Services →134.4 Contract Approval, Execution and Distribution: Per Design, removed the requirement to send executed contracts to Audits Div.
24 February 2014
- 15:4015:40, 24 February 2014 diff hist −204 m Main Page EPG 134.5.1
- 15:2115:21, 24 February 2014 diff hist 0 N File:134.2.4 2014.doc No edit summary current
- 15:2115:21, 24 February 2014 diff hist 0 N File:134.2.2 2014.doc No edit summary current
- 15:2115:21, 24 February 2014 diff hist +719 m Category:134 Engineering Professional Services Per Design, revised EPG 134.5.1 to include more info on invoicing. Forms 134.2.2 and 134.2.4 were also updated.
- 14:5714:57, 24 February 2014 diff hist +901 m LPA:136.13 LPA Policy Changes EPG 136.4
- 14:5014:50, 24 February 2014 diff hist +87 m LPA:136.12 Figures, Glossary and Other Useful Links New Fig. 136.4.19
- 14:4814:48, 24 February 2014 diff hist 0 N File:136.4.19.docx No edit summary current
- 14:4714:47, 24 February 2014 diff hist +7,265 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, added guidance for the new on-call consultant list
21 February 2014
- 15:1715:17, 21 February 2014 diff hist 0 N File:Main Page Feb 21, 2014.jpg No edit summary current
- 15:1615:16, 21 February 2014 diff hist −586 m Main Page EPG 751.12.5
- 14:4014:40, 21 February 2014 diff hist +40 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail (TL-4 [NCHRP 350]): inserted link
- 14:3514:35, 21 February 2014 diff hist +1,663 m 751.12 Barriers, Railings, Curbs and Fences →751.12.5 Two Tube Rail: Per Bridge, new two-tube bridge rail guidance. This type of bridge rail was used on Safe and Sound bridge program and is now available for regular use.
- 14:1814:18, 21 February 2014 diff hist +35 m Category:606 Guardrail and Guard Cable inserted link
20 February 2014
- 16:0916:09, 20 February 2014 diff hist +1 m Main Page No edit summary