User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 13:57, 1 April 2014 diff hist 0 N File:106.3.2.59.3.2 navigate 2014.jpg current
- 13:57, 1 April 2014 diff hist 0 N File:106.3.2.59.3.2 analyze 2014.jpg current
- 13:56, 1 April 2014 diff hist 0 N File:106.3.2.59.3.2 smoothness 2014.jpg current
- 13:56, 1 April 2014 diff hist 0 N File:106.3.2.59.3.1.2 report.jpg current
- 13:56, 1 April 2014 diff hist 0 N File:106.3.2.59.3.1.2 reverse.jpg current
- 13:55, 1 April 2014 diff hist 0 N File:106.3.2.59.3.1.1.jpg current
- 13:55, 1 April 2014 diff hist 0 N File:106.3.2.59.3 bonus.jpg current
- 13:55, 1 April 2014 diff hist 0 N File:106.3.2.59.3 associated segments 2014.jpg current
- 13:55, 1 April 2014 diff hist 0 N File:106.3.2.59.3 ride quality 2014.jpg current
- 13:54, 1 April 2014 diff hist 0 N File:106.3.2.59.3 leave out areas.jpg current
- 13:54, 1 April 2014 diff hist 0 N File:106.3.2.59.3 navigate 2014.jpg current
- 13:54, 1 April 2014 diff hist 0 N File:106.3.2.59.3 IP file.jpg current
- 13:54, 1 April 2014 diff hist 0 N File:106.3.2.59.3 editor.jpg current
- 13:53, 1 April 2014 diff hist 0 N File:106.3.2.59.3 IRI summary 2014.jpg current
- 13:53, 1 April 2014 diff hist 0 N File:106.3.2.59.3 spreadsheet.jpg current
- 13:53, 1 April 2014 diff hist 0 N File:106.3.2.59.3 Excel.jpg current
- 13:53, 1 April 2014 diff hist 0 N File:106.3.2.59.3 average IRI.jpg current
- 13:52, 1 April 2014 diff hist 0 N File:106.3.2.59.3 analyze 2014.jpg current
- 13:52, 1 April 2014 diff hist 0 N File:106.3.2.59.3 LElev 2014.jpg current
- 13:52, 1 April 2014 diff hist 0 N File:106.3.2.59.3 ride 2014.jpg current
- 13:51, 1 April 2014 diff hist 0 N File:106.3.2.59.3 left right 2014.jpg current
- 13:51, 1 April 2014 diff hist 0 N File:106.3.2.59.3 add files 2014.jpg current
- 13:51, 1 April 2014 diff hist 0 N File:106.3.2.59.3 new 2014.jpg current
- 13:50, 1 April 2014 diff hist +1,440 m 106.3.2.59 TM-59, Determination of the International Roughness Index Per CM, revised data processing guidance and screen shots to reflect the latest version of ProVAL.
- 13:25, 1 April 2014 diff hist +24 m LPA:136.13 LPA Policy Changes
- 13:24, 1 April 2014 diff hist +270 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.10.1
- 13:22, 1 April 2014 diff hist +98 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.10.1 Federal Wage Rates (23 USC 113 and 29 CFR 5): Per LPA, upated DOL's link and associated information
- 12:56, 1 April 2014 diff hist +59 m Off-Systems Guide Schedule for Federal-Aid Acceptance Sampling and Testing (FAST) Per CM and LPA, slightly revised the concrete testing frequencies for PCC Pavement to permit more frequent testing for smaller projects. Also slightly expanded the description of Concrete Masonry.
- 11:03, 1 April 2014 diff hist 0 m Category:106 Control of Material minor revision
- 10:05, 1 April 2014 diff hist 0 m 642.8 Sidewalk Design Criteria Per EPG, checklist clarified by the removal of an unnecessary point on page 2
- 10:04, 1 April 2014 diff hist 0 m LPA:136.13 LPA Policy Changes Per EPG, checklist clarified by the removal of an unnecessary point on page 2
- 10:04, 1 April 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Per EPG, checklist clarified by the removal of an unnecessary point on page 2
- 10:04, 1 April 2014 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPG, checklist clarified by the removal of an unnecessary point on page 2
- 10:03, 1 April 2014 diff hist 0 N File:136.9.4 Apr 2014.doc
- 10:02, 1 April 2014 diff hist 0 m Main Page ADA Checklist
- 07:22, 1 April 2014 diff hist 0 N File:Main Page Apr 1, 2014.jpg current
- 07:20, 1 April 2014 diff hist +248 m Main Page new photo
- 15:26, 31 March 2014 diff hist +40 m Main Page EPG 642.1
- 14:28, 31 March 2014 diff hist +289 m LPA:136.13 LPA Policy Changes Fig. 136.9.4
- 14:25, 31 March 2014 diff hist +4 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.4
- 14:24, 31 March 2014 diff hist +8 m LPA:136.9 Plans, Specs and Estimates (PSE) Per EPG, 2 items were clarified; 2 more items removed to better align with Access Board’s PROWAG info. PROWAG references added to assist in finding further information on the US Access Bd. website
- 14:23, 31 March 2014 diff hist 0 N File:136.9.4 Mar 2014.doc
- 14:23, 31 March 2014 diff hist -1 m 642.8 Sidewalk Design Criteria Per EPG, 2 items were clarified; 2 more items removed to better align with Access Board’s PROWAG info. PROWAG references added to assist in finding further information on the US Access Bd. website
- 13:21, 31 March 2014 diff hist -198 m 616.19 Quality Standards for Temporary Traffic Control Devices →616.19.2.9 Flagging Operations and Worker Apparel: per Traffic, updated links
- 11:21, 28 March 2014 diff hist -257 m Main Page EPG 106.3.2.74
- 11:16, 28 March 2014 diff hist +44 m 106.3.2.74 TM-74, Pullout Tests on Epoxy Bonding Agents for Resin Anchor Systems Per Phys. Lab, deleted archaic reference to min. load of 9K lbs. & allows different embedment lengths for bars/rods other than a #5. The latter is included as larger bar sizes need more embedment.
- 09:04, 28 March 2014 diff hist 0 m Main Page
- 08:58, 28 March 2014 diff hist -98 m Main Page EPG 139 and EPG 149
- 08:45, 28 March 2014 diff hist 0 N File:149 Flowchart.pdf current
- 08:44, 28 March 2014 diff hist 0 N File:149 Worksheet.xlsx current