User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:15, 10 June 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) 2014.docx
- 07:14, 10 June 2014 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Digital Signature for Adobe Pro 10 (Contractors)
- 15:13, 9 June 2014 diff hist 0 N File:748.3.5.4 Vertical.jpg current
- 15:12, 9 June 2014 diff hist 0 N File:748.3.5.4 Continuous.jpg current
- 15:12, 9 June 2014 diff hist +2,346 m 748.3 Freeboard Per Bridge, re-titled and reorganized article for clarity. Provided definitions and guidance to determine limits of freeboard for bridges on steep grades or vertical curve.
- 14:49, 9 June 2014 diff hist 0 m 748.3 Freeboard 748.3 Bridge Freeboard moved to 748.3 Freeboard: Bridge freeboard is only one type of freeboard. Re-titled to reflect this fact.
- 14:49, 9 June 2014 diff hist +29 N 748.3 Bridge Freeboard 748.3 Bridge Freeboard moved to 748.3 Freeboard: Bridge freeboard is only one type of freeboard. Re-titled to reflect this fact. current
- 14:44, 9 June 2014 diff hist +429 m 748.2 Roadway Design Criteria Per Bridge, reorganized and re-titled article for greater clarity. Terminology clarified.
- 14:35, 9 June 2014 diff hist +43 N 748.2 Roadway Overtopping 748.2 Roadway Overtopping moved to 748.2 Roadway Design Criteria: Confusion of "Roadway Overtopping" and "Overtopping Flood" was addressed current
- 14:35, 9 June 2014 diff hist 0 m 748.2 Roadway Design Criteria 748.2 Roadway Overtopping moved to 748.2 Roadway Design Criteria: Confusion of "Roadway Overtopping" and "Overtopping Flood" was addressed
- 14:30, 9 June 2014 diff hist -2 m Category:748 Hydraulics and Drainage current
- 14:29, 9 June 2014 diff hist -14 m Category:748 Hydraulics and Drainage Per Bridge, minor clarification
- 12:07, 9 June 2014 diff hist +34 m Category:501 Concrete →501.1 Construction Inspection for Sec 501: new photo
- 12:06, 9 June 2014 diff hist 0 N File:501.1.1.jpg current
- 11:20, 9 June 2014 diff hist +70 m 751.40 LFD Widening and Repair →751.40.4.3 Replacement of Existing Rail with Thrie Beam Rail: Per Bridge, clarifications
- 11:12, 9 June 2014 diff hist -1 m 751.10 General Superstructure →751.10.2.2 Precast Prestressed (P/C P/S) Concrete Panel Forms - Details: Per Bridge, minor clarification
- 10:33, 9 June 2014 diff hist -137 m Main Page EPG 131.2
- 10:21, 9 June 2014 diff hist +309 m 131.2 Proprietary Items and Public Interest Findings Per EPG, guidance revised to better reflect the requirements of CFR 635.411
- 09:25, 9 June 2014 diff hist +124 m Main Page EPG 110.1
- 09:10, 9 June 2014 diff hist +742 m Category:110 State and Federal Wage Rates and Other Requirements →110.1 Wage Rates (Guidance for Sec 110.1): Per ECR, additional guidance for acceptable location of the full wage order. Also, description of a spreadsheet of wages inlieu of the full wage order.
- 07:15, 9 June 2014 diff hist +4 m 236.5 Property Management →236.5.25.3 Valuation – Compensation for Leases: Per RW, now authorization is to be provided by RW Director instead of district engineer
- 12:21, 6 June 2014 diff hist 0 N File:Main Page June 7, 2014.jpg current
- 12:21, 6 June 2014 diff hist -434 m Main Page EPG 751.1.3.6
- 11:08, 6 June 2014 diff hist +162 m Category:409 Seal Coat →409.1 Design: Per Bridge, revision to match guidance with current bridge asphalt overlay seal coat policy.
- 11:05, 6 June 2014 diff hist 0 m 770.7 Maintenance of Bridge Superstructure →770.7.4 Bituminous Mat Resurfacing: Per Bridge, revision to match guidance with current bridge asphalt overlay seal coat policy.
- 11:04, 6 June 2014 diff hist +317 m 751.1 Preliminary Design →751.1.3.5 Structural Rehabilitation Checklist: Per Bridge, revision to match guidance with current bridge asphalt overlay seal coat policy.
- 11:02, 6 June 2014 diff hist -4 m 751.6 General Quantities →751.6.2 Computation of Estimated Quantities: Per Bridge, revisions to match guidance with current bridge asphalt overlay seal coat policy.
- 10:51, 6 June 2014 diff hist +11 m Category:712 Structural Steel Construction →712.2.5.2 Surface Preparation: Per CM, updated link to Qualified Protective Coatings for Machine Finished Surfaces
- 09:23, 6 June 2014 diff hist 0 m Category:712 Structural Steel Construction →712.2.5.2 Surface Preparation: Per CM, updated spec links
- 09:09, 6 June 2014 diff hist -7 m Category:105 Control of Work →105.9.17 Subcontract Approval Request: Per CM, updated link to Form C-220
- 15:22, 5 June 2014 diff hist 0 N File:Main Page 2 June 6, 2014.jpg current
- 15:22, 5 June 2014 diff hist 0 N File:Main Page June 6, 2014.jpg current
- 15:21, 5 June 2014 diff hist -194 m Main Page EPG 106.4, EPG 501.1.5
- 15:04, 5 June 2014 diff hist -123 m Category:501 Concrete →501.1.5 Measurement of Material (Sec 501.6): Per CM, guidance clarified to explain QC/QA roles for concrete plant inspections. This is part of the broader QM initiative implemented in past 2 yrs.
- 14:56, 5 June 2014 diff hist -59 m 106.4 Plant Inspections Per CM, guidance revised to explain QC/QA roles for concrete plant inspections. This is a clarification of the broader QM initiative that we’ve been implementing over the past 2 yrs.
- 14:46, 5 June 2014 diff hist 0 N File:941 SSD.pdf current
- 14:46, 5 June 2014 diff hist -128 m Category:941 Permits and Access Requests Per Traffic, replaced SSD chart with Green Book's Exhibit 3-1
- 12:04, 5 June 2014 diff hist -54 m Category:107 Legal Relations and Responsibility to the Public updated link
- 09:56, 5 June 2014 diff hist -9 m Category:470 Bituminous Asphalt Maintenance →470.7.1 Patching Methods: Per EPG, "dangerous" removed to avoid legal exposures
- 09:54, 5 June 2014 diff hist -28 m Category:409 Seal Coat Per EPG, "and dangerous" removed
- 11:12, 4 June 2014 diff hist -1 m Main Page
- 11:11, 4 June 2014 diff hist -20 m Main Page
- 09:24, 4 June 2014 diff hist 0 N File:Main Page June 4, 2014.jpg current
- 09:23, 4 June 2014 diff hist +250 m Main Page Design Exception Info form
- 08:11, 4 June 2014 diff hist -9 m 233.1 At-Grade Intersections - Driveways and Entrances Per EPG, updated Design Exception Info Form to reflect the 13 criteria added to EPG 131.1 in February 2014
- 08:10, 4 June 2014 diff hist -9 m Category:235 Preliminary Plans Per EPG, updated Design Exception Info Form to reflect the 13 criteria added to EPG 131.1 in February 2014
- 08:08, 4 June 2014 diff hist -9 m Category:402 Bituminous Surface Leveling →402.1.2 Mix and Quantities: Per EPG, updated Design Exception Info Form to reflect the 13 criteria added to the article in February 2014
- 08:07, 4 June 2014 diff hist +6 m Category:139 Design - Build
- 08:02, 4 June 2014 diff hist -18 m 751.1 Preliminary Design Per EPG, updated Design Exception Info Form to reflect the 13 criteria added to EPG 131.1 in February 2014
- 08:01, 4 June 2014 diff hist -9 m Category:128 Conceptual Studies Per EPG, updated Design Exception Info Form to reflect the 13 criteria added to EPG 131.1 in February 2014