- 07:17, 13 June 2014 diff hist +82 m Category:150 Quality Management added photos
- 15:27, 11 June 2014 diff hist -4,782 m Category:150 Quality Management →150.1 Required File Structure and Naming Convention for Contractor Quality Management Documents: Per CM, updated EPG 150.1 Project Documentation
- 13:37, 11 June 2014 diff hist +284 m LPA:136.13 LPA Policy Changes EPG 136.6.4.1.1
- 13:34, 11 June 2014 diff hist +64 m LPA:136.6 Environmental and Cultural Requirements →136.6.4.1 Section 106 (Cultural Resource) Compliance: Per Historic Preservation, the promised FHWA website presenting a list of excluded bridges is now available
- 13:16, 11 June 2014 diff hist -4 m 751.1 Preliminary Design →751.1.2.6.3 Layout
- 13:15, 11 June 2014 diff hist -1 m Main Page
- 13:08, 11 June 2014 diff hist 0 N File:Main Page June 11, 2014.jpg current
- 13:07, 11 June 2014 diff hist +1,101 m Main Page EPG 748, EPG 750, EPG 350, EPG 751.1
- 11:08, 11 June 2014 diff hist +1,280 m 751.1 Preliminary Design →751.1.2.6 Box Culverts: Per Bridge, reorganized to make information easier to access. Also update guardrail attachment guidance to current practice.
- 11:05, 11 June 2014 diff hist +30 m 751.8 Concrete Box Culverts →751.8.1.4 Other Dimensions: inserted link
- 10:24, 11 June 2014 diff hist -1 m 750.7 Non-Hydraulic Considerations →750.7.6.4 Floodgates
- 10:23, 11 June 2014 diff hist 0 m 750.7 Non-Hydraulic Considerations →750.7.4.3 Summary of Responsibilities
- 10:22, 11 June 2014 diff hist 0 N File:750.7.3.jpg current
- 10:21, 11 June 2014 diff hist +4,423 m 750.7 Non-Hydraulic Considerations Per Bridge, updated guidance to reflect std plans changes. New table for std box culvert sizes. Abrasion info moved to EPG 750.2. New Guardrail Criteria based on bridge std library & TRB 03-4421
- 07:30, 11 June 2014 diff hist +620 m Category:350 Design for Bases and Aggregate Surfaces Per EPG, clarified guidance about daylighting pavement drainage material
- 07:15, 11 June 2014 diff hist 0 N File:750.4.4.6.jpg current
- 14:47, 10 June 2014 diff hist -45 m 750.2 Culverts updated links
- 14:44, 10 June 2014 diff hist 0 m 127.4 Wetlands and Streams updated link
- 14:44, 10 June 2014 diff hist -128 m 237.4 Plan-Profile Sheets removed archaic reference
- 14:39, 10 June 2014 diff hist 0 m 751.1 Preliminary Design updated link
- 14:36, 10 June 2014 diff hist +3,879 m 750.6 Erosion Control and Energy Dissipation Per Bridge, updated to correspond to latest edition of HEC-15.
- 12:54, 10 June 2014 diff hist +8,295 m 750.4 Storm Sewers Per Bridge, updated to match information provided in the latest edition of HEC-22. current
- 11:24, 10 June 2014 diff hist +141 m 750.3 Bridges Per Bridge, update “Roadway Overtopping Design” to “Roadway Design Frequency” to match changes in EPG 748.2. Added definition for existing conditions.
- 11:09, 10 June 2014 diff hist +981 m 750.2 Culverts Per Bridge, added hydraulic analysis criteria. Updated culvert entrance loss table per FHWA HDS-5; moved bend loss info to EPG 750.2; moved allowable headwater definition and info to EPG 748.4
- 10:30, 10 June 2014 diff hist +43 m 750.3 Bridges →750.3.1.9 List of References: inserted link
- 10:07, 10 June 2014 diff hist -391 m 750.1 Open Channels Per Bridge, update channel liner info to match new edition of HEC-15. Deleted EPG 750.1.7 Grassed Channel Charts.
- 08:28, 10 June 2014 diff hist +577 m Category:749 Hydrologic Analysis →749.2.1 Design Frequency Criteria: Per Bridge, added definition of other design frequency criteria. Added subheadings for greater clarity.
- 08:13, 10 June 2014 diff hist +1,235 m 748.6 High Water Surface Elevation Per Bridge, re-titled article and added definitions
- 08:06, 10 June 2014 diff hist 0 m 748.6 High Water Surface Elevation 748.6 Design High Water moved to 748.6 High Water Surface Elevation: Per Bridge
- 08:06, 10 June 2014 diff hist +48 N 748.6 Design High Water 748.6 Design High Water moved to 748.6 High Water Surface Elevation: Per Bridge current
- 08:03, 10 June 2014 diff hist +209 m 748.5 Matching Existing Structures Per Bridge, added env'l requirements for culverts. Clarified that hydraulic performance isn’t actually matched in most cases, but is used as the design criteria for the new structure. current
- 07:53, 10 June 2014 diff hist -1 m 748.4 Headwater and Backwater →748.4.2 Backwater from Obstruction to Flow
- 07:52, 10 June 2014 diff hist 0 N File:748.4.2.jpg current
- 07:52, 10 June 2014 diff hist 0 N File:748.4.1.jpg current
- 07:49, 10 June 2014 diff hist +1,446 m 748.4 Headwater and Backwater Per Bridge, max. headwater depth is now to be based on a ration of the headwaters to the dia. of the culvert
- 07:30, 10 June 2014 diff hist 0 m 750.3 Bridges updated link
- 07:25, 10 June 2014 diff hist -26 m Main Page QRG Digital Signature for Adobe Pro 10 (Contractors)
- 07:15, 10 June 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) 2014.docx
- 07:14, 10 June 2014 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated QRG Digital Signature for Adobe Pro 10 (Contractors)
- 15:13, 9 June 2014 diff hist 0 N File:748.3.5.4 Vertical.jpg current
- 15:12, 9 June 2014 diff hist 0 N File:748.3.5.4 Continuous.jpg current
- 15:12, 9 June 2014 diff hist +2,346 m 748.3 Freeboard Per Bridge, re-titled and reorganized article for clarity. Provided definitions and guidance to determine limits of freeboard for bridges on steep grades or vertical curve.
- 14:49, 9 June 2014 diff hist 0 m 748.3 Freeboard 748.3 Bridge Freeboard moved to 748.3 Freeboard: Bridge freeboard is only one type of freeboard. Re-titled to reflect this fact.
- 14:49, 9 June 2014 diff hist +29 N 748.3 Bridge Freeboard 748.3 Bridge Freeboard moved to 748.3 Freeboard: Bridge freeboard is only one type of freeboard. Re-titled to reflect this fact. current
- 14:44, 9 June 2014 diff hist +429 m 748.2 Roadway Design Criteria Per Bridge, reorganized and re-titled article for greater clarity. Terminology clarified.
- 14:35, 9 June 2014 diff hist 0 m 748.2 Roadway Design Criteria 748.2 Roadway Overtopping moved to 748.2 Roadway Design Criteria: Confusion of "Roadway Overtopping" and "Overtopping Flood" was addressed
- 14:35, 9 June 2014 diff hist +43 N 748.2 Roadway Overtopping 748.2 Roadway Overtopping moved to 748.2 Roadway Design Criteria: Confusion of "Roadway Overtopping" and "Overtopping Flood" was addressed current
- 14:30, 9 June 2014 diff hist -2 m Category:748 Hydraulics and Drainage current
- 14:29, 9 June 2014 diff hist -14 m Category:748 Hydraulics and Drainage Per Bridge, minor clarification
- 12:07, 9 June 2014 diff hist +34 m Category:501 Concrete →501.1 Construction Inspection for Sec 501: new photo