User contributions for Smithk
Jump to navigation
Jump to search
10 July 2014
- 13:4613:46, 10 July 2014 diff hist 0 N File:751.5.11.1 splice No 1.jpg No edit summary current
- 13:4513:45, 10 July 2014 diff hist 0 N File:751.5.11.1 Example.pdf No edit summary
- 13:4513:45, 10 July 2014 diff hist +2,321 m 751.5 Structural Detailing Guidelines →751.5.11.1 General: Per Bridge, revision at AGC's request. New guidance to specify the need for additional mechanical bar splices when required in the approach slabs because of stage construction.
- 11:2311:23, 10 July 2014 diff hist +29 m Main Page No edit summary
- 10:5210:52, 10 July 2014 diff hist −4 m Main Page No edit summary
- 10:4610:46, 10 July 2014 diff hist 0 N File:Main Page 4 July 10, 2014.jpg No edit summary current
- 10:4510:45, 10 July 2014 diff hist 0 N File:Main Page 2 July 10, 2014.jpg No edit summary current
- 10:4510:45, 10 July 2014 diff hist 0 N File:Main Page 3 July 10, 2014.jpg No edit summary current
- 10:4310:43, 10 July 2014 diff hist 0 N File:Main Page July 10, 2014.jpg No edit summary current
- 10:4310:43, 10 July 2014 diff hist −252 m Main Page No edit summary
9 July 2014
- 12:1612:16, 9 July 2014 diff hist −127 m Main Page No edit summary
- 07:1407:14, 9 July 2014 diff hist −1 m Category:409 Seal Coat UPdated with Danica's name
8 July 2014
- 12:2712:27, 8 July 2014 diff hist 0 N File:Main Page July 8, 2014.jpg No edit summary current
- 12:2712:27, 8 July 2014 diff hist +142 m Main Page EPG 101 and EPG 236.5.25.6
- 09:3709:37, 8 July 2014 diff hist −294 m 905.2 Traffic Studies →905.2.3 Countermeasure Selection: Per Traffic, removed archaic language
- 09:1909:19, 8 July 2014 diff hist +387 m 905.2 Traffic Studies →905.2.3 Countermeasure Selection
- 08:5208:52, 8 July 2014 diff hist 0 N File:233.2.6 J-turn.pdf No edit summary
- 08:5108:51, 8 July 2014 diff hist +281 m 233.2 At-Grade Intersections with Stop and Yield Control →233.2.6 Type 4: Directional Median Opening with Downstream U-Turns: Per Traffic, added MU's evaluation of the J-turn
- 08:4108:41, 8 July 2014 diff hist +33 m 236.5 Property Management updated link
- 08:3808:38, 8 July 2014 diff hist 0 N File:236.5.25.6 Hwy Structure Security Assessment.xls No edit summary current
- 08:3808:38, 8 July 2014 diff hist 0 N File:236.5 Bridge Column Protection Auto.pdf No edit summary
- 08:3708:37, 8 July 2014 diff hist 0 N File:236.5 Bridge Column Protection Truck.pdf No edit summary
- 08:3708:37, 8 July 2014 diff hist −649 m 236.5 Property Management Per RW, clarified security assessment for leased areas guidance, and an associated form and two figures
- 07:2007:20, 8 July 2014 diff hist 0 File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx uploaded a new version of "Image:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx"
- 07:2007:20, 8 July 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (MoDOT) July 2014.docx No edit summary
- 07:2007:20, 8 July 2014 diff hist 0 N File:Digital Signature for Adobe Pro 10 (Contractors) July 2014.docx No edit summary
- 07:1907:19, 8 July 2014 diff hist +15 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated 2 QRGs (Digital Signature for Adobe Pro 10) for contractors and MoDOT
7 July 2014
- 08:2908:29, 7 July 2014 diff hist 0 N File:Main Page July 7, 2014.jpg No edit summary current
- 08:2908:29, 7 July 2014 diff hist +71 m Main Page new photo
2 July 2014
- 12:3112:31, 2 July 2014 diff hist +3 m Main Page No edit summary
- 12:2912:29, 2 July 2014 diff hist 0 N File:Main Page July 2, 2014.jpg No edit summary current
- 12:2912:29, 2 July 2014 diff hist −397 m Main Page EPG 102.2
- 11:1211:12, 2 July 2014 diff hist +144 m Talk:102.2 Contractor Performance Rating System No edit summary current
- 11:0911:09, 2 July 2014 diff hist 0 N File:102.2 CPQ.pdf No edit summary
- 11:0911:09, 2 July 2014 diff hist −64 m 102.2 Contractor Performance Rating System Per CM, updated Contractor Performance Evaluation Example Form
- 07:4107:41, 2 July 2014 diff hist +204 m Main Page EPG 132
- 07:2307:23, 2 July 2014 diff hist +717 m Category:132 Safety Added PPE posters
1 July 2014
- 15:0815:08, 1 July 2014 diff hist −121 m Main Page EPG 104.13.2
- 15:0515:05, 1 July 2014 diff hist +1,090 m 104.13 Construction Inspection Guidance for Sec 104 →Concept Proposal: Per EPG, guidance expanded to clarify/remind the resident engineers and any contractors of the minimum expectations for VECP and PDVECP submittal information
- 14:3814:38, 1 July 2014 diff hist +11 m Category:130 Value Engineering →130.2 Contractor initiated VECPs: Per EPG, removal of "contractor initiated" verbiage to more properly reflect Construction Division's view
- 13:5113:51, 1 July 2014 diff hist 0 N File:Main Page 2 July 1, 2014.jpg No edit summary current
- 13:5013:50, 1 July 2014 diff hist 0 N File:Main Page July 1, 2014.jpg No edit summary current
- 13:5013:50, 1 July 2014 diff hist +433 m Main Page EPG 109.8
- 12:4012:40, 1 July 2014 diff hist +1,893 m Category:109 Measurement and Payment →109.8 Final Acceptance and Payment (for Sec 109.8): Per CM, provided guidance reflecting existing C-242 practice
- 12:3012:30, 1 July 2014 diff hist −223 m Category:134 Engineering Professional Services →134.2.1 Professional Services Committee (PSC): Per Bridge and Design, clarified the PSC's potential membership
30 June 2014
- 13:3313:33, 30 June 2014 diff hist 0 m Category:127 MoDOT and the Environment No edit summary
- 13:3113:31, 30 June 2014 diff hist +22 m 127.1 Request for Environmental Services updated link
- 12:3212:32, 30 June 2014 diff hist −217 m 616.4 Flagger Control (MUTCD Chapter 6D) →616.5.2 High-Visibility Safety Apparel (MUTCD 6E.02): Updated PPE link
- 12:1712:17, 30 June 2014 diff hist +8 m 903.17 Overhead Sign Mounting →903.4.1 Overhead Sign Installations (MUTCD Section 2A.17)
- 12:1612:16, 30 June 2014 diff hist −29 m 903.17 Overhead Sign Mounting new photo