User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:35, 7 August 2014 diff hist +8 m 903.7 Conventional Road Guide Signs →Table 903.7.51 Approved National Scenic Byways: Per Traffic, updated links
- 14:31, 7 August 2014 diff hist -10 m 903.5 Regulatory Signs Per Traffic, numerous corrections and updates
- 14:21, 7 August 2014 diff hist -165 m 903.6 Warning Signs Per Traffic, numerous minor corrections and updates
- 12:48, 7 August 2014 diff hist +2 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 12:47, 7 August 2014 diff hist +385 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Bidding and Contract Services, updated PoDI List
- 07:12, 7 August 2014 diff hist +171 m LPA:136.13 LPA Policy Changes Per RW, updated Roster of Approved Contract Negotiators
- 07:09, 7 August 2014 diff hist +38 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated Roster of Approved Contract Negotiators
- 07:07, 7 August 2014 diff hist +77 m 236.7 Negotiation Per RW, updated Roster of Approved Contract Negotiators
- 13:54, 6 August 2014 diff hist -1 m LPA:136.7 Design →136.7.2.9 Public Interest Findings
- 13:24, 6 August 2014 diff hist +163 m LPA:136.13 LPA Policy Changes EPG 136.7.2.9
- 13:22, 6 August 2014 diff hist 0 N File:136.7.2.9 sample letter.docx
- 13:21, 6 August 2014 diff hist -56 m LPA:136.7 Design Per Innovation Engineer, updated sample letter
- 09:23, 6 August 2014 diff hist +42 m 751.11 Bearings →751.11.2.1 Elastomeric Bearings: Per Bridge, clarification of the rectangular laminated elastomeric pad's uplift check
- 08:48, 6 August 2014 diff hist -109 m Main Page EPG 236.5.14
- 08:44, 6 August 2014 diff hist +491 m 236.5 Property Management →236.5.14 Release of Temporary Easements and Retention Clauses: added link
- 08:41, 6 August 2014 diff hist +174 m 236.5 Property Management →236.5.14 Release of Temporary Easements and Retention Clauses: Per RW, a new method to release the temp easement or retention clause
- 07:20, 6 August 2014 diff hist +428 m Category:100 GENERAL Per Design, added MHTC backup format guidance
- 09:58, 5 August 2014 diff hist -176 m Main Page EPG 642
- 12:24, 4 August 2014 diff hist +461 m 642.8 Sidewalk Design Criteria →642.1.1 Sidewalk Location and Width: Per Non-motorized Transpn. Engr., clarification of existing sidewalk policy
- 12:17, 4 August 2014 diff hist +326 m Category:642 Pedestrian Facilities →Maintenance Responsibility: Per Non-motorized Transpn. Engr., clarification of existing policy
- 11:32, 4 August 2014 diff hist -6 m Main Page
- 11:31, 4 August 2014 diff hist 0 N File:Main Page Aug 4, 2014.jpg current
- 11:29, 4 August 2014 diff hist 0 N File:Line Item Adjustments 2014.docx
- 11:29, 4 August 2014 diff hist 0 N File:Emergency Contacts 2014.docx
- 11:28, 4 August 2014 diff hist 0 N File:Media-Emergency Contacts 2014.docx
- 11:28, 4 August 2014 diff hist +455 m Main Page EPG 101
- 10:44, 4 August 2014 diff hist +34 m 903.8 Freeway and Expressway Guide Signs →903.8.2 Freeway and Expressway Signing Principles (MUTCD Section 2E.02): added photo
- 10:43, 4 August 2014 diff hist 0 N File:903.8.2.jpg current
- 10:32, 4 August 2014 diff hist +1 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, the list of line item adjustment types updated in Line Item Adjustments QRG & Emergency Contacts QRG was updated to include alternate report location
- 12:42, 1 August 2014 diff hist 0 N File:902.5.8.4.6.xls current
- 12:42, 1 August 2014 diff hist 0 N File:902.5.8.4.5.xlsx current
- 12:40, 1 August 2014 diff hist 0 N File:902.5.8.4.4.xlsx current
- 12:39, 1 August 2014 diff hist 0 N File:902.5.8.4.3.xlsx current
- 12:39, 1 August 2014 diff hist 0 N File:902.5.8.4.2.xlsx current
- 12:38, 1 August 2014 diff hist 0 File:902.5.8.4.1.xls uploaded a new version of "Image:902.5.8.4.1.xls" current
- 12:38, 1 August 2014 diff hist 0 N File:902.5.8.4.1.xls
- 12:36, 1 August 2014 diff hist -876 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.8 Responsibility for Operation and Maintenance (MUTCD Section 4D.02): Per Traffic, clarified EPG 902.5.8.3 and EPG 902.5.8.4
- 09:26, 1 August 2014 diff hist -7 m Main Page EPG 902.15
- 07:44, 1 August 2014 diff hist 0 N File:902.15 worksheets.xlsm current
- 07:44, 1 August 2014 diff hist +224 m 902.15 Designing a Traffic Signal Per Traffic, added Signal Design Worksheets
- 13:56, 29 July 2014 diff hist +408 m Category:941 Permits and Access Requests →941.6 Request for a Permit to Perform Work on MHTC’S Right of Way: Per Traffic, added links
- 13:27, 29 July 2014 diff hist +1 m 751.50 Standard Detailing Notes →A5. Miscellaneous
- 12:51, 29 July 2014 diff hist -355 m Main Page EPG 751.50
- 12:47, 29 July 2014 diff hist +364 m 751.50 Standard Detailing Notes →A5. Miscellaneous: Per Bridge, new note. A new indicator check box list is being added to the bridge plans for concrete superstructures that use concrete panels
- 10:18, 29 July 2014 diff hist -1,064 m Main Page EPG 903.4.12
- 09:12, 29 July 2014 diff hist +3 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.3 19 Current BEAP Consultant List
- 09:11, 29 July 2014 diff hist +6 m LPA:136.3 Federal Aid Basics Per Bridge, updated Fig. 136.3.19 Current BEAP Consultant List
- 09:10, 29 July 2014 diff hist 0 N File:Fig.136.3.19 July,29 2014.pdf
- 09:09, 29 July 2014 diff hist +112 m LPA:136.13 LPA Policy Changes Fig 136.3.19
- 08:49, 29 July 2014 diff hist -84 m 903.4 Overhead Sign Mounting →903.4.12 Overhead Sign and Truss Inspection/Inventory: Per BR & MT, revison reflects 2011 decision to move sign truss inspection responsibility to BR. There is no approved inspection frequency