User contributions for Smithk
Jump to navigation
Jump to search
22 August 2014
- 13:1913:19, 22 August 2014 diff hist 0 N File:136.9.3 Aug 2014.doc No edit summary
- 13:1913:19, 22 August 2014 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, in Fig. 136.9.3 added drafter's note to provide guidance for highlighted sections. Added language to define the contracting authority.
21 August 2014
- 15:2215:22, 21 August 2014 diff hist 0 m Main Page No edit summary
- 08:1408:14, 21 August 2014 diff hist 0 m 106.3.2.85 TM-85, Determination of Polyphosphoric Acid (PPA) in Performance Graded (PG) Asphalt Binders →106.3.2.85.5 Calculation: Per Constr and Materials, corrected the conversion factor
- 07:4207:42, 21 August 2014 diff hist +121 m Main Page EPG 238.2.17, EPG 236.4.6.2
- 07:3507:35, 21 August 2014 diff hist +2 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review
- 07:3507:35, 21 August 2014 diff hist +2 m 236.4 Description Writing and Titles →236.4.6.2 Methods of Legally Describing the Fee or Portion Thereof
- 07:3307:33, 21 August 2014 diff hist −3 m 236.4 Description Writing and Titles →236.4.6.2 Methods of Legally Describing the Fee or Portion Thereof: Per RW, PLS signature and seal guidance clarified
- 07:2907:29, 21 August 2014 diff hist +747 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review: Per RW, PLS signature and seal guidance clarified
20 August 2014
- 12:1512:15, 20 August 2014 diff hist −172 m Main Page EPG 751.8
- 12:0312:03, 20 August 2014 diff hist +464 m 751.8 Concrete Box Culverts Per Bridge, added link to the Box Culvert Quantity Program
- 10:2510:25, 20 August 2014 diff hist −3 m Category:138 Project Development Chronology No edit summary
- 10:1410:14, 20 August 2014 diff hist 0 m Category:138 Project Development Chronology updated link
18 August 2014
- 14:2714:27, 18 August 2014 diff hist 0 N File:Main Page Aug 18, 2014.jpg No edit summary current
- 14:2714:27, 18 August 2014 diff hist −453 m Main Page EPG 751.1.2.6
- 13:0313:03, 18 August 2014 diff hist +1,006 m 751.1 Preliminary Design →751.1.2.6.3.3 Roadway Fill: Per Bridge, added guidance for minimum fill over box culverts under roadway
- 12:5012:50, 18 August 2014 diff hist +70 m 748.4 Headwater and Backwater →748.4.1 Headwater: Per Bridge, clarification of when to apply one of the criteria
- 12:2212:22, 18 August 2014 diff hist +1,343 m 121.3 The Statewide Transportation Improvement Program (STIP) Per EPG, added box presenting info including the allowance of Taking Care of the System projects and System Exp projects completely funded by other entities
15 August 2014
- 10:0110:01, 15 August 2014 diff hist +73 m 750.7 Non-Hydraulic Considerations →750.7.11.1 Minimum Fill Heights: Per Bridge, further clarification for min. fill of aggregate base material
- 08:3808:38, 15 August 2014 diff hist 0 N File:Main Page Aug 15, 2014.jpg No edit summary current
- 08:3808:38, 15 August 2014 diff hist −47 m Main Page No edit summary
13 August 2014
- 15:1915:19, 13 August 2014 diff hist +157 m Main Page EPG 903.10
- 15:1615:16, 13 August 2014 diff hist −1 m Category:644 Weigh Stations, Rest Areas, Welcome/Information Centers and Commuter Parking Lots updated link
- 15:1515:15, 13 August 2014 diff hist 0 m 903.8 General Information Signs (MUTCD Chapter 2H) →903.9.19 Veterans Signing: updated link
- 15:1515:15, 13 August 2014 diff hist −13,558 m 903.9 General Service Signs (MUTCD Chapter 2I) Per Traffic, updated General Service Signs guidance to comply with current practice. Renumbered subtitles in the rest of the article
- 15:0615:06, 13 August 2014 diff hist −65 m Category:903 Highway Signing (MUTCD Part 2) updated link
- 14:3614:36, 13 August 2014 diff hist −164 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) →806.8.1 Introduction to the Storm Water Permit and Storm Water Polution Prevention Plan (SWPPP)
- 14:2714:27, 13 August 2014 diff hist −3 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.3.1 Payments/Invoicing: minor correction
- 14:0114:01, 13 August 2014 diff hist +309 m Main Page EPG 806.8
- 13:5513:55, 13 August 2014 diff hist +113 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) No edit summary
- 13:5313:53, 13 August 2014 diff hist 0 N File:Main Page Aug 13, 2014.jpg No edit summary current
- 13:5213:52, 13 August 2014 diff hist −574 m Main Page No edit summary
- 10:4510:45, 13 August 2014 diff hist 0 N File:806.8 Land Disturbance 2014.ppt No edit summary current
- 10:4510:45, 13 August 2014 diff hist +178 m 806.8 Storm Water Pollution Prevention Plan (SWPPP) Per Env'l, updated the Land Disturbance Training as well as made a video available for iPads and tablets.
- 07:5607:56, 13 August 2014 diff hist −44 m LPA:136.10 Advertisement for Bid and Project Award removed links
- 07:5107:51, 13 August 2014 diff hist 0 m 903.18 Signing for School Areas →Table 903.19.13 Sight Distance Requirements for use of the S3-1 sign: Per Traffic, revised min sight dist to 300 ft for the use of the S3-1 sign
12 August 2014
- 12:0012:00, 12 August 2014 diff hist +182 m 903.18 Signing for School Areas Per Traffic, added link to Table 903.6.6 for clarification
- 10:5110:51, 12 August 2014 diff hist 0 N File:Figure 903.6.28 2014.jpg No edit summary current
- 10:5010:50, 12 August 2014 diff hist +125 m 903.3 Warning Signs and Object Markers (MUTCD Chapter 2C) Per Traffic, several clarifications including updated Fig. 903.6.28 to remove the unnecessary 175' dimension
- 10:1010:10, 12 August 2014 diff hist 0 m Main Page EPG 750.7.11.1
- 09:2509:25, 12 August 2014 diff hist 0 N File:Main Page 2 Aug 12, 2014.jpg No edit summary current
- 09:2509:25, 12 August 2014 diff hist 0 N File:Main Page Aug 12, 2014.jpg No edit summary current
- 09:2309:23, 12 August 2014 diff hist −144 Main Page No edit summary
- 08:5008:50, 12 August 2014 diff hist +195 m 751.8 Concrete Box Culverts →751.8.1.2 Standard Box Culverts: Per Bridge, added link to index to box culvert standard plans and table of standard box culvert sizes in EPG 750.7.4.1
- 08:4508:45, 12 August 2014 diff hist +187 m 750.7 Non-Hydraulic Considerations →750.7.11.1 Minimum Fill Heights: Per Bridge, added guidance for minimum fill heights over box culverts. Update guidance for minimum fill heights over pipes.
- 08:3908:39, 12 August 2014 diff hist −274 m 104.13 Construction Inspection Guidance for Sec 104 Per Construction, updated C-104 Form
11 August 2014
- 09:4909:49, 11 August 2014 diff hist −2 m Main Page No edit summary
8 August 2014
- 11:1411:14, 8 August 2014 diff hist −90 m Main Page EPG 751.50
- 11:1211:12, 8 August 2014 diff hist +314 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, updated Note A1 for LRFD Seismic Design
- 10:3710:37, 8 August 2014 diff hist 0 N File:Main Page 2 Aug 8, 2014.jpg No edit summary current