User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:13, 29 August 2014 diff hist -59 m 751.22 Prestressed Concrete I Girders →751.22.1.2 Geometric Dimensions: Per Bridge, "See Structural Project Manager before using NU Sections" note removed.
- 07:10, 29 August 2014 diff hist 0 N File:Culvert Hydraulics Report 2014.docx
- 07:09, 29 August 2014 diff hist 0 N File:Bridge Hydraulics Report.docx
- 07:09, 29 August 2014 diff hist -14 m Category:101 Standard Forms →Bridge: Per Bridge, updated two forms, Bridge Hydraulics Report and Culvert Hydraulics Report
- 13:54, 28 August 2014 diff hist 0 N File:101 Design Layout Stream.docx
- 13:53, 28 August 2014 diff hist 0 N File:101 Design Layout Box.docx
- 13:53, 28 August 2014 diff hist -52 m Category:101 Standard Forms →Bridge: Per Bridge, updated two forms (Design Layout Box and Stream)
- 13:21, 28 August 2014 diff hist +5 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.6.7
- 13:20, 28 August 2014 diff hist +10 m LPA:136.6 Environmental and Cultural Requirements Per Env'l, Fig. 136.6.7 was further corrected as a reference to a previous law, STURAA, was replaced with the new law MAP-21
- 13:19, 28 August 2014 diff hist 0 N File:136.6.7 2014.docx
- 13:19, 28 August 2014 diff hist +210 m LPA:136.13 LPA Policy Changes Fig. 136.6.7
- 12:52, 28 August 2014 diff hist 0 N File:Main Page Aug 28, 2014.jpg current
- 12:52, 28 August 2014 diff hist -83 m Main Page EPG 135.2
- 12:21, 28 August 2014 diff hist -3 m Category:135 The Section 106 Process →Jobs requiring Section 106 compliance
- 12:20, 28 August 2014 diff hist +2 m Category:135 The Section 106 Process →135.2 The Section 106 Process for MoDOT Projects
- 11:29, 28 August 2014 diff hist -123 m 236.16 Outdoor Advertising →236.16.11 Cutout and Extension Process: Per RW, guidance updated to conform with current practice
- 11:17, 28 August 2014 diff hist 0 m Category:135 The Section 106 Process →Timelines
- 11:16, 28 August 2014 diff hist 0 N File:135.2 flowchart.jpg current
- 11:15, 28 August 2014 diff hist +2,196 m Category:135 The Section 106 Process →135.2 The Section 106 Process for MoDOT Projects: Per Envir’l, a new agreement with FHWA and others allows MoDOT to use a “phased” approach to achieve Section 106 compliance.
- 08:32, 28 August 2014 diff hist +25 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 08:27, 28 August 2014 diff hist +308 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: updated link
- 12:35, 27 August 2014 diff hist +1 m 236.5 Property Management →236.5.28.2 Entrance "Widening" or "Widening and Shift": Per RW, verbiage updated to use the appropriate term
- 12:11, 27 August 2014 diff hist +1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.6.7
- 12:10, 27 August 2014 diff hist 0 N File:136.6.7.docx
- 12:10, 27 August 2014 diff hist +277 m LPA:136.13 LPA Policy Changes Fig. 136.6.7
- 12:08, 27 August 2014 diff hist +2 m LPA:136.6 Environmental and Cultural Requirements Per Envir'l, updated Fig. 136.6.7. The location of a statement about stipulations was corrected.
- 10:28, 27 August 2014 diff hist +212 m LPA:136.13 LPA Policy Changes EPG 136.12
- 10:26, 27 August 2014 diff hist -41 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.3.4 Links to Other Resources: Updated State Wage Rates links from Mo Dept of Labor
- 08:51, 27 August 2014 diff hist 0 N File:Main Page Aug 27, 2014.jpg current
- 08:50, 27 August 2014 diff hist -15 m Main Page
- 13:58, 26 August 2014 diff hist -139 m Main Page EPG 236.16.11
- 13:55, 26 August 2014 diff hist -137 m 236.16 Outdoor Advertising →236.16.11 Cutout and Extension Process: Per RW, added clarifying guidance about grandfathering an extension
- 08:28, 26 August 2014 diff hist +279 m Main Page EPG 900
- 08:10, 26 August 2014 diff hist +449 m Category:900 TRAFFIC CONTROL →900.1 General (MUTCD CHAPTER 1A): Per Traffic, revision to reflect FHWA's change in the MUTCD to permit MoDOT to use engineering judgement to modify a "shall" condition.
- 14:41, 25 August 2014 diff hist -1 m Main Page
- 14:15, 25 August 2014 diff hist -1 m 751.22 Prestressed Concrete I Girders →751.22.3.4 Beam Section Properties Tables - Conventional Concrete Strength
- 13:50, 25 August 2014 diff hist 0 N File:Main Page Aug 25, 2014.jpg current
- 13:49, 25 August 2014 diff hist -113 m Main Page EPG 751.50
- 13:47, 25 August 2014 diff hist +39 m 751.50 Standard Detailing Notes →I1. General: Per Bridge, revised I1.67 for additional clarity
- 13:02, 25 August 2014 diff hist 0 m Main Page
- 15:11, 22 August 2014 diff hist 0 m Main Page
- 13:22, 22 August 2014 diff hist +243 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 13:20, 22 August 2014 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 13:19, 22 August 2014 diff hist 0 N File:136.9.3 Aug 2014.doc
- 13:19, 22 August 2014 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, in Fig. 136.9.3 added drafter's note to provide guidance for highlighted sections. Added language to define the contracting authority.
- 15:22, 21 August 2014 diff hist 0 m Main Page
- 08:14, 21 August 2014 diff hist 0 m 106.3.2.85 TM-85 Determination of Polyphosphoric Acid (PPA) in Performance Graded (PG) Asphalt Binders →106.3.2.85.5 Calculation: Per Constr and Materials, corrected the conversion factor current
- 07:42, 21 August 2014 diff hist +121 m Main Page EPG 238.2.17, EPG 236.4.6.2
- 07:35, 21 August 2014 diff hist +2 m 238.2 Land Surveying →238.2.17 Professional Land Surveyor Review
- 07:35, 21 August 2014 diff hist +2 m 236.4 Description Writing and Titles →236.4.6.2 Methods of Legally Describing the Fee or Portion Thereof