User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:53, 24 September 2014 diff hist +124 m Category:139 Design - Build →139.8.2.6 Proposal Selection and Project Award: Per Design, clarification of the Commission's Project Design Approval for Design/Build projects
- 13:57, 23 September 2014 diff hist +504 m LPA:136.4 Consultant Selection and Consultant Contract Management →136.4.2.4.3 Using the LPA On-Call Consultant List: Per LPA, clarified to indicate the total on-call cannot exceed $100,000 for the project
- 13:57, 23 September 2014 diff hist +407 m LPA:136.13 LPA Policy Changes
- 13:19, 23 September 2014 diff hist +300 104.13 Construction Inspection Guidance for Sec 104 →Re-evaluation Request: Per Design, clarified the revision from a few minutes ago.
- 13:18, 23 September 2014 diff hist +26 m Main Page EPG 104.13.2
- 13:07, 23 September 2014 diff hist +635 m Main Page EPG 104, EPG 170, EPG 409, EPG 643.2, EPG 806.8, EPG Other Aspects of Pavement Design
- 12:38, 23 September 2014 diff hist +548 104.13 Construction Inspection Guidance for Sec 104 →104.13.2 Value Engineering Proposals (Sec 104.6): Per DE, VECP/PDVECP had evaluation process but provided no recourse for contractor if submittal is rejected. Now request can be submitted to CM
- 12:31, 23 September 2014 diff hist 0 643.2 Local Utility Adjustments - Public and Private Per Design, limit raised on lump sum agreements for utilities, eliminating need for keeping & auditing detailed cost records. Lump sum agreements to be submitted with clearly defined scope & cost est.
- 12:27, 23 September 2014 diff hist 0 N File:R415 - Chemical Weed Control 2014.pdf
- 12:27, 23 September 2014 diff hist 0 N File:R414 - Brush Cutting & Tree Removal 2014.pdf
- 12:26, 23 September 2014 diff hist 0 N File:R413 - Mowing 2014.pdf
- 12:26, 23 September 2014 diff hist 0 N File:R412 - Landscaping 2014.pdf
- 12:26, 23 September 2014 diff hist 0 N File:R411 - Litter Pick-Up 2014.pdf
- 12:25, 23 September 2014 diff hist 0 N File:R323 - Deck Repair Concrete 2014.pdf
- 12:25, 23 September 2014 diff hist 0 N File:R322 - Bridge Seal Coats 2014.pdf
- 12:25, 23 September 2014 diff hist 0 N File:R321 - Sealing Abutment & Pier Caps 2014.pdf
- 12:24, 23 September 2014 diff hist 0 N File:170 R31C Chip Sealing (Fine Aggregate).pdf
- 12:24, 23 September 2014 diff hist 0 N File:170 R31C Chip Sealing (Course Aggregate).pdf
- 12:23, 23 September 2014 diff hist 0 N File:170 R31B Sweep & Flush Pavements, Shoulders & Bridges (Lane Mile).pdf
- 12:23, 23 September 2014 diff hist 0 N File:170 R315 Crack & Joint Maintenance (Milling High Joints).pdf
- 12:23, 23 September 2014 diff hist 0 N File:170 R315 Crack & Joint Maintenance (Sealing Cracks, Joints & Edge Cracks).pdf
- 12:22, 23 September 2014 diff hist 0 N File:170 R315 Fly Coating.pdf
- 12:22, 23 September 2014 diff hist 0 N File:170 R314 Cold Milling.pdf
- 12:22, 23 September 2014 diff hist 0 N File:170 R314 Pavement Leveling (Mudjacking or Other Methods).pdf
- 12:22, 23 September 2014 diff hist 0 N File:170 R313 Concrete Replacement Full Depth.pdf
- 12:21, 23 September 2014 diff hist 0 N File:170 R312 Box & Lay Down Machine Patching.pdf
- 12:21, 23 September 2014 diff hist 0 N File:170 R312 Blade, Box & Lay Down Machine Patching.pdf
- 12:21, 23 September 2014 diff hist 0 N File:170 R311 Pothole Patching (Temp Emergency Repairs & Blow Up Repairs).pdf
- 12:20, 23 September 2014 diff hist 0 N File:170 R311 Pothole Patching (Permanent partial depth repair on asphaltic or concrete pavements).pdf
- 12:20, 23 September 2014 diff hist 0 N File:170 R22E Edge Rut Repair.pdf
- 12:20, 23 September 2014 diff hist 0 N File:170 R227 Traffic Barriers (Repair).pdf
- 12:19, 23 September 2014 diff hist 0 N File:170 R227 Traffic Barriers (Replacement).pdf
- 12:19, 23 September 2014 diff hist 0 N File:170 R227 Impact Attenuator Devices.pdf
- 12:18, 23 September 2014 diff hist 0 N File:170 R227 Guard Cables.pdf
- 12:18, 23 September 2014 diff hist 0 N File:170 R227 Guardrails.pdf
- 12:18, 23 September 2014 diff hist 0 N File:170 R227 Fences.pdf
- 12:17, 23 September 2014 diff hist 0 N File:170 R225 Repair Sod and Aggregate Shoulders & approaches.pdf
- 12:17, 23 September 2014 diff hist 0 N File:170 R225 Repair Concrete Shoulders & Approaches.pdf
- 12:17, 23 September 2014 diff hist 0 N File:170 R225 Pothole Patching Asphalt & Partial Depth Concrete.pdf
- 12:16, 23 September 2014 diff hist 0 N File:170 R225 Fly Coating.pdf
- 12:16, 23 September 2014 diff hist 0 N File:170 R225 Edge Ribbon.pdf
- 12:15, 23 September 2014 diff hist 0 N File:170 R225 Chip Seal.pdf
- 12:14, 23 September 2014 diff hist 0 N File:170 R225 Blade Patching.pdf
- 12:14, 23 September 2014 diff hist 0 N File:Work schedule2 2014.jpg current
- 12:14, 23 September 2014 diff hist 0 N File:170 Work Scheduling Guide 2014.xls current
- 12:13, 23 September 2014 diff hist 0 N File:Work schedule1 2014.jpg current
- 12:12, 23 September 2014 diff hist -2,671 Category:170 Maintenance Activity Planning Guidelines Per MT, revised to accommodate changes in MoDOT operations and to provide consistency among districts.
- 12:10, 23 September 2014 diff hist 0 N File:806.8.14.docx current
- 12:10, 23 September 2014 diff hist 0 N File:806.8.4.docx current
- 12:09, 23 September 2014 diff hist 0 N File:806.8.3.docx current