User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:33, 1 December 2014 diff hist 0 N File:751.5.1.1 span.jpg current
- 09:32, 1 December 2014 diff hist 0 N File:751.5.1.1 ground line.jpg current
- 09:32, 1 December 2014 diff hist 0 N File:751.5.1.1 water.jpg current
- 09:31, 1 December 2014 diff hist 0 N File:751.5.1.1 joints.jpg current
- 09:31, 1 December 2014 diff hist 0 N File:751.5.1.1 CAD.jpg current
- 09:30, 1 December 2014 diff hist +96,680 m 751.5 Structural Detailing Guidelines Per Bridge, EPG 751.5 Standard Details generally rewritten and retitled as "Structural Detailing Guidelines". The article had many archaic details, except for its welding info, which was retained with
- 09:28, 1 December 2014 diff hist 0 m 751.5 Structural Detailing Guidelines 751.5 Standard Details moved to 751.5 Structural Detailing Guidelines: Per Bridge, EPG 751.5 Standard Details generally rewritten and retitled as "Structural Detailing Guidelines". The article had many archaic details, except for its welding info,
- 09:28, 1 December 2014 diff hist +51 N 751.5 Standard Details 751.5 Standard Details moved to 751.5 Structural Detailing Guidelines: Per Bridge, EPG 751.5 Standard Details generally rewritten and retitled as "Structural Detailing Guidelines". The article had many archaic details, except for its welding info, current
- 08:29, 26 November 2014 diff hist +359 m LPA:136.13 LPA Policy Changes Figs. 136.4.1 and 136.9.1
- 08:24, 26 November 2014 diff hist -17 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Figs. 136.4.1 and 136.9.1
- 08:21, 26 November 2014 diff hist 0 N File:136.9.1 2014.xlsx
- 08:21, 26 November 2014 diff hist -40 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig. 136.9.1 to reflect that all plan sheets are signed and sealed by engineer of record
- 08:17, 26 November 2014 diff hist 0 N File:Fig. 136.4.1 2014.docx
- 08:17, 26 November 2014 diff hist -54 m LPA:136.4 Consultant Selection and Consultant Contract Management Per LPA, in Fig. 136.4.1 the title of Attachment E was changed on pg.9 to reflect the actual title of the Attachment on pg. 17
- 09:57, 25 November 2014 diff hist 0 N File:101 Floodplain Development Permit To District Cover Letter.docx
- 09:57, 25 November 2014 diff hist -17 m Category:101 Standard Forms →Bridge: Per Bridge, updated Floodplain Development Permit To District Cover Letter form
- 09:27, 25 November 2014 diff hist 0 N File:236.3 Form A419 Nov 2014.docx
- 09:26, 25 November 2014 diff hist -6 m 236.3 Administration Per RW, updated Form A419
- 09:14, 25 November 2014 diff hist +9 m Main Page
- 09:14, 25 November 2014 diff hist -14 m Main Page
- 09:00, 25 November 2014 diff hist 0 N File:Main Page Nov 25, 2014.jpg current
- 09:00, 25 November 2014 diff hist +182 m Main Page EPG 460.3.11
- 08:13, 25 November 2014 diff hist +1 m 460.3 Plant Inspection →460.3.11 Reclaimed Asphalt Pavement (RAP): Per Phys Lab, updated test number since TP58 is no longer a provisional standard
- 16:20, 21 November 2014 diff hist +1 m Main Page
- 11:39, 20 November 2014 diff hist +2 m Main Page
- 11:39, 20 November 2014 diff hist 0 N File:Main Page Nov 20, 2014.jpg current
- 11:38, 20 November 2014 diff hist -220 m Main Page EPG 101
- 11:14, 20 November 2014 diff hist 0 N File:Land Disturbance Project Information.docx
- 11:14, 20 November 2014 diff hist +147 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, the new QRG, Land Disturbance Project Info, is currently intended only for users who access SiteManager via Terminal Services/remote desktop connection
- 09:44, 20 November 2014 diff hist +47 m LPA:136.13 LPA Policy Changes
- 09:43, 20 November 2014 diff hist +407 m LPA:136.13 LPA Policy Changes EPG 136.3.12
- 09:32, 20 November 2014 diff hist +273 m LPA:136.3 Federal Aid Basics →136.3.12 Federal-aid Participation for Local Work: Per LPA, guidance was revised to clarify change orders and supplements.
- 15:51, 19 November 2014 diff hist 0 N File:Main Page Nov 19, 2014.jpg current
- 15:50, 19 November 2014 diff hist -754 m Main Page
- 08:12, 19 November 2014 diff hist -6 m 104.7 Scoping Estimates Per Planning, provided new Engineering Factors Report and updated historic factors reports
- 16:16, 18 November 2014 diff hist +2 m Main Page
- 16:14, 18 November 2014 diff hist +16 m Main Page
- 16:10, 18 November 2014 diff hist -188 m Main Page EPG 109.1, EPG 751.50
- 16:04, 18 November 2014 diff hist +25 m 751.50 Standard Detailing Notes →C1. Bill of Reinforcing Steel: inserted link
- 16:03, 18 November 2014 diff hist -570 m 751.50 Standard Detailing Notes →C1. Bill of Reinforcing Steel: Per Bridge, revised C1.15 and removed C1.16 because CM has rescinded the requirement for adding epoxy coated test bars to the bar bill for bridges.
- 15:47, 18 November 2014 diff hist 0 N File:Change Order Codes 2014.doc current
- 15:46, 18 November 2014 diff hist +5 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, updated Change Order Codes
- 15:45, 18 November 2014 diff hist +5 m Category:109 Measurement and Payment Per CM, updated Change Order Codes
- 11:27, 18 November 2014 diff hist -903 m 237.9 Submission of Plans and Supporting Documents →237.9.1 Final Design Plans Submittal: Per Design, removed archaic guidance about the D-12 Form
- 10:31, 18 November 2014 diff hist 0 N File:Main Page 2 Nov 18, 2014.jpg current
- 10:31, 18 November 2014 diff hist +36 m Main Page new photo
- 10:00, 18 November 2014 diff hist 0 N File:Main Page Nov 18, 2014.jpg current
- 09:59, 18 November 2014 diff hist +103 m Main Page EPG 402
- 08:14, 18 November 2014 diff hist 0 N File:402 JSP FY15 Nov.doc current
- 08:14, 18 November 2014 diff hist 0 N File:402 FY2015 Contract Leveling Course Guidelines Nov.pdf