User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 14:36, 8 January 2015 diff hist 0 N File:Main Page Jan 8, 2015.jpg current
- 14:35, 8 January 2015 diff hist -140 m Main Page EPG 121.3
- 14:13, 8 January 2015 diff hist +65 m 121.3 The Statewide Transportation Improvement Program (STIP) added link
- 14:07, 8 January 2015 diff hist +216 m 121.3 The Statewide Transportation Improvement Program (STIP) Per Asst. Chief Engineer, documentation clarification
- 13:37, 8 January 2015 diff hist +144 m LPA:136.13 LPA Policy Changes Fig 136.9.3
- 13:35, 8 January 2015 diff hist -4 m LPA:136.12 Figures, Glossary and Other Useful Links Per LPA, updated Fig 136.9.3 with the new link to the ADA checklist
- 13:35, 8 January 2015 diff hist 0 N File:136.9.3 2015.doc
- 13:34, 8 January 2015 diff hist -28 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig 136.9.3 with the new link to the ADA checklist
- 13:01, 8 January 2015 diff hist 0 N File:101 Precon letter, state 2015.docx
- 13:01, 8 January 2015 diff hist 0 N File:101 Precon letter, federal 2015.docx
- 13:01, 8 January 2015 diff hist 0 N File:101 Precon letter, federal no trainees 2015.docx
- 13:00, 8 January 2015 diff hist -3 m Category:101 Standard Forms →Construction and Materials: Per CM, updated three forms for Preconference letters
- 15:55, 7 January 2015 diff hist 0 m Main Page
- 10:15, 7 January 2015 diff hist -9 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): minor correction
- 10:12, 7 January 2015 diff hist -419 m Main Page QRG Change Orders – Mobilization and Contract Bond
- 08:50, 7 January 2015 diff hist 0 m Category:109 Measurement and Payment Per CM, QRG Change Orders – Mobilization & Contract Bond updated. Our new agreement with FHWA eliminates the need to send any Level 1 or 2 change orders to FHWA for review.
- 08:48, 7 January 2015 diff hist 0 N File:Change Orders – Mobilization and Contract Bond 2015.docx
- 08:48, 7 January 2015 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, QRG Change Orders – Mobilization & Contract Bond updated. New FHWA agreement eliminates the need to send Level 1 or 2 change orders to FHWA for review
- 16:22, 6 January 2015 diff hist 0 N File:Main Page Jan 6, 2015.jpg current
- 16:21, 6 January 2015 diff hist +84 m Main Page EPG 109.12
- 15:59, 6 January 2015 diff hist 0 N File:109.12 Truth Table 2015.docx
- 15:59, 6 January 2015 diff hist -593 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, revised to conform with new change order approval criteria reducing number of change orders reviewed by FHWA and to improve the process's efficiency
- 15:23, 6 January 2015 diff hist +11 m 236.8 Relocation Assistance Program →236.8.1.1 Applicability of the Relocation Program: Per RW, updated link
- 10:50, 6 January 2015 diff hist 0 m 751.50 Standard Detailing Notes →H11. Miscellaneous: Per Bridge, minor clarification
- 15:56, 5 January 2015 diff hist +1 m Main Page
- 16:26, 2 January 2015 diff hist +16 m Category:903 Highway Signing →MoDOT 5-Year Plan for Signing – Practical Operations: updated links
- 13:12, 2 January 2015 diff hist -502 m Main Page EPG 751.37
- 12:26, 2 January 2015 diff hist 0 N File:751.37.1.1 Design Aid.pdf current
- 12:25, 2 January 2015 diff hist +522 m 751.37 Drilled Shafts Per Bridge, clarified minimum rock socket length requirements.
- 13:24, 31 December 2014 diff hist 0 N File:Main Page Dec 31, 2014.jpg current
- 13:24, 31 December 2014 diff hist -40 m Main Page
- 11:51, 31 December 2014 diff hist +25 m 751.22 Prestressed Concrete I Girders →751.22.3.13 Intermediate Diaphragms: Per Bridge, clarified guidance
- 10:05, 31 December 2014 diff hist +4 m LPA:136.13 LPA Policy Changes
- 08:46, 31 December 2014 diff hist +535 m LPA:136.13 LPA Policy Changes EPG 136.7.3.1.2.1.10 and Fig. 136.9.3
- 08:38, 31 December 2014 diff hist 0 m LPA:136.9 Plans, Specs and Estimates (PSE) Per LPA, updated Fig 136.9.3 Federal Project Bid Proposal Boilerplate to add reference to new JSPs: LD's Specified for Winter Months and Safety Requirements
- 08:35, 31 December 2014 diff hist 0 N File:136.9.3 Dec 2014.doc
- 08:34, 31 December 2014 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links →136.12.1 Figures: Per LPA, updated Fig 136.9.3 Federal Project Bid Proposal Boilerplate
- 08:30, 31 December 2014 diff hist 0 N File:136.7.7.docx current
- 08:29, 31 December 2014 diff hist +517 m LPA:136.7 Design Per LPA, EPG 136.7.3.1.2.1.10 added for the new Safety Requirements JSP (Fig 136.7.7)
- 15:57, 30 December 2014 diff hist 0 m Main Page
- 15:24, 30 December 2014 diff hist +57 m 751.32 Concrete Pile Cap Intermediate Bents →751.32.3.2 Typical Pile Cap Bent: Per Bridge, added clarifying note "Applicable for both HP piles (shown) and CIP piles" under "Part Elevation" figure
- 15:17, 30 December 2014 diff hist 0 N File:127.2 Historic Preservation Staff 2014.pdf
- 15:16, 30 December 2014 diff hist -24 m 127.2 Historic Preservation and Cultural Resources Per Historic Preservation, updated staff info
- 12:19, 30 December 2014 diff hist 0 m 903.5 Regulatory Signs →Table 903.5.3 Regulatory Sign and Plaque Sizes: Per Traffic, corrected dimension for oversized STOP sign
- 09:40, 26 December 2014 diff hist -3 m Main Page EPG 110.3
- 09:06, 26 December 2014 diff hist +1,257 m Category:110 State and Federal Wage Rates and Other Requirements →110.3 Prevailing Wages and Records (Guidance for Sec 110.3): Per CM, routine revisions to increase the number of payrolls that are checked for compliance.
- 12:08, 24 December 2014 diff hist -1 m Main Page
- 12:08, 24 December 2014 diff hist -2 m Category:150 Quality Management →150.1.1 Folder Structure
- 12:07, 24 December 2014 diff hist +1 m Main Page
- 12:05, 24 December 2014 diff hist -74 m Main Page EPG 150.1