User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:59, 25 March 2015 diff hist +838 m 236.15 Requests from Cities for Annexations Per RW, updated several links
- 07:44, 25 March 2015 diff hist +148 m 236.14 Change in Route Status Report Per RW, updated link
- 07:37, 25 March 2015 diff hist -3 m 236.12 Quality Assurance Reviews
- 07:36, 25 March 2015 diff hist +122 m 236.12 Quality Assurance Reviews Per RW, updated link
- 07:34, 25 March 2015 diff hist +947 m 236.11 Mediation Per RW, updated numerous links
- 07:17, 25 March 2015 diff hist +538 m 236.10 Right Of Way Condemnation Per RW, updated links
- 13:42, 24 March 2015 diff hist 0 N File:Main Page Mar 24, 2015.jpg current
- 13:41, 24 March 2015 diff hist -795 m Main Page
- 07:27, 24 March 2015 diff hist +4 m Main Page
- 07:25, 24 March 2015 diff hist -8 m Main Page
- 09:41, 23 March 2015 diff hist 0 N File:Main Page Mar 23, 2015.jpg current
- 09:40, 23 March 2015 diff hist +507 m Main Page EPG 751.5.1.6
- 07:28, 23 March 2015 diff hist 0 N File:751.5.1.6 Additional.pdf
- 07:28, 23 March 2015 diff hist 0 N File:751.5.1.6 Alternate.pdf
- 07:27, 23 March 2015 diff hist 0 N File:751.5.1.6 Typical.pdf
- 07:26, 23 March 2015 diff hist +1,000 m 751.5 Structural Detailing Guidelines Per Bridge, three new bridge plan sheet files added because existing example plans were outdated and didn’t match current standards.
- 07:43, 20 March 2015 diff hist +203 m LPA:136.13 LPA Policy Changes EPG 136.7.2.6.4
- 07:40, 20 March 2015 diff hist +580 m LPA:136.7 Design →136.7.2.6 Utilities: Per LPA, new subarticle provides clarification on Buy America requirements for utility relocation
- 12:18, 19 March 2015 diff hist +171 m LPA:136.13 LPA Policy Changes Fig 136.4.1
- 12:15, 19 March 2015 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.4.1
- 12:14, 19 March 2015 diff hist 0 N File:Fig. 136.4.1 2015.docx
- 12:14, 19 March 2015 diff hist 0 m LPA:136.4 Consultant Selection and Consultant Contract Management Per Design and Audits and Investigations, revision removed the Attachment C-Overhead Rate Breakdown from the contract
- 13:21, 18 March 2015 diff hist +43 m Main Page EPG 241
- 13:09, 18 March 2015 diff hist +129 m Category:241 Aesthetic Considerations →241.4 Applications: Per BR and TR, signs or markings depicting a city, community, or geographical name, seal, or nickname on bridge abutment/MSE wall added to items commonly treated for aesthetics
- 14:45, 17 March 2015 diff hist 0 N File:Main Page Mar 17, 2015.jpg current
- 14:45, 17 March 2015 diff hist +339 m Main Page EPG 101
- 13:57, 17 March 2015 diff hist -5 m Category:108 Prosecution and Progress →108.1 Subletting of Contract (for Sec 108.1): Per CM, in Subcontractor QRG, updated some icons that changed with the recent SM upgrade and revised it due to a change in the subcontracts window
- 13:55, 17 March 2015 diff hist 0 N File:Terminal Services-Remote Desktop Connection 2015.docx
- 13:54, 17 March 2015 diff hist 0 N File:Subcontracts 2015.docx
- 13:54, 17 March 2015 diff hist 0 N File:Cognos Access for SM 2015.doc current
- 13:54, 17 March 2015 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, in 3 QRGs, updated some icons that changed with the recent SM upgrade. Subcontracts QRG also reflects a change in the subcontracts window
- 10:29, 17 March 2015 diff hist +261 m LPA:136.13 LPA Policy Changes EPG 136.8.7.3
- 10:27, 17 March 2015 diff hist +128 m LPA:136.8 Local Public Agency Land Acquisition →136.8.7.3 Dedications: Per RW, revision further clarifies the documentation needed when property or property rights are dedicated to an LPA.
- 09:01, 17 March 2015 diff hist -63 m Main Page EPG 616.16
- 08:54, 17 March 2015 diff hist -1,884 m 616.16 Law Enforcement Services Per Design, CM and Traffic, clarified which JSP to use for law enforcement
- 07:24, 17 March 2015 diff hist +162 m 236.16 Outdoor Advertising Per RW, updated link
- 14:45, 16 March 2015 diff hist -109 m Main Page EPG 751.50
- 14:33, 16 March 2015 diff hist +44 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per Bridge, modifed E2.22.
- 07:18, 16 March 2015 diff hist -1 m 236.16 Outdoor Advertising Per RW, updated two links
- 13:42, 13 March 2015 diff hist 0 N File:Main Page Mar 13, 2015.jpg current
- 13:42, 13 March 2015 diff hist -113 m Main Page
- 12:15, 13 March 2015 diff hist -11 m 616.16 Law Enforcement Services →616.16.1 Guidelines for Providing Law Enforcement Services: Per Traffic, the hourly rate for law enforcement has been updated to about $75/hr
- 11:05, 13 March 2015 diff hist +15 m LPA:136.8 Local Public Agency Land Acquisition →136.8.2.1 Funding Requirements: Per RW, updated link
- 15:23, 12 March 2015 diff hist +1 m Main Page
- 12:41, 12 March 2015 diff hist 0 N File:Main Page 3 Mar 12, 2015.jpg current
- 12:41, 12 March 2015 diff hist 0 N File:Main Page 2 Mar 12, 2015.jpg current
- 12:41, 12 March 2015 diff hist 0 N File:Main Page Mar 12, 2015.jpg current
- 12:41, 12 March 2015 diff hist +94 m Main Page
- 10:00, 12 March 2015 diff hist +2,106 m 236.16 Outdoor Advertising Per ODA, updated many links
- 09:24, 12 March 2015 diff hist +3,152 m 236.16 Outdoor Advertising Per ODA, updated scores of links