User contributions for Smithk
Jump to navigation
Jump to search
13 May 2015
- 09:5909:59, 13 May 2015 diff hist 0 N File:751.8.3.2.3a 2015.jpg No edit summary current
- 09:5809:58, 13 May 2015 diff hist 0 N File:751.8.3.2.3 2015.jpg No edit summary current
- 09:5809:58, 13 May 2015 diff hist −8 m 751.8 Concrete Box Culverts →751.8.3.2 Steel Reinforcement
- 09:5709:57, 13 May 2015 diff hist 0 N File:751.8.3.2.2 2015.jpg No edit summary current
- 09:5609:56, 13 May 2015 diff hist 0 N File:751.8.3.2.1 over 2015.jpg No edit summary current
- 09:5609:56, 13 May 2015 diff hist 0 N File:751.8.3.2.1 less 2015.jpg No edit summary current
- 09:5609:56, 13 May 2015 diff hist −2,091 m 751.8 Concrete Box Culverts →751.8.3 Details: Per Bridge, clarified E1 bar marks are used in toe walls both up & down stream; that J6 bars are used in flared wings in lieu of J1 bars; added bending diagrams for R1 and R2 bars
- 09:5309:53, 13 May 2015 diff hist 0 N File:751.8 Reference Guide SBC.pdf No edit summary
- 09:1909:19, 13 May 2015 diff hist +857 m 171.6 Roadsides Per Maintenance, updated links
- 08:4908:49, 13 May 2015 diff hist −13 m 751.8 Concrete Box Culverts Per Bridge, updated Reference Guide SBC
- 08:4708:47, 13 May 2015 diff hist −9 m 750.7 Non-Hydraulic Considerations Per Bridge, updated Reference Guide SBC
- 08:1608:16, 13 May 2015 diff hist +189 m 750.2 Culverts →750.2.11 Data Required on Plans: Per Bridge, added that flow line elevations may be below natural stream bottom.
- 07:3307:33, 13 May 2015 diff hist 0 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way →140.1 Right of Way Encroachments, Maintenance Policy RDS(D1)
- 07:3207:32, 13 May 2015 diff hist 0 N File:140.1 Keep Unauthorized.pdf No edit summary current
- 07:3207:32, 13 May 2015 diff hist +1,301 m Category:140 Encroachments and Items Permitted on MoDOT’s Right of Way Per Maintenance, updated links
12 May 2015
- 12:1412:14, 12 May 2015 diff hist 0 N File:Main Page May 12, 2015.jpg No edit summary current
- 12:1412:14, 12 May 2015 diff hist −485 m Main Page EPG 643
- 11:2111:21, 12 May 2015 diff hist +183 m 643.2 Utilities in Program Delivery →643.2.1.3 Proposed Utility Adjustment Plans: updated JSP link
- 11:1411:14, 12 May 2015 diff hist −7,607 m 643.3 Reserved for Future Use Per Brandi Baldwin, DUE, and Christina Teter, Constr Contract Admin, article reorganized to better reflect CSR. Added online permitting info. Updated some of the bridge attachment info.
- 11:1011:10, 12 May 2015 diff hist 0 N File:643.2.1.13 preaudit checklist.pdf No edit summary current
- 11:0811:08, 12 May 2015 diff hist −12,377 m 643.2 Utilities in Program Delivery Per Brandi Baldwin, DUE, and Christina Teter, Constr Contract Admin, article generally updated and rearranged to current practice, and especially guidance for Change Orders updated.
- 11:0711:07, 12 May 2015 diff hist −2,965 m 643.1 Utility Location Per Brandi Baldwin, DUE, updating info on "no utility impact" projects and removed detail of liability acceptance, as requested by CCO. Directing to CCO policy instead.
- 09:0109:01, 12 May 2015 diff hist −13 m Category:Safe and Sound →Roadway Job Special Provisions (JSPs): updated JSP link
- 08:5708:57, 12 May 2015 diff hist +183 m 643.2 Utilities in Program Delivery →643.2.1.3 Proposed Utility Adjustment Plans: updated JSP link
- 08:5408:54, 12 May 2015 diff hist +183 m Category:704 Concrete Masonry Repair →704.2 Materials Inspection for Sec 704: updated JSP link
- 08:5308:53, 12 May 2015 diff hist −14 m Category:910 Intelligent Transportation Systems updated JSP link
- 08:5108:51, 12 May 2015 diff hist +184 m 320.2 Release of Subsurface Information →320.2.1.1 General: updated JSP link
- 08:4908:49, 12 May 2015 diff hist +138 m LPA:136.7 Design →136.7.5.1 Additive Alternates: updated JSP link
- 08:4508:45, 12 May 2015 diff hist +183 m Category:1066 Mortars and Grout →1066.1 Procedure: updated link
- 08:4308:43, 12 May 2015 diff hist +183 m Category:822 Roadside Vegetation Management →Design Aspects of Mowing: Updated link
- 08:4208:42, 12 May 2015 diff hist +366 m Category:625 Slab Stabilization Updated JSP links
- 08:4008:40, 12 May 2015 diff hist +368 m 237.14 Electronic Design Data Delivery (BIM Deliverables) Updated JSP links
- 08:3508:35, 12 May 2015 diff hist −16 m 237.9 Submission of Plans and Supporting Documents →237.9.6.4 Electronic JSP Review and Submittal Process, Roadway: updated JSP link
- 08:3308:33, 12 May 2015 diff hist −11 m 237.9 Submission of Plans and Supporting Documents →237.9.6.2 PS&E Submittal: updated JSP link
- 08:2708:27, 12 May 2015 diff hist +175 m Category:405 Processing Reclaimed Asphalt →405.3 Two Inch HIR (Use JSP-08-05): Updated JSP link
- 08:2308:23, 12 May 2015 diff hist +175 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.1 Coldmilling Existing Ashaltic Concrete Pavement: Updated JSP link
- 08:2108:21, 12 May 2015 diff hist +175 m Category:622 Pavement and Bridge Surface Removal and Texturing →622.2 Diamond Grinding Existing Portland Cement Concrete Pavement: Updated JSP link
- 08:1308:13, 12 May 2015 diff hist −11 m 237.8 Contract Time Updated JSP link
- 07:5907:59, 12 May 2015 diff hist −18 Category:Safe and Sound →Roadway Job Special Provisions (JSP’s)
- 07:5807:58, 12 May 2015 diff hist −1 Category:Safe and Sound →Contracting Issues
- 07:5507:55, 12 May 2015 diff hist −6 m 147.2 Add Alternate Bidding No edit summary
- 07:4907:49, 12 May 2015 diff hist +329 m LPA:136.13 LPA Policy Changes EPG 136.7.3.1.2
- 07:4407:44, 12 May 2015 diff hist −185 m LPA:136.7 Design →136.7.3.1.2 Job Special Provisions: Several links updated to the new SharePoint link for JSPs
- 07:2707:27, 12 May 2015 diff hist −139 m Main Page Change Code QRG
- 07:2107:21, 12 May 2015 diff hist 0 m Category:101 Standard Forms →Quick Reference Guides (QRGs) 20px: Per CM, clarified "Change Order Codes" QRG to to better describe which reason code should be used in any situation
- 07:2107:21, 12 May 2015 diff hist 0 N File:Change Order Codes 2015.doc No edit summary current
- 07:2007:20, 12 May 2015 diff hist 0 m Category:109 Measurement and Payment Per CM, clarified "Change Order Codes" QRG to to better describe which reason code should be used in any situation
11 May 2015
- 10:1510:15, 11 May 2015 diff hist +36 m Main Page EPG 616.13
- 10:1210:12, 11 May 2015 diff hist 0 N File:616.13 WZ Impact.xlsx No edit summary current
- 10:1210:12, 11 May 2015 diff hist +3 m 616.19 Work Zone Capacity, Queue and Travel Delay Per Traffic, updated the WZ Impact Analysis spreadsheet