User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:18, 8 July 2015 diff hist 0 m 751.40 LFD Widening and Repair 751.40 Widening and Repair (Non-LRFD) moved to 751.40 Widening and Repair (Non-LFD): Per BR, updated article's title - from "Non- LRFD" to "Non-LFD". No other changes needed.
- 09:18, 8 July 2015 diff hist +50 N 751.40 Widening and Repair (Non-LRFD) 751.40 Widening and Repair (Non-LRFD) moved to 751.40 Widening and Repair (Non-LFD): Per BR, updated article's title - from "Non- LRFD" to "Non-LFD". No other changes needed.
- 14:55, 7 July 2015 diff hist 0 N File:Main Page July 7, 2015.jpg current
- 14:54, 7 July 2015 diff hist -19 m Main Page
- 10:41, 7 July 2015 diff hist -608 m Main Page EPG 109.12
- 10:28, 7 July 2015 diff hist 0 N File:109.12 Truth Table July 2015.docx
- 10:26, 7 July 2015 diff hist +251 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per CM, under our agreement with FHWA, Level 2 change orders will be sent to FHWA for review.
- 10:07, 7 July 2015 diff hist +158 m Category:450 Bituminous Pavement Design
- 10:04, 7 July 2015 diff hist 0 N File:450 Options.pdf current
- 10:03, 7 July 2015 diff hist +105 m Category:450 Bituminous Pavement Design Per CM, added figure for min. placement depths and %AC by volume for asphalt treatment options
- 09:02, 7 July 2015 diff hist +151 m Main Page updated links
- 08:36, 7 July 2015 diff hist +114 m Category:401 Bituminous Base and Pavement →401.2.4 Gradation Control (Sec 401.5): Per CM, correction to match spec that the AC be be within 0.3% of the job-mix formula
- 08:01, 7 July 2015 diff hist +27 m 902.5 Traffic Control Signal Features (MUTCD Chapter 4D) →902.5.43.1 Temporary Stop Signs at Signalized Intersections: corrected incorrect reference
- 07:54, 7 July 2015 diff hist -4 m Category:104 Scope updated link
- 07:48, 7 July 2015 diff hist -4 m 104.7 Scoping Estimates updated link
- 07:46, 7 July 2015 diff hist -4 m 104.12 Scope Changes (Scope, Estimate or Fiscal Year) updated link
- 07:41, 7 July 2015 diff hist -8 m 121.3 The Statewide Transportation Improvement Program (STIP) updated link
- 12:55, 6 July 2015 diff hist 0 m Main Page
- 13:25, 2 July 2015 diff hist 0 m Main Page
- 15:19, 1 July 2015 diff hist -170 m Main Page EPG 403.1.19 and EPG 502.2
- 15:13, 1 July 2015 diff hist 0 m Category:502 Portland Cement Concrete Base and Pavement →502.2 Material Inspection
- 15:12, 1 July 2015 diff hist 0 m Category:403 Asphaltic Concrete Pavement
- 15:11, 1 July 2015 diff hist +277 m Category:502 Portland Cement Concrete Base and Pavement →502.2 Material Inspection: Per CM, tamper proof bags will be used for these situations and will bring guidance into compliance with the specs and FHWA direction.
- 15:05, 1 July 2015 diff hist +355 m Category:403 Asphaltic Concrete Pavement →403.1.19 Acceptance of Material (Sec 403.19): Per CM, tamper proof bags will be used for these situations and will bring guidance into compliance with the specs and FHWA direction.
- 12:58, 1 July 2015 diff hist 0 N File:Main Page July 1, 2015.jpg current
- 12:57, 1 July 2015 diff hist -55 m Main Page
- 12:39, 1 July 2015 diff hist -301 m 751.50 Standard Detailing Notes →I1. General: Per BR, I1.10a was removed since it is no longer used on plans
- 12:14, 30 June 2015 diff hist -106 m Main Page EPG 143.2, EPG 106.3.2.86
- 10:54, 30 June 2015 diff hist +13 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion →106.3.2.86.3 Procedure
- 10:54, 30 June 2015 diff hist 0 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion
- 10:53, 30 June 2015 diff hist 0 N File:106.3.2.86 casting knife profile.jpg current
- 10:53, 30 June 2015 diff hist 0 N File:106.3.2.86 casting knife.jpg current
- 10:52, 30 June 2015 diff hist +190 m 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion
- 10:30, 30 June 2015 diff hist +4,303 Nm 106.3.2.86 TM-86 Preparation of Samples for Surface Sealer Wet Track Abrasion Per CM, new MoDOT Test Method
- 09:27, 30 June 2015 diff hist +6,993 m Category:143 Practical Design Per EPG, new guidance leads designers to consider typical items during project design to produce a practical application of radical cost control.
- 07:20, 30 June 2015 diff hist +220 m LPA:136.13 LPA Policy Changes Fig 136.6.7
- 07:17, 30 June 2015 diff hist 0 m LPA:136.12 Figures, Glossary and Other Useful Links Fig 136.6.7
- 07:15, 30 June 2015 diff hist 0 N File:136.6.7 2015.docx
- 07:15, 30 June 2015 diff hist 0 m LPA:136.6 Environmental and Cultural Requirements Per Hist Pres, Fig. 136.6.7 updated to correct a technical issue and to reference recently developed bridge documentation standards
- 09:22, 29 June 2015 diff hist -106 m 751.50 Standard Detailing Notes →H6. Pouring and Finishing Concrete Slabs: Per BR, note H6.18 was corrected be removing the circle because the note is not a cell.
- 14:54, 26 June 2015 diff hist -32 m Category:409 Seal Coat Removed outdated pdfs of contract seal coat plan pdf files
- 14:52, 26 June 2015 diff hist -100 m Category:402 Bituminous Surface Leveling Removed outdated pdfs of contract level plan pdf files
- 14:04, 26 June 2015 diff hist 0 N File:402 JSP FY16.doc current
- 14:03, 26 June 2015 diff hist 0 N File:402 FY2016 Contract Leveling Coat Guidelines.docx
- 14:03, 26 June 2015 diff hist +7 m Category:402 Bituminous Surface Leveling correction
- 14:01, 26 June 2015 diff hist -16 m Category:402 Bituminous Surface Leveling The CLC and Seal Coat guidelines and JSP packages were updated
- 14:01, 26 June 2015 diff hist +60 m Main Page corerction to EPG 402 and EPG 409
- 13:54, 26 June 2015 diff hist 0 N File:409 JSP FY16a.doc current
- 13:54, 26 June 2015 diff hist 0 N File:409 FY2016 Contract Seal Coat Guidelines.doc current
- 13:54, 26 June 2015 diff hist 0 m Category:409 Seal Coat corrected files