User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 07:30, 11 August 2015 diff hist +1,057 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per Envir'l, the EPA mandates the Stormwater Compliance and Environmental Specialist be able to execute change orders up to $100000 for erosion control items
- 13:05, 10 August 2015 diff hist -2 m Main Page
- 13:53, 7 August 2015 diff hist +15 m Main Page
- 13:47, 7 August 2015 diff hist +98 m Main Page EPG 606.1.3.1
- 13:43, 7 August 2015 diff hist +544 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Per EPG, requires replacement of ET-Plus end treatment during constr'n or repair, including anytime existing adjacent guardrail is raised or end treatment modified
- 08:02, 6 August 2015 diff hist +34 m 751.4 Reinforced Concrete Design Properties →751.4.1 Reinforced Concrete: Per BR, added non-integral end bents to the list of concrete classes
- 07:54, 6 August 2015 diff hist 0 N File:Main Page Aug 6, 2015.jpg current
- 07:54, 6 August 2015 diff hist +249 m Main Page EPG 751
- 07:13, 6 August 2015 diff hist -274 m 751.6 General Quantities Per BR, concrete coring coring of drilled shafts was removed because it is no longer specified on a set of bridge plans for integrity testing of drilled shafts.
- 07:10, 6 August 2015 diff hist -180 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, concrete coring coring of drilled shafts removed because it is no longer specified on bridge plans for integrity testing of drilled shafts.
- 07:08, 6 August 2015 diff hist -205 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, concrete coring coring of drilled shafts was removed because it is no longer specified on a set of bridge plans for integrity testing of drilled shafts.
- 08:36, 5 August 2015 diff hist +47 m 236.17 Junkyards Per RW, updated Controlled Travelways Map
- 07:17, 5 August 2015 diff hist +18 m 236.7 Negotiation updated link
- 08:43, 4 August 2015 diff hist +3 m Main Page
- 10:31, 31 July 2015 diff hist -10 m Main Page
- 10:31, 31 July 2015 diff hist 0 N File:Main Page July 31, 2015.jpg current
- 10:30, 31 July 2015 diff hist -18 m Main Page EPG 234.2
- 09:47, 31 July 2015 diff hist +282 m 234.2 Diamond Interchanges →234.2.1.1 Ramp and Preliminary Plan Criteria: added clarifying note
- 09:30, 31 July 2015 diff hist 0 N File:234.2.1.1 Diamond Interchange.pdf current
- 09:30, 31 July 2015 diff hist +597 m 234.2 Diamond Interchanges Per Design, updated 700' dimension between ramp termini in the conventional diamond to 800' to reflect FHWA guidance
- 14:36, 30 July 2015 diff hist 0 m Main Page
- 12:34, 29 July 2015 diff hist -37 m Main Page
- 12:32, 29 July 2015 diff hist 0 N File:Main Page July 29, 2015.jpg current
- 12:31, 29 July 2015 diff hist +312 m Main Page
- 07:12, 29 July 2015 diff hist 0 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.10 Approach Markings for Obstructions (MUTCD Section 3B.10)
- 07:12, 29 July 2015 diff hist 0 m 620.2 Pavement and Curb Markings (MUTCD Chapter 3B) →620.2.10 Approach Markings for Obstructions (MUTCD Section 3B.10)
- 14:35, 27 July 2015 diff hist 0 m Main Page
- 13:39, 27 July 2015 diff hist +395 m LPA:136.13 LPA Policy Changes EPG 136.9.4.1.1.5
- 13:37, 27 July 2015 diff hist -60 m LPA:136.9 Plans, Specs and Estimates (PSE) →136.9.4.1.1.5 Suspension and Debarment Certification (23 CFR 635.112): Per LPA, replaced outdated link with a new, useful one
- 09:41, 27 July 2015 diff hist 0 m 751.40 LFD Widening and Repair 751.40 Widening and Repair (Non-LFD) moved to 751.40 Widening and Repair (LFD and Not Updated): New title requested by BR
- 09:41, 27 July 2015 diff hist +62 N 751.40 Widening and Repair (Non-LFD) 751.40 Widening and Repair (Non-LFD) moved to 751.40 Widening and Repair (LFD and Not Updated): New title requested by BR current
- 09:16, 27 July 2015 diff hist 0 m 751.40 LFD Widening and Repair →751.40.2.5 Temporary Traffic Control Device: Per BR, updated link
- 09:14, 27 July 2015 diff hist +89 m 751.1 Preliminary Design →751.1.2.11 Temporary Barriers: Per BR, an update that was inadvertently not included in a 2012 revision. Revised guidance for bolt-through-deck when lateral deflection cannot be tolerated.
- 11:29, 24 July 2015 diff hist -9 m Category:1113 Double Boiled Linseed Oil and Mineral Spirits Per BR, clarification
- 09:25, 24 July 2015 diff hist +292 m LPA:136.13 LPA Policy Changes CUF Form
- 09:24, 24 July 2015 diff hist +4 m LPA:136.11 Local Public Agency Construction Per ECR, updated CUF Form
- 09:23, 24 July 2015 diff hist 0 N File:146 CUF July 27 2015.pdf
- 09:23, 24 July 2015 diff hist +9 m Category:146 Disadvantaged Business Enterprise (DBE) Per ECR, updated CUF Form
- 09:21, 24 July 2015 diff hist 0 N File:146 CUF July 2015.pdf
- 09:21, 24 July 2015 diff hist +3 m Category:146 Disadvantaged Business Enterprise (DBE) Per ECR, updated CUF Form
- 09:11, 24 July 2015 diff hist -190 m Main Page EPG 236.3.7.5
- 08:51, 24 July 2015 diff hist +18 m 236.3 Administration →236.3.7.5 Distribution of Clearance Certification: Per RW. Guidance for loading documents into RWPA
- 15:10, 23 July 2015 diff hist 0 N File:616.14 WZ Questions 2015.docx
- 15:09, 23 July 2015 diff hist +20 m 616.14 Work Zone Safety and Mobility Policy Per Design, updated WZ Question list with new links
- 14:35, 23 July 2015 diff hist -7 m MediaWiki:Sidebar
- 13:57, 23 July 2015 diff hist +3 m 751.50 Standard Detailing Notes →H7. Slab Drains: Per BR, slight modification to H7.20
- 13:53, 23 July 2015 diff hist -2,376 m Category:1053 Concrete Sealer Per BR and MT, removed references to linseed oil which is no longer used
- 13:48, 23 July 2015 diff hist +30 m Category:703 Concrete Masonry Construction →703.5 Laboratory Testing for Sec 703: Per BR and MT, removed references to linseed oil which is no longer used
- 13:28, 23 July 2015 diff hist 0 N File:Main Page July 23, 2015.jpg current
- 13:27, 23 July 2015 diff hist -316 m Main Page EPG 616.14