User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 09:07, 18 August 2015 diff hist -642 m 236.5 Property Management Per RW, updated links
- 09:03, 18 August 2015 diff hist -189 m 236.3 Administration Per RW, updated links
- 08:59, 18 August 2015 diff hist -82 m 236.14 Change in Route Status Report →236.14.5 Implementation of Approved Changes in Route Status: Updated links, per RW
- 08:46, 17 August 2015 diff hist 0 N File:123.1.1 PoDI FY16.xlsm
- 08:46, 17 August 2015 diff hist 0 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System
- 08:45, 17 August 2015 diff hist -456 m Category:123 Federal-Aid Highway Program →123.1.1 FHWA Oversight - National Highway System: Per Design, updated PoDI list
- 08:43, 17 August 2015 diff hist -25 Category:1180 Bituminous Stockpile Patching Material
- 08:42, 17 August 2015 diff hist +25 m Category:1180 Bituminous Stockpile Patching Material
- 08:32, 17 August 2015 diff hist 0 N File:136.11 Buy America Brochure.pdf current
- 08:31, 17 August 2015 diff hist +148 m LPA:136.11 Local Public Agency Construction Per LPA, added "Buy America" brochure
- 07:43, 17 August 2015 diff hist +28 m Main Page
- 07:36, 17 August 2015 diff hist -43 m Main Page EPG 806.7.6
- 07:16, 17 August 2015 diff hist +496 m Category:806 Pollution, Erosion and Sediment Control →806.7.6 Basis of Payment: Per Stormwater Compliance Coord'r, to comply with the Consent Decree, erosion control change order guidance has been provided.
- 13:31, 14 August 2015 diff hist 0 m Main Page
- 10:20, 14 August 2015 diff hist 0 N File:101 bottom.jpg current
- 10:20, 14 August 2015 diff hist +40 m Category:101 Standard Forms →Right of Way: added photo
- 08:49, 14 August 2015 diff hist -1 m Category:150 Quality Management
- 08:48, 14 August 2015 diff hist -1 m Category:101 Standard Forms →Materials Related
- 08:46, 14 August 2015 diff hist +200 m Category:101 Standard Forms →Materials Related: Per CM, replaced "Asphalt Inspectors Worksheet: Plant Inspection" with 2 forms: Asphalt Inspection Worksheet Cumulative Gradation and Non-cumulative
- 07:48, 14 August 2015 diff hist +1 m Category:151 Administrative Rule Creation or Modification Process
- 07:48, 14 August 2015 diff hist 0 N File:151.jpg current
- 07:47, 14 August 2015 diff hist +32 m Category:151 Administrative Rule Creation or Modification Process added photo
- 14:50, 13 August 2015 diff hist -218 m LPA:136.9 Plans, Specs and Estimates (PSE) Updated the numerous 23 CFR 635 links
- 12:26, 13 August 2015 diff hist -511 m Category:145 Transportation Management Systems (TMS) Per TP, updated links to TMS
- 12:24, 13 August 2015 diff hist +1 m Category:145 Transportation Management Systems (TMS)
- 14:58, 12 August 2015 diff hist +33 m 751.37 Drilled Shafts →Table 751.37.1.1 Summary of drilled shaft dimensions with minimum and maximum values
- 14:41, 12 August 2015 diff hist +1 m 751.37 Drilled Shafts →Table 751.37.1.1 Summary of drilled shaft dimensions with minimum and maximum values: Per BR, correction of "inside" to "outside" diameter. This was overlooked in a previous revision.
- 11:14, 12 August 2015 diff hist 0 N File:Main Page 4 Aug 12, 2015.jpg current
- 11:14, 12 August 2015 diff hist 0 N File:Main Page 3 Aug 12, 2015.jpg current
- 11:14, 12 August 2015 diff hist 0 N File:Main Page 2 Aug 12, 2015.jpg current
- 11:14, 12 August 2015 diff hist 0 N File:Main Page Aug 12, 2015.jpg current
- 11:13, 12 August 2015 diff hist +133 m Main Page new photos
- 10:57, 12 August 2015 diff hist +2 m Category:200 GEOMETRICS
- 10:56, 12 August 2015 diff hist 0 N File:200 design.jpg current
- 10:56, 12 August 2015 diff hist +37 m Category:200 GEOMETRICS added photo
- 09:06, 12 August 2015 diff hist +249 m Category:1029 Fabricating Prestressed Concrete Members for Bridges →1029.2.1 Materials: Per CM Physical Lab, clarified guidance by adding that ASTM A706 steel can be substituted for Gr 40/60
- 07:44, 11 August 2015 diff hist +58 m Main Page EPG 109.12
- 07:30, 11 August 2015 diff hist +1,057 m Category:109 Measurement and Payment →109.12 Change Orders (for Sec 109.12): Per Envir'l, the EPA mandates the Stormwater Compliance and Environmental Specialist be able to execute change orders up to $100000 for erosion control items
- 13:05, 10 August 2015 diff hist -2 m Main Page
- 13:53, 7 August 2015 diff hist +15 m Main Page
- 13:47, 7 August 2015 diff hist +98 m Main Page EPG 606.1.3.1
- 13:43, 7 August 2015 diff hist +544 m 606.1 Guardrail →606.1.3.1 3R/4R Projects: Per EPG, requires replacement of ET-Plus end treatment during constr'n or repair, including anytime existing adjacent guardrail is raised or end treatment modified
- 08:02, 6 August 2015 diff hist +34 m 751.4 Reinforced Concrete Design Properties →751.4.1 Reinforced Concrete: Per BR, added non-integral end bents to the list of concrete classes
- 07:54, 6 August 2015 diff hist 0 N File:Main Page Aug 6, 2015.jpg current
- 07:54, 6 August 2015 diff hist +249 m Main Page EPG 751
- 07:13, 6 August 2015 diff hist -274 m 751.6 General Quantities Per BR, concrete coring coring of drilled shafts was removed because it is no longer specified on a set of bridge plans for integrity testing of drilled shafts.
- 07:10, 6 August 2015 diff hist -180 m 751.37 Drilled Shafts →751.37.1.6 General Detail Considerations: Per BR, concrete coring coring of drilled shafts removed because it is no longer specified on bridge plans for integrity testing of drilled shafts.
- 07:08, 6 August 2015 diff hist -205 m 751.50 Standard Detailing Notes →E2. Foundation Data Table: Per BR, concrete coring coring of drilled shafts was removed because it is no longer specified on a set of bridge plans for integrity testing of drilled shafts.
- 08:36, 5 August 2015 diff hist +47 m 236.17 Junkyards Per RW, updated Controlled Travelways Map
- 07:17, 5 August 2015 diff hist +18 m 236.7 Negotiation updated link