User contributions
Jump to navigation
Jump to search
This user is currently blocked. The latest block log entry is provided below for reference:
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 3 Contractor Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 2 Contractor Striping.pdf
- 08:32, 20 October 2015 diff hist 0 N File:402 CLC Traffic Control 1 Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Transitions Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Quantities Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Typical Contractor Striping.pdf
- 08:31, 20 October 2015 diff hist 0 N File:402 CLC Title Contractor Striping.pdf
- 08:30, 20 October 2015 diff hist +1,207 m Category:402 Bituminous Surface Leveling Per DE, for convenience, added pdf files of the seed files
- 07:27, 20 October 2015 diff hist +70 m LPA:136.8 Local Public Agency Land Acquisition Per RW, clarified guidance by adding a reference to the LPA RW Acquisition brochure
- 14:50, 19 October 2015 diff hist 0 m Main Page
- 14:03, 16 October 2015 diff hist -49 m Main Page EPG 236.4.6.3
- 13:49, 16 October 2015 diff hist -48 m 236.4 Description Writing and Titles →236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions: Per RW, minor change allowing conveyance of utility easements to the utility prior to completion of the project
- 12:46, 16 October 2015 diff hist 0 N File:616.23.1 daytime.jpg current
- 12:46, 16 October 2015 diff hist +42 m 616.23 Traffic Control for Field Operations →616.23.1 Definitions: added photo
- 07:29, 16 October 2015 diff hist +152 m LPA:136.13 LPA Policy Changes Fig. 136.9.3
- 07:26, 16 October 2015 diff hist -1 m LPA:136.12 Figures, Glossary and Other Useful Links Fig. 136.9.3
- 07:26, 16 October 2015 diff hist 0 N File:136.9.3 Oct 2015.doc
- 07:25, 16 October 2015 diff hist -7 m LPA:136.9 Plans, Specs and Estimates (PSE) Per DE, updated Fig. 136.9.3, Fed Proj Bid Proposal Boilerplate, to include DBE JSP for Liquid Asphalt
- 11:20, 15 October 2015 diff hist -138 m Main Page EPG 907.3.3 and EPG 106.3.2.54.7
- 10:55, 15 October 2015 diff hist -1 m 106.3.2.54 TM-54, Asphalt Cement Content of Bituminous Mixtures by the Nuclear Method →106.3.2.54.7 Field Testing: Per CM, guidance brought into conformance with AASHTO T287 current
- 10:45, 15 October 2015 diff hist -8 m 907.3 Travel Safe Zones →907.3.3 Procedure
- 10:44, 15 October 2015 diff hist 0 m 907.3 Travel Safe Zones →907.3.3 Procedure
- 10:44, 15 October 2015 diff hist +3 m 907.3 Travel Safe Zones →907.3.3 Procedure
- 10:43, 15 October 2015 diff hist +2,062 m 907.3 Travel Safe Zones →907.3.3 Procedure: Per TS, the Travel Safe Zone procedure was clarified
- 13:45, 14 October 2015 diff hist -58 m Main Page EPG 760.4.2, EPG 821.25
- 13:14, 14 October 2015 diff hist 0 N File:821.25 Perspective General Information 2015.docx
- 13:13, 14 October 2015 diff hist 0 N File:821.25 Milestone General Information 2015.docx
- 13:13, 14 October 2015 diff hist +6 m 821.25 Products Per MT, small change of Milestone and Perspective info to clearly show MoDOT does not eliminate all milkweed. This is part of the nat'l attention on Monarch butterflies and general lack of pollinators
- 12:32, 14 October 2015 diff hist +30 m Category:760 General Construction Inspection for Structures →760.4.2 Notification Requirements: Per CM, revision reduces the info collected to what is currently needed by Motor Carriers and Bridge Divisions and clarifies when the info should be submitted.
- 12:26, 14 October 2015 diff hist -23 m Category:760 General Construction Inspection for Structures
- 12:24, 14 October 2015 diff hist 0 N File:760.4.2 Bridge Clearance Report.docx current
- 12:24, 14 October 2015 diff hist -24 m Category:760 General Construction Inspection for Structures →760.4.2 Notification Requirements: Per CM, revision reduces the info collected to what is currently needed by Motor Carriers and Bridge Divisions and clarifies when the info should be submitted.
- 12:24, 14 October 2015 diff hist -23 m Category:101 Standard Forms →Construction and Materials: Per CM, updated Bridge Clearance Report Form
- 10:17, 14 October 2015 diff hist -182 m Help Article →EPG Approval Process: box presenting info on how to propose a change to the EPG was updated
- 14:59, 13 October 2015 diff hist 0 N File:Main Page 2 Oct 13, 2015.jpg current
- 14:58, 13 October 2015 diff hist 0 N File:Main Page Oct 13, 2015.jpg current
- 14:58, 13 October 2015 diff hist -195 m Main Page EPG 236.3.3
- 12:59, 13 October 2015 diff hist +1 m 751.50 Standard Detailing Notes →A1. Design Specifications, Loadings & Unit Stresses: Per Bridge, minor correction
- 12:13, 13 October 2015 diff hist 0 N File:643.2.1.13 preaudit checklist 2015.pdf current
- 12:12, 13 October 2015 diff hist +5 m 643.2 Local Utility Adjustments - Public and Private Per DE, updated Preaudit Checklist
- 10:34, 13 October 2015 diff hist +294 m LPA:136.13 LPA Policy Changes EPG 136.7.5.3
- 10:29, 13 October 2015 diff hist -10 m LPA:136.7 Design →136.7.5.3 Incentive/Disincentive Provisions: Per Randall Glaser, renamed and updated link to FHWA's Technical Advisory for Incentive/Disincentive for Early Completion.
- 10:06, 13 October 2015 diff hist -1,064 m 236.3 Administration Per RW, update eliminates the need to send a copy of the RW estimate when an A-date is requested. It also eliminates sending a copy of the approved RW plans with the requested A-date.
- 09:13, 13 October 2015 diff hist +269 m Category:235 Preliminary Plans →235.8 Airports: Per DE, minor clarification and added helpful link
- 09:06, 13 October 2015 diff hist -4 m Category:145 Transportation Management Systems (TMS) updated TMS link
- 08:55, 13 October 2015 diff hist -11 m 236.4 Description Writing and Titles →236.4.6.3 Types of Realty Acquired and Clauses to be Used in Property Descriptions: Per RW, minor clarification
- 10:55, 2 October 2015 diff hist +57 m LPA:136.8 Local Public Agency Land Acquisition Per RW, updated link to RSMo 523
- 10:53, 2 October 2015 diff hist -1,900 m 236.7 Negotiation Per RW, updated numerous CCO links
- 10:44, 2 October 2015 diff hist -3,171 m 236.5 Property Management Per RW, updated CCO links
- 14:43, 1 October 2015 diff hist -1 m Main Page